Forwards Amend 130 to License NPF-1 & Safety Evaluation. Amend Revises Tech Spec Section 3.7.1.4 to Reflect Increase in Min Water Storage Level Required to Be Maintained in Condensate Storage Tank,Per Util 851029 & 870109 Requests
ML20209B775
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/22/1987
From: Chan T
Office of Nuclear Reactor Regulation
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20209B779 List:
References
TAC-60095, NUDOCS 8704280514
Download: ML20209B775 (3)


Text

-

a .

April 22,1987 Docket No. 50-344 DISTRIBUTION C N NRC PDR' Local PDR PDf3 Rdg. T. Novak C. Vogan T. Chan 0GC L. Harmon Mr. David W. Cockfield E. Jordan B. Grimes J. Partlow Vice President, Nuclear T. Barnhart(4) W. Jones E. Butcher Portland General Electric Company N. Thompson ACRS (10) OPA LFMB 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Cockfield:

SUBJECT:

ISSUANCE OF AMENDMENT NO.130 TO FACILITY OPERATING LICENSE NO.

NPF-1 TROJAN NUCLEAR PLANT (TAC NO. 60095)

The Commission has issued the enclosed Amendment No.130 to Facility Operating License No. NPF-1 for the Trojan Nuclear Plant. The amendment consists of changes to the Technical Specifications in response to your application (LCA 134) dated October 29, 1985, as revised January 9,1987.

The amendment revises Technical Specification Section 3.7.1.4 to reflect an increase in the minimum water level required to be maintained in the condensate storage tank.

A copy of the related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's next regular bi-weekly Federal Register notice.

Sincerely, Terence L. Chan, Project Manager Project Directorate V Division of Reactor Projects-III/IV/V and Special Projects

Enclosures:

1. Amendment No. 130to NPF-1
2. Safety Evaluation cc w/ enclosures:

See next page

  • See Previous Concurrence CN
  • PDf3 *DRSP/PDS *PSB *0GC f : D5 ,

Cvogan TChan:pds JCni; .

ton 4/9/87 4/9/ 7 4/9/87 4/13/87 4/p/87 8704280514 DR 870422 ADOCK 05000344 PDR L

Docket No. 50-344 DISTRIBUTION Docket File NRC PDR Local PDR PDf3 Rdg. T. Novak C. Vogan T. Chan 0GC L. Harmon Mr. David W. Cockfield E. Jordan B. Grimes J. Partlow Vice President, Nuclear T. Barnhart(4) W. Jones E. Butcher Portland-General Electric Company N. Thompson ACRS (10) OPA LFMB 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Cockfield:

The Comission has issued the enclosed Amendment No. to Facility Operating License No. NPF-1 for the Trojan Nuclear Plant. The amendment consists of changes to the Technical Specifications in response to your application (LCA 134) dated October 29, 1985, as revised January 9,1987.

The amendment revises Technical Specification Section 3.7.1.4 to reflect an increate in the minimum water level required to be maintained in the condensate storage tank.

A copy of the related Safety Evaluation is also enclosed. The notice of. issuance will be included in the Comission's next regular bi-weekly Federal Register notice.

Sincerely, i

Terence L. Chan, Project Manager PWR Project Directorate-V:

Division of Reactor Projects, NRR

Enclosures:

1. Amendment No. to NPF-1
2. Safety Evaluation cc w/ enclosures: if See next page gs PDf3 PDf3 PSB OG PD-V CvogarOg TChan:pds slGraitj M40tuul GKnighton 4/3/87 4/j/87 4/f/87 4/t*>/87 4/ /87 c mc @<tc _

4

I I [

Fr. David W. Cockfield Portland General Electric Company Tro,ian Nuclear Plant Cc:  :

Senior Resident Inspector U.S. Nuclear Regulatory Commission l Troian Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Robert M. Hunt,- Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 ,

William T. Dixon ,

, Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Reatonal Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 L

s 3

4 e

.i i j 4

.