Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205K550 + (ML20205K550)
- ML20205K552 + (ML20205K552)
- 0CAN108810, Forwards Proposed Rev to Table B-1, Min Staffing Requirements of Emergency Plan.Rev Reduces Required Number of Nonlicensed Operators on-shift from Three to Two + (ML20205K553)
- ML20205K556 + (ML20205K556)
- ML20205K557 + (ML20205K557)
- ML20205K558 + (ML20205K558)
- ML20205K560 + (ML20205K560)
- ML20205K561 + (ML20205K561)
- IR 05000327/1988040 + (ML20205K562)
- ML20205K563 + (ML20205K563)
- ML20205K564 + (ML20205K564)
- RA99-068, Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile + (ML20205K571)
- IR 05000010/1999007 + (ML20205K572)
- ML20205K577 + (ML20205K577)
- ML20205K578 + (ML20205K578)
- ML20205K584 + (ML20205K584)
- 05000409/LER-1999-001, :on 990305,excessive back-flow Through Return Line Check Valve Was Noted.Check Valve Were Declared Inoperable.Compensatory Actions for Fesw Sys Pipe Break Were Established.With + (ML20205K586)
- ML20205K587 + (ML20205K587)
- 0CAN049902, Informs That Corrective Action Re Software Evaluation,Per Insp Repts 50-313/98-04 & 50-368/98-04,has Been Completed. Protective Tagging Sys Expected to Be Fully Operational by 990514 + (ML20205K588)
- ML20205K589 + (ML20205K589)
- PY-CEI-NRR-2386, Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing + (ML20205K592)
- ML20205K593 + (ML20205K593)
- TXX-6359, Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Expected by 870612 + (ML20205K597)
- ML20205K598 + (ML20205K598)
- ML20205K599 + (ML20205K599)
- ML20205K600 + (ML20205K600)
- ML20205K603 + (ML20205K603)
- B17717, Forwards non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Point Unit 3 Spent Fuel Pool, Per Request. Rept Provided as Suppl Info for 990118 Application + (ML20205K604)
- ML20205K609 + (ML20205K609)
- ML20205K610 + (ML20205K610)
- ML20205K611 + (ML20205K611)
- ML20205K614 + (ML20205K614)
- ML20205K615 + (ML20205K615)
- ML20205K617 + (ML20205K617)
- NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with + (ML20205K620)
- ML20205K624 + (ML20205K624)
- ML20205K625 + (ML20205K625)
- ML20205K626 + (ML20205K626)
- ML20205K629 + (ML20205K629)
- ML20205K634 + (ML20205K634)
- ML20205K638 + (ML20205K638)
- ML20205K643 + (ML20205K643)
- ML20205K646 + (ML20205K646)
- ML20205K652 + (ML20205K652)
- ML20205K654 + (ML20205K654)
- B17724, Informs That Millstone Unit 2 Is Expected to Be Ready for Ascension to Mode 2 on or About 990414.Unit Affirmed for Readiness for Restart Pending Approval from Nuclear Oversight.Startup Will Be Controlled IAW Plan in + (ML20205K655)
- ML20205K663 + (ML20205K663)
- ML20205K664 + (ML20205K664)
- 05000395/LER-1999-001, :on 990311,missed Surveillance Test for Electrical Equipment Protective Devices Was Noted.Caused by Inadequate Surveillance Tps.Fire Watches Were Posted Per TS 3.8.4.3 LCO Requirements.With + (ML20205K666)
- ML20205K669 + (ML20205K669)
- ML20205K672 + (ML20205K672)