Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205H381 + (ML20205H381)
- ML20205H382 + (ML20205H382)
- ML20205H386 + (ML20205H386)
- PNO-I-86-064, on 860812,reactor Tripped Due to Low Pressure Output of Steam Generator Feedwater Pump gear-driven Pump. Investigation Underway + (ML20205H387)
- ST-HL-AE-2009, Forwards Items G-N of FSAR Table 6.2.1.2-1 Inadvertently Deleted in FSAR Amend 57.Amend Eliminated Reactor Coolant Loop Breaks from Design Basis.Pages Will Be Reinstated in Amend 59.Revised Amend 57 Pages 6.2-102/6.2-141 Also Encl + (ML20205H388)
- ML20205H389 + (ML20205H389)
- ML20205H390 + (ML20205H390)
- ML20205H391 + (ML20205H391)
- IR 05000155/1987003 + (ML20205H392)
- 05000424/LER-1988-006-03, :on 880917,concrete Plug Removed from Underground Auxiliary Feedwater Pipe Trench to Investigate Suspected Steam Leak.On 880927,openings to Trench Observed. Caused by Inadequate Physical Security Plan + (ML20205H394)
- ML20205H399 + (ML20205H399)
- 05000416/LER-1987-003, :on 870225,both Trains of Standby Gas Treatment Sys Inoperable for 3 H.Caused by Personnel Error.Memorandum Issued to All Plant Personnel Reiterating Need for Attention to Details + (ML20205H404)
- ML20205H405 + (ML20205H405)
- ML20205H407 + (ML20205H407)
- ML20205H408 + (ML20205H408)
- ML20205H409 + (ML20205H409)
- ML20205H415 + (ML20205H415)
- ML20205H416 + (ML20205H416)
- ML20205H418 + (ML20205H418)
- ML20205H420 + (ML20205H420)
- AECM-85-0316, Comments on Effects of Cost Curtailment Program on Facility in Response to .Steps Taken to Closely Control Unnecessary Expenditures Will Not Adversely Impact Plant Safety + (ML20205H422)
- ML20205H423 + (ML20205H423)
- ML20205H424 + (ML20205H424)
- ML20205H425 + (ML20205H425)
- ML20205H427 + (ML20205H427)
- ML20205H428 + (ML20205H428)
- ML20205H430 + (ML20205H430)
- IR 05000334/1986015 + (ML20205H431)
- L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite + (ML20205H436)
- ML20205H437 + (ML20205H437)
- ML20205H438 + (ML20205H438)
- ML20205H439 + (ML20205H439)
- ML20205H442 + (ML20205H442)
- ML20205H444 + (ML20205H444)
- ML20205H445 + (ML20205H445)
- ML20205H447 + (ML20205H447)
- ML20205H450 + (ML20205H450)
- ML20205H453 + (ML20205H453)
- ML20205H454 + (ML20205H454)
- ML20205H455 + (ML20205H455)
- ML20205H456 + (ML20205H456)
- TXX-6348, Interim Deficiency Rept CP-86-07 Re Svc Water Sys Leakage. Initially Reported on 860411.Pipe Coating Insp Completed on Accessible Piping in Train a Svc Water Sys W/Coating Repairs Implemented on Problem Areas.Next Rept Expected by 870715 + (ML20205H457)
- ML20205H460 + (ML20205H460)
- PY-CEI-NRR-0615, Special Rept:On 870227,0311 & 17,valid Test & Failures of Div 1 & 2 Diesel Generators Experienced.Caused by Defective Control Air Solenoid Valve & Faulty Control Air Regulator. Valve & Regulator Replaced.Ler Will Be Submitted by 8703 + (ML20205H461)
- IR 05000057/1986001 + (ML20205H462)
- ML20205H465 + (ML20205H465)
- ML20205H467 + (ML20205H467)
- 05000454/LER-1987-004-05, :on 870225,safety Injection Occurred During Maint Troubleshooting.Caused by Personnel Error.Disciplinary Action Taken Against Personnel Involved & Other Instrument Maint Personnel Counseled + (ML20205H475)
- 05000413/LER-1986-038, :on 860712,vent Particulate,Iodine & Gas Radiation Monitors Discovered Inoperable.Caused by Personnel Error.Output Blocking Jumper Removed Following Maint + (ML20205H476)
- 05000302/LER-1987-002, :on 870221,during Monthly Surveillance of Emergency Feedwater Initiation & Control Sys,Technicians Unable to Place Channel B in Bypass for Maint & Testing. Caused by Failure of light-emitting Diode + (ML20205H479)
- 05000370/LER-1987-004-02, :on 870217,discovered That Analog Channel Operational Test on Containment Hydrogen Analyzer 2B Not Performed at Required Intervals.Caused by Personnel Error. Periodic Test Scheduling Procedures Revised + (ML20205H482)