Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209B700 + (ML20209B700)
- AECM-87-0084, Advises That Util Incorporated NRC Suggested Clarifications Into Facility Operator Requalification Program Via Rev 6 to Facility Administrative Procedure 01-S-04-2 + (ML20209B701)
- ML20209B702 + (ML20209B702)
- ML20209B703 + (ML20209B703)
- NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl + (ML20209B705)
- ML20209B706 + (ML20209B706)
- ML20209B707 + (ML20209B707)
- LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl + (ML20209B708)
- ML20209B713 + (ML20209B713)
- TXX-6211, Suppls 860402 Response to Violations Noted in Insp Repts 50-445/85-07 & 50-446/85-05.Corrective Actions:Project Directive Issued Emphasizing Requirements for Properly Documenting Design Alternatives Prior to Const Activities + (ML20209B714)
- ML20209B717 + (ML20209B717)
- LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 + (ML20209B718)
- ML20209B719 + (ML20209B719)
- 05000409/LER-1987-001, :on 870107,reactor Scrammed When Turbine Stop Valve Partially Closed.Possibly Caused When Turbine Reset During Simulated Overspeed Test or Oil Pressure at Stop Valve Temporarily Decreasing.Valve Closed + (ML20209B720)
- ML20209B721 + (ML20209B721)
- PNO-III-99-034, on 990702,all Criticality Accident Alarms Adminstratively Declared Inoperable.Certficatee Issued Press Release.Certificatee Remains in Alert Pending Resolution of Operability Issue.Senior Inspector Responded to Site + (ML20209B722)
- ML20209B724 + (ML20209B724)
- A06222, Describes Cause & Corrective Actions for Two Occurrences Re Trip of turbine-driven Auxiliary Feedwater Pump Steam Supply Valve,Per NRC on Insp Rept 50-423/86-33.Valve Labeled to Ensure Valve in Full Counterclockwise Direction + (ML20209B725)
- ML20209B726 + (ML20209B726)
- NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 + (ML20209B727)
- TXX-6251, Interim Deficiency Rept CP-86-07 Re Svc Water Sys Leakage. Initially Reported on 860411.Pipeline Coating Insps Underway for Unit 1 & Planned for Unit 2.Next Rept Expected by 870327 + (ML20209B728)
- ML20209B730 + (ML20209B730)
- ML20209B731 + (ML20209B731)
- IA-87-120, Informs That Concerns Expressed in 820825 Ltr & at 820902 Meeting Re Fire Protection Exemption Request Review Process Unfounded.Target Completion Date of 830101 Will Not Be Met at Expense of in-depth Review of Each Request + (ML20209B732)
- ML20209B732 + (ML20209B732)
- ML20209B736 + (ML20209B736)
- ML20209B738 + (ML20209B738)
- ML20209B739 + (ML20209B739)
- ML20209B741 + (ML20209B741)
- ML20209B745 + (ML20209B745)
- 05000336/LER-1987-001, :on 861222,intermittent Fire Alarms Received from Heat Detectors Above Reactor Coolant Pump 5.Caused by Heat Detector Failure.Faulty Detector Will Be Replaced.W/ + (ML20209B746)
- ML20209B750 + (ML20209B750)
- TXX-6254, Interim Deficiency Rept CP-86-49 Re Conax Adaptor Modules & Electrical Penetrations.Initially Reported on 861010. Procurement & Module Replacement Continuing.Next Rept Expected by 870619 + (ML20209B751)
- ML20209B754 + (ML20209B754)
- ML20209B756 + (ML20209B756)
- PNO-V-86-058, on 860901,controlled Shutdown Conducted Due to Condenser Tube Leakage.Blown Out Plugged Condenser Tube Found.Startup on Hold Due to Cleaning of Steam Generators W/ Chemical Impurities + (ML20209B760)
- ML20209B762 + (ML20209B762)
- ML20209B764 + (ML20209B764)
- ML20209B766 + (ML20209B766)
- ML20209B768 + (ML20209B768)
- ML20209B773 + (ML20209B773)
- ML20209B775 + (ML20209B775)
- 05000440/LER-1986-044, :on 860806,electrical Protection Assembly (EPA) Tripped.Caused by Failure of Capacitors in GE EPA Electronic Process Control (Pc) Board.Replacement of EPA Pc Boards Underway + (ML20209B776)
- ML20209B777 + (ML20209B777)
- ML20209B778 + (ML20209B778)
- ML20209B780 + (ML20209B780)
- ML20209B781 + (ML20209B781)
- VPN-056-99, Responds to NRC 990609 RAI Re License Change Application 244 & Accompanying Request for Exemption.Detailed Info Supports Estimation of Remaining Radioactive Matl Previously Provided by Licensee + (ML20209B782)
- TXX-6246, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Reinsp & Subsequent Engineering Evaluation Initiated.Next Rept Expected by 870422 + (ML20209B784)
- ML20209B785 + (ML20209B785)
- ML20209B786 + (ML20209B786)