Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20128G1661996-10-0303 October 1996 Summarizes 960924 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Preliminary Responses to Staff RAI Concerning Request to Change EALs for TMI-1.List of Participants & Copy of Preliminary Response to RAI Encl 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months 1999-09-29
[Table view] |
Text
_ -__ _____- - ____ __ ___ . _ - _ _
CTt.L .L O,w I
.- .7. r a e p tLs N C UNITED STATES
/ NUCLEAR REGULATORY COMMISSION g WASetiteGTON. D. C. 38888
....*' DEC 0 41985 ,
i MEMORANDUM FOR: Chaiman Palladino Comissioner Roberts i
Commissioner Asselstine Comissioner Bernthal Connissioner Zech FROM: William J. Dircks Executive Director for Operations
SUBJECT:
PLAN FOR CONDUCTING PAT AND SALP INSPECTIONS FOR TMI-1 BACKGROUND
~
The Comission in its Memorandum and Order CLI-85-09 lifted the immediate
' effectiveness of the 1979 Shutdown Orders on TMI-1. On page 54 of that Memorandum and Order, the Connission stated:
"The Comission is also directin Performance Appraisal Team (PAT)g the staff inspections andtoSystematic prepare combined Appraisal of licensee Performance (SALP) inspections at the end of six months of operation and again at the twelve-month mark.
These reports will address areas such as plant operations, main-
_. tenance, ifcensed and non-licensed operator training, quality
, assurance, radiological controls, fire protection, emergency i
preparedness, security and safeguards and design, engineering,
'"
- and plant modifications. The combined PAT /SALP reports are to
! ' be provided to the Comission and the public."
The purpose of this memorandum is to provide the Comission with the staff's plans for responding to this directive.
DISCUSSION The licensee was authorized to restart THI-1 on October 2, 1985, restarted the reactor on October 3 and has now proceeded with its power escalation program to the 75% power plateau. Therefore, to meet the Comission's directive, the closing dates for the next two SALP periods have been set at March 31, 1986, and September 30, 1986, respectively. In this regard, please note that the last regular SALP for TMI-1 covered the period February 1984 through January 1985.
Independent from the Comission's directive, Region I will conduct an interim appraisal at the conclusion of the Itcensee's restart program. This appraisal y
ne h- ~
h~b~dhk i I) L
~ n ..
// #w
is terined interim since it will address only the three-month period of restart operations. Further, it will not address certain functional areas such as -
licensing activities, security / safeguards and emergency preparedness, but will address the other norinal SALP functional areas for an operating plant. The purpose of this effort is twofold. First, it will provide o basis for making a determination concerning the level of future inspection coverage for TMI-1.
Secondly, it will help in formulating an inspection plan for the PAT inspections.
Subsequent to the interim appraisal, the first PAT inspection directed by the Commission will be conducted. The PAT inspection results will serve as one of the inputs to the six month SALP evaluation. Enclosure 1 illustrates the elationship in time for these inspections to the licensee's overall program for restart. This PAT inspection will be conducted by IE with participation by regional and contractor personnel. Areas to be addressed will be finalized after reviewing the results of the interim appraisal at the conclusion of the licensee's power escalation program; however, a preliminary plan is provided in Enclosure 2.
~
The six month SALP, directed by the Comission, will be conducted and the SALP Board will include representation from IE and NRR. The functional areas
. addressed by the Board will be the same as those for an operating plant and t will address the areas specified in the Commission's Memorandum and Order.
l Subsequently, a public meeting will be held with the licensee. Following t receipt and evaluation of any comments by the licensee, the final SALP package l
will be issued.
The specific scope of the second PAT inspection will be determined after the completion of the six-month SALP evaluation. It is anticipated that the second PAT inspection also will be conducted by IE and staffed by regional and con-tractor personnel.
The twelve month SALP, directed by the Comission, also will include represen-tation by IE and NRR. The procedures used will be essentially the same as for
... the~six-month SALP.
The SALP reports, licensee coments, and PAT reports will be provided, as they are issued, to the Comission and the public.
(Signes William J.Dirckr William J. Dircks Executive Director for Operations
Enclosures:
As Stated cc:
SECY OGC OPE
. ~
The Commissioners 3 Distribution EDO R/F
- WDircks JRoe TRehm VStello H0enton, NRR JTaylor, II -
GCunningham, ELD TMurley, RI WKane, RI JPartlow, IE l
l-c W
., n +gRS:RI eR$:RI SEbneter gTMartin Dh I e'[
RS6 rostockt urt D
an 11dk85 ' 11 & 85 11 M 85 12h85 11# 785 118/85 f
+2DIR:!E DEDROGR EDO f ygg VStello W0ircks 4 11 12/ /85 11/)/85
' D 011mer y85
!- _ _- - __"- ----_ --- . i" 1 -- ---- II?f- ?E-- - - - - - - - - - ~ - ~
d
., 4 '
I1.3 i iI :
$. ~ 1 1 a' 2 :.______:
I l .
