ML20205K126

From kanterella
Jump to navigation Jump to search
Forwards Bvps,Unit 1 Facility Changes,Tests & Experiments for 970123-980122, IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of SEs
ML20205K126
Person / Time
Site: Beaver Valley
Issue date: 03/30/1999
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205K130 List:
References
L-99-018, L-99-18, NUDOCS 9904120341
Download: ML20205K126 (1)


Text

s a

Beav Vaney Power Staten Shippingport, PA 15077-0004 n or Vi P esident Fan

) 643 U" '[s.Lvj.

March 30, 1999 j

o 9,yi,,n L-99-018

'U. S. Nuclear Regulatory Commission Attention: Document Control Desk j

Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1

)

Docket No. 50-334, License No. DPR-66 Report of Facility Changes, Tes's.2d Experiments In accordance with 10 CFR 50.59, the Annual Report of Facility Changes, Yests, and Experiments for the Beaver Valley Power Station, Unit No.1, is attached. This report provides a brief description of each facility and procedure change and a summary of the safety evaluations. The annual report covers the period of January 23, 1997, through January 22,1998.

Each change was evaluated to determine (1) if the probability of occurrence or the consequences of an accident or the malfunction of equipment important to safety previously evaluated in the Updated Final Safety Analysis Report may be increased, or (2) if a possibility for an accident or malfunction of a different type than any evaluated previously in the Updated Final Safety Analysis Report may be created, or (3) if the margin of safety as defined in the basis for any technical specification is reduced. In each case, it was determined that the change did not constitute an unreviewed safety question as defined in 10 CFR 50.59.

If you have any questions regarding this report, please contact Mr. Mark S.

Ackerman, Manager, Safety and Licensing, at (412) 393-5203.

Sincerely, r

D 0

334

-C R

PDR C

l Sushil C. Jain Attachment Ai DEllVERING c:

Mr. D. S. Collins, Project Manager 0 U A LIT Y Mr. D. M. Kem, Sr. Resident Inspector ENEIGY Mr. H. J. Miller, NRC Region 1 Administrator u