Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SVP-99-062, Informs NRC of Rev to Schedule for Analytically Demonstrating That Cumulative Usage Factor for Reactor Vessel Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period + (ML20205K001)
- ML20205K006 + (ML20205K006)
- ML20205K008 + (ML20205K008)
- SVP-99-025, Transmits Remediation Plan for Plant Intergranular Stress Corrosion Cracking Susceptible Welds,Per GL 88-01.Encl Includes Util Assessment of Recirculation Suction Valve, 1-0202-4A + (ML20205K010)
- ML20205K011 + (ML20205K011)
- ML20205K012 + (ML20205K012)
- ML20205K018 + (ML20205K018)
- ML20205K019 + (ML20205K019)
- ML20205K021 + (ML20205K021)
- ML20205K026 + (ML20205K026)
- ML20205K028 + (ML20205K028)
- ML20205K029 + (ML20205K029)
- ML20205K035 + (ML20205K035)
- ML20205K036 + (ML20205K036)
- ML20205K038 + (ML20205K038)
- ML20205K039 + (ML20205K039)
- IR 05000312/1988030 + (ML20205K040)
- ML20205K046 + (ML20205K046)
- ML20205K048 + (ML20205K048)
- ML20205K050 + (ML20205K050)
- SNRC-1236, Forwards Ps Cassidy Resume as Sixth Qualified Backup Shift Technical Advisor for Approval.Pa Cassidy Believed to Be Fully Qualified Based on Training & Experience + (ML20205K057)
- ML20205K059 + (ML20205K059)
- 05000155/LER-1986-001-01, :on 860117,discovered That Three Fire Detectors in Recirculation Pump Room Not Tested During 1985 Refueling Outage.Caused by Procedural Deficiency.New Surveillance Procedure Approved on 860212 + (ML20205K060)
- ML20205K061 + (ML20205K061)
- ML20205K062 + (ML20205K062)
- ML20205K063 + (ML20205K063)
- ML20205K065 + (ML20205K065)
- IR 05000254/1986003 + (ML20205K067)
- ML20205K068 + (ML20205K068)
- ML20205K072 + (ML20205K072)
- ML20205K073 + (ML20205K073)
- IR 05000730/2010031 + (ML20205K077)
- ML20205K089 + (ML20205K089)
- ML20205K090 + (ML20205K090)
- ML20205K091 + (ML20205K091)
- ML20205K092 + (ML20205K092)
- IR 05000413/1988033 + (ML20205K093)
- ML20205K094 + (ML20205K094)
- ML20205K095 + (ML20205K095)
- JPN-99-011, Forwards Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will Delegate Responsibilities to Another Staff Member,In Writing + (ML20205K098)
- ML20205K099 + (ML20205K099)
- ML20205K104 + (ML20205K104)
- JAFP-86-0144, Responds to NRC Re Violations Noted in Insp 50-333/85-28.Corrective Actions:Protective Tagging Ref Tags Cleared & Battery Ventilation Restored & QA Personnel Instructed in Requirements of WACP-10.1.1 + (ML20205K107)
- ML20205K109 + (ML20205K109)
- IR 05000155/1985014 + (ML20205K110)
- ML20205K115 + (ML20205K115)
- 05000352/LER-1999-002-01, :on 990303,failure to Perform TS Surveillance Required Locked Valve Insp Occurred.Caused by Personnel Error.Procedures Revised.With + (ML20205K117)
- ML20205K125 + (ML20205K125)
- ML20205K126 + (ML20205K126)
- ML20205K127 + (ML20205K127)
- 05000382/LER-1986-003, :on 860124,0204 & 09,inadvertent Actuations of ESF Portion of Control Room Ventilation Sys Occurred.Caused by Technician Bumping Monitor,Electrical Spike & Chlorine Detector Alarm.Caution Signs Posted + (ML20205K131)