I} .
5 .
{
N 1
l .
~
I 8-.n i i g
}!
g t
, , 1 n
- ) -
E *~
.. _ _ _ g_}g i
=
f Ii j' f j]5 ' g '
- gl. il :I :
},
_. },
g
- W g3 n
1 s ,33 g I g.
j I1.g .
a 2 - m 13 6:
[i E 3 Ii
- s. _ _ _ _
g ._j_4_.,
yJ a
__).
- i I
. i lI
=l a
12 m t
ENCLOSURE 2 INSPECTION 60ALS ;
TMI-1 RESTART PLUS 12 MONTHS GENERAL GOALS .
The basic objectives of the performance appraisal team (PAT) inspections for TMI-1 will be as noted in IE Manual Chapter 2900, paragraph 2900-01.01.a.
The approach for the first PAT inspection will concentrate on the implementa-tion of ifcensee programs as tney apply to the functional readiness for selected safety systems. The effectiveness of licensee implementation of management control systems will be evaluated in the following areas:
-- facility operations ogier,5 gg maintenance MAfenrJ /Vw/t.MM Su t.v t u d
. 7 -- training 5 e 09 su iW
~ ~
-- surveillance / inservice inspection and testing avlop a
. /
-- design changes and modifications 91 C'7!'d I ,
-- quality assurance b . ire.) T cr>. TGs tc~ ~
Other special inspectfo;ns scheM"d'io support the six month and/or twelve month SALP.will evaluate the effectiveness of licensee implementation of management control systems in the following functional areas.
-- radiation protection .
-- fire prevention /pr'otection l
-- emergency preparedness
-- security / safeguards SPECIFIC GOALS The specific scope of the second PAT inspection will be determined after the completion of the six-month SALP evaluation. It is expected that the two PAT inspections will cover a significant portion of the routine inspection program for the following functional areas:
.? , . .
l l
2 Enclosure 2 :
^ '
- 1. Facility Operations .
. l
- . ~.
35601 - 10 CFR Part 21 Inspection :
36700 - Organization and Administration 39701 - Records Program 39702 - Document Control Program .
40703 - Offsite Support Staff 42700 - Procedures 90714 - Non-routine Reporting Program
- 2. Training 41400 - Non-Licensed Staff Training 41701 - Licensed Operator Training
- 3. Maintenance i- 62700 , Maintenance - Routine
~~-
62702 a; Maintenance Program 62701 - Maintenance - Refueling 62704 - Instrument Maintenance 62705 - Electrical Maintenance
- 4. Surveillance / Inservice Inspection and Testing 37703 - Tests and Experiments Program
- S6700 - Calibration 61700 - Surveillance 61701 - Complex Surveillance
' ~
61724 - Test and Measurement Equipment Program
, 61725 - Surveillance Testing and Calibration Program ,
73051 - Inservice Inspection - Review of Program 73052 - Inservice Inspection - Review of Procedures
- 5. Design Changes and Modifications 37700 - Design Changes and Mndifications 37702 - Design Changes and Modification Program
~
- l. ,
1 3 Enclosure 2
- 6. Quality Assurance . .
35701 - QA Program - Annual Review 35751 - QA/QC Administration Program 38701 - Procurement Control Program 38702 - Receipt. Storage and Handling of Equipment Program ,
40700 - Onsite Review Comittee 40701 - Offsite Review Connittee 40702 - Audit Program 40704 - Implementation - Audit Program For the functional areas covered by team inspections separate from the PAT inspections, the inspectors should cover a significant portion of the routine inspection program for the inspection procedures identified below:
- 1. Radiation Protection 79501 - LWR Water Chemistry Control and Chemical Analysis
. 79502 -Plant Systems Affecting Plant Water Chemistry
- ~~ ' 83500 Series 83700 Series 84500 Series 84700 Series 84850 - Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR 20 and 10 CFR 61 86721 - Transportation 86740 - Transportation Activities 80721 - Radiological Environmental Monitoring (Biennial) -
- ~ 80521 - Radiological Environmental Monitoring
- 2. Fire Prevention / Protection -
64703 - Fire Prevention / Protection Program 64704 - Fire Prevention / Protection Program Implementation
- 3. Emergency Preparedness 82200 Series l
82301 - Observation / Evaluation of Exercises for Power Reactor
- 4. Security / Safeguards 81000 Series 85102 - Materials Control and Accounting l
I l
. - _ _ , . - --__ . _ - . . - . . . - - - . - - - - . . - . - - - . - - _ - - _ -