ML20210L526

From kanterella
Jump to navigation Jump to search
Forwards Criteria Documents Containing Proposed Sample Selection Criteria for Listed Areas Re Independent Corrective Action Verification Program.Comments Should Be Provided at Earliest Convenience
ML20210L526
Person / Time
Site: Millstone 
Issue date: 08/18/1997
From: Schopfer D
SARGENT & LUNDY, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-9583-100 NUDOCS 9708210209
Download: ML20210L526 (4)


Text

--

I p[g j;

c W

f

~ " '

{

Be" s genrEM LuncJy ' $ c

/}/

- Don K. Seeptor 5I$$sN August 18,1997 Project No. 9583100 Docket No. 50 423 Northeast Nuclear Energy Company

- Millstone Nuclear Power Station Unit 3 -

Independent Corrective Action Verification Program d States Nuclear Regulatory Commission A

stion: Document Control Desk Wannington, D. C 20555 The, Confirmatory Order establishing the Independent Corrective Action. Verification Program for Millstor.e Units 1, 2, and 3, dated August 14, 1996, and the associated.

Commission Paper (SECY.97 003) released January 30,1997, require that the review include a sample of changes made to the facility configuration since issuance of the operating license through processes other than the design change processes, in order to establish a criteria for selecting these samples, it was mutually agreed that a listing of E

facility changes in each area of review would first be obtained from NU, In our letters f'

dated July 22,1997 and August 4,1997, we provided saraple selection criteria for eight of the ten review areas. Change lists have now been provided to S&L for the following final-tWo arest'

--l.

Temporary Alterations

2. Vendor Manuals As discussed in our meeting of July 17,1997, we have enclosed criteria documents which-contain our proposed sample selection critem for these areas.. Please provide your-comments or concurrence for these criteria at your carliest convenience.

il

.p\\cD\\ w 11!!MllHlltil 9708210209 970818

~

PDR ADOCK 05000423 0

PDR

$5 Eas.t Montoe Street 7 hicago il 60603 5780 USA

  • 312-269-2000 _

C L

N

i United States Nuclear Regulatory Commission August 18,1997 l

Document Control Desk Page 2 l

Please direct any questions to me at 312 269-6078.

Yours very infly, hof b:%"

D. X. Sch pfer i

Vice President and ICAVP Manager DKS:TJR:pah

- Coples:

E. Imbro (1/4) Deputy Director, ICAVP Oversight T. Concannon (1/2) Nuclear Energy Advisory Council J. Fourgere (l/3) N11 B. A. Erler (1/0)

File (MWP-IcAYtWMgCw97NRosit &w)

D

=-

.=._

(k.

Millstone 3 - ICAVP Programmatic Review Past Change Review Selection Criteria Temporary Alterations e Millstone Status:

Approximately 1,060 temporary alterations (bypass jumpers) made from 1985 through 1996 To establish the ICAVP sample, select:

e 1.

A mix of both electrical and mechanical temporary alterations.

2.

Temporary alterations primarily in safety-related systems.

3.

Two temporary alternations for each year (total 22). (Note: None selected for 1985 as only three were processed.)

(G:\\TJR\\NEU\\ MISC 0714. doc)

___a

jk

,r 9

Millstone 3 - ICAVP Programmatic Review - Past Change Review Selection Criteria 1

Vendor Manuals

  • Ministone Status:

Vendor Manuals changed since start up ~ 182 (1986 to 1997)

To establish the ICAVP sample, select:

1.

Changes outside the scope of the ICAVP sample systems.

2.

A sample which is biased to emphasize:

a)

Manuals with significant safety impact b)

Manuals with ASME Section XI implications 3.

Ten changes to different vendor manuals.

l (OATJR\\NEU\\ MISC 0714. doc)