Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6251, Interim Deficiency Rept CP-86-07 Re Svc Water Sys Leakage. Initially Reported on 860411.Pipeline Coating Insps Underway for Unit 1 & Planned for Unit 2.Next Rept Expected by 870327 + (ML20209B728)
- ML20209B730 + (ML20209B730)
- ML20209B731 + (ML20209B731)
- IA-87-120, Informs That Concerns Expressed in 820825 Ltr & at 820902 Meeting Re Fire Protection Exemption Request Review Process Unfounded.Target Completion Date of 830101 Will Not Be Met at Expense of in-depth Review of Each Request + (ML20209B732)
- ML20209B732 + (ML20209B732)
- ML20209B736 + (ML20209B736)
- ML20209B738 + (ML20209B738)
- ML20209B739 + (ML20209B739)
- ML20209B741 + (ML20209B741)
- ML20209B745 + (ML20209B745)
- 05000336/LER-1987-001, :on 861222,intermittent Fire Alarms Received from Heat Detectors Above Reactor Coolant Pump 5.Caused by Heat Detector Failure.Faulty Detector Will Be Replaced.W/ + (ML20209B746)
- ML20209B750 + (ML20209B750)
- TXX-6254, Interim Deficiency Rept CP-86-49 Re Conax Adaptor Modules & Electrical Penetrations.Initially Reported on 861010. Procurement & Module Replacement Continuing.Next Rept Expected by 870619 + (ML20209B751)
- ML20209B754 + (ML20209B754)
- ML20209B756 + (ML20209B756)
- PNO-V-86-058, on 860901,controlled Shutdown Conducted Due to Condenser Tube Leakage.Blown Out Plugged Condenser Tube Found.Startup on Hold Due to Cleaning of Steam Generators W/ Chemical Impurities + (ML20209B760)
- ML20209B762 + (ML20209B762)
- ML20209B764 + (ML20209B764)
- ML20209B766 + (ML20209B766)
- ML20209B768 + (ML20209B768)
- ML20209B773 + (ML20209B773)
- ML20209B775 + (ML20209B775)
- 05000440/LER-1986-044, :on 860806,electrical Protection Assembly (EPA) Tripped.Caused by Failure of Capacitors in GE EPA Electronic Process Control (Pc) Board.Replacement of EPA Pc Boards Underway + (ML20209B776)
- ML20209B777 + (ML20209B777)
- ML20209B778 + (ML20209B778)
- ML20209B780 + (ML20209B780)
- ML20209B781 + (ML20209B781)
- VPN-056-99, Responds to NRC 990609 RAI Re License Change Application 244 & Accompanying Request for Exemption.Detailed Info Supports Estimation of Remaining Radioactive Matl Previously Provided by Licensee + (ML20209B782)
- TXX-6246, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Reinsp & Subsequent Engineering Evaluation Initiated.Next Rept Expected by 870422 + (ML20209B784)
- ML20209B785 + (ML20209B785)
- ML20209B786 + (ML20209B786)
- ML20209B787 + (ML20209B787)
- ML20209B791 + (ML20209B791)
- ML20209B792 + (ML20209B792)
- ML20209B794 + (ML20209B794)
- 05000336/LER-1987-002, :on 870102,reactor Tripped on Low Steam Generator Level.Caused by Failure of Steam Generator 2 Feedwater Regulating Valve.Valve Repaired + (ML20209B795)
- ML20209B797 + (ML20209B797)
- ML20209B798 + (ML20209B798)
- ML20209B799 + (ML20209B799)
- ML20209B800 + (ML20209B800)
- ML20209B804 + (ML20209B804)
- ML20209B805 + (ML20209B805)
- ML20209B806 + (ML20209B806)
- L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC + (ML20209B808)
- ML20209B809 + (ML20209B809)
- ML20209B811 + (ML20209B811)
- ML20209B812 + (ML20209B812)
- ML20209B816 + (ML20209B816)
- ML20209B817 + (ML20209B817)
- ML20209B818 + (ML20209B818)
- TXX-6249, Interim Deficiency Rept CP-87-01 Re Static Computer for Safeguards Bldg.Initially Reported on 870114.Design Basis Consolidation Program Evaluation Continuing.Next Rept by 870729 + (ML20209B819)