Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000528/LER-1986-022, :on 860724,Train B Containment Purge Isolation Actuation Signal Initiated.Caused by Personnel Error.Shift Briefings on Overall Necessity for Strict Procedural Adherence Will Be Conducted + (ML20206M944)
- ML20206M945 + (ML20206M945)
- ML20206M946 + (ML20206M946)
- ML20206M949 + (ML20206M949)
- ML20206M950 + (ML20206M950)
- ML20206M951 + (ML20206M951)
- ML20206M952 + (ML20206M952)
- ML20206M954 + (ML20206M954)
- ML20206M957 + (ML20206M957)
- ML20206M959 + (ML20206M959)
- IR 05000245/1986013 + (ML20206M961)
- ML20206M963 + (ML20206M963)
- ML20206M965 + (ML20206M965)
- ML20206M966 + (ML20206M966)
- 05000482/LER-1986-028, :on 860420 & 22,RHR Placed in Configuration So That Low Pressure Injection Flow Path Into Only 2 of 4 RCS Cold Legs Existed.Caused by Personnel Error.Procedure Being Developed to Maintain RHR Temps + (ML20206M968)
- ML20206M969 + (ML20206M969)
- ML20206M970 + (ML20206M970)
- ML20206M976 + (ML20206M976)
- ML20206M977 + (ML20206M977)
- 05000266/LER-1999-003, :on 990406,TS SR for ECCS & Containment Spray Was Not Fully Implemented.Caused by Conservative Interpretation of Valve Impact.Revised Procedures.With + (ML20206M978)
- ML20206M979 + (ML20206M979)
- ML20206M980 + (ML20206M980)
- ML20206M984 + (ML20206M984)
- ML20206M985 + (ML20206M985)
- ML20206M986 + (ML20206M986)
- ML20206M987 + (ML20206M987)
- IR 05000443/1986041 + (ML20206M988)
- ML20206M989 + (ML20206M989)
- 05000321/LER-1999-001-04, :on 990412,loss of Scram Valve Air Header Air Pressure & RPS Actuation Were Noted.Caused by Drawing Error. Revised Drawings to Show That Valve 1P52-F501 Provides Air to Scram Valve Air Header.With + (ML20206M990)
- ML20206M991 + (ML20206M991)
- ML20206M992 + (ML20206M992)
- 05000423/LER-1986-042, :on 860725,Train a Safety Injection Actuation Occurred.Caused by Intermittent Resetting of Pressurizer Low Pressure Safety Injection Block.Switch Panel Lugs Adjusted + (ML20206M994)
- ML20206M995 + (ML20206M995)
- IR 05000277/1999002 + (ML20206M997)
- ML20206M998 + (ML20206M998)
- ML20206M999 + (ML20206M999)
- ML20206N000 + (ML20206N000)
- IR 05000289/1986011 + (ML20206N003)
- ML20206N006 + (ML20206N006)
- 05000424/LER-1998-006-03, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements + (ML20206N007)
- 05000315/LER-1986-012-01, :on 860528,during Mode 1,turbine Trip/Reactor Trip Occurred Due to Apparent Overspeed of Main Turbine. Cause Unknown.Trip Deemed Spurious Event.Frequency to Voltage Converter & Comparator Replaced + (ML20206N008)
- ML20206N010 + (ML20206N010)
- ML20206N011 + (ML20206N011)
- ML20206N017 + (ML20206N017)
- ML20206N018 + (ML20206N018)
- ML20206N019 + (ML20206N019)
- ML20206N022 + (ML20206N022)
- ML20206N023 + (ML20206N023)
- ML20206N024 + (ML20206N024)
- ML20206N025 + (ML20206N025)
- ML20206N026 + (ML20206N026)