Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210L502 + (ML20210L502)
- ML20210L503 + (ML20210L503)
- ML20210L504 + (ML20210L504)
- ML20210L506 + (ML20210L506)
- ML20210L508 + (ML20210L508)
- ML20210L510 + (ML20210L510)
- ML20210L511 + (ML20210L511)
- ML20210L512 + (ML20210L512)
- ML20210L513 + (ML20210L513)
- ML20210L514 + (ML20210L514)
- ML20210L516 + (ML20210L516)
- ML20210L517 + (ML20210L517)
- ML20210L518 + (ML20210L518)
- ML20210L519 + (ML20210L519)
- ML20210L520 + (ML20210L520)
- ML20210L521 + (ML20210L521)
- NUREG-0560, Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress + (ML20210L522)
- ML20210L523 + (ML20210L523)
- ML20210L526 + (ML20210L526)
- ML20210L527 + (ML20210L527)
- IR 05000348/1986017 + (ML20210L529)
- ML20210L531 + (ML20210L531)
- ML20210L532 + (ML20210L532)
- PY-CEI-NRR-2202, Informs That USAR Change Was Implemented to Place Commitment Re Inclusion of Qualitative Assessment for Drywell Bypass Leakage from 961206 Submittal Into USAR App 1B on 970812. Change Incorporated Commitment in Entirety + (ML20210L534)
- ML20210L537 + (ML20210L537)
- ML20210L538 + (ML20210L538)
- IR 05000352/1986001 + (ML20210L540)
- ML20210L542 + (ML20210L542)
- ML20210L543 + (ML20210L543)
- 05000320/LER-1986-008-02, :on 860828,nonperformance of May 1986 Monthly Surveillance Test for Fire Suppression Water Sys Valve Lineup Verification Noted.Caused by Personnel Error. Personnel Counseled + (ML20210L546)
- ML20210L547 + (ML20210L547)
- ML20210L549 + (ML20210L549)
- ML20210L550 + (ML20210L550)
- PNO-IV-86-030, on 860924,following Reactor Trip on High RCS Pressure,Quench Tank Parameters & Tail Pipe Temp Indicated That One or Both Pressurizer Safety Valves Lifted.Caused by Improper Setup During Lift Test.Retest in Progress + (ML20210L551)
- ML20210L555 + (ML20210L555)
- ML20210L559 + (ML20210L559)
- ML20210L565 + (ML20210L565)
- ML20210L568 + (ML20210L568)
- ST-HL-AE-5623, Application for Amends to Licenses NPF-76 & NPF-80,revising Allowed Tolerance of RCS Volume Provided in TS 5.4.2 to Account for SG Tube Plugging + (ML20210L569)
- ML20210L571 + (ML20210L571)
- ML20210L578 + (ML20210L578)
- ML20210L580 + (ML20210L580)
- ML20210L587 + (ML20210L587)
- ML20210L588 + (ML20210L588)
- ML20210L594 + (ML20210L594)
- ML20210L596 + (ML20210L596)
- ML20210L600 + (ML20210L600)
- ML20210L602 + (ML20210L602)
- ML20210L609 + (ML20210L609)
- 05000254/LER-1986-025-03, :on 860827,certain Small Bore Torus Attached Piping Not within Allowable Operability Limits.Caused by Inadequate Design Review.Piping Support Hangers Will Be Modified + (ML20210L610)
- ML20210L622 + (ML20210L622)