Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205D819 + (ML20205D819)
- JPN-99-008, Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl + (ML20205D820)
- ML20205D825 + (ML20205D825)
- ML20205D827 + (ML20205D827)
- ML20205D831 + (ML20205D831)
- IA-84-559, Responds to Appeal Re Denial of FOIA Request for Documents Re Philippine Nuclear Power Plant.Appeal Denied.Documents Withheld (Ref FOIA Exemption 4) + (ML20205D833)
- ML20205D833 + (ML20205D833)
- ML20205D834 + (ML20205D834)
- ML20205D835 + (ML20205D835)
- ML20205D839 + (ML20205D839)
- ML20205D842 + (ML20205D842)
- ML20205D843 + (ML20205D843)
- ML20205D845 + (ML20205D845)
- ML20205D847 + (ML20205D847)
- IR 05000275/1987009 + (ML20205D848)
- ML20205D850 + (ML20205D850)
- ML20205D851 + (ML20205D851)
- ML20205D853 + (ML20205D853)
- IA-85-614, Forwards Applicant Motion for Reconsideration of ASLB 841218 Order Re Matl False Statements on Torquing of U-bolts.W/o Encl + (ML20205D857)
- ML20205D857 + (ML20205D857)
- ML20205D860 + (ML20205D860)
- ML20205D864 + (ML20205D864)
- ML20205D865 + (ML20205D865)
- ML20205D868 + (ML20205D868)
- ML20205D870 + (ML20205D870)
- ML20205D874 + (ML20205D874)
- 05000440/LER-1986-035, :on 860714,RWCU Sys Automatically Isolated While Discharging Water to Main Condenser During Normal Operation.Caused by Technician Inadvertently Skipping Surveillance Instruction Step + (ML20205D876)
- ML20205D880 + (ML20205D880)
- RBG-29067, Updates 871218 Response to Insp Rept 50-458/87-27.QA Surveillance OS-87-12-51 Performed to Satisfy Commitment to Ensure That Appropriate Procedures Identifed & Controlled for Approval,In Accordance W/Tech Specs 6.5.2.1 & 6.8.1 + (ML20205D883)
- ML20205D886 + (ML20205D886)
- B12428, Forwards Vols 1 & 2 to Updated FSAR for Haddam Neck Plant to Fulfill 870331 Milestone,Per Oct 1985 Commitment.Balance of FSAR Chapters Will Be Submitted on or Before 870630 + (ML20205D887)
- ML20205D887 + (ML20205D887)
- ML20205D888 + (ML20205D888)
- ML20205D891 + (ML20205D891)
- ML20205D893 + (ML20205D893)
- ML20205D894 + (ML20205D894)
- ML20205D900 + (ML20205D900)
- ML20205D903 + (ML20205D903)
- ML20205D904 + (ML20205D904)
- ML20205D907 + (ML20205D907)
- ML20205D910 + (ML20205D910)
- ML20205D911 + (ML20205D911)
- ML20205D913 + (ML20205D913)
- ML20205D920 + (ML20205D920)
- ML20205D921 + (ML20205D921)
- ML20205D922 + (ML20205D922)
- ML20205D925 + (ML20205D925)
- ML20205D926 + (ML20205D926)
- ML20205D927 + (ML20205D927)
- ML20205D930 + (ML20205D930)
- NUREG-1050, Forwards Regulatory Analysis of Generic Safety Issue 61, Safety/Relief Valve Discharge Line Break within Mark I or II Wetwell Airspace. Based on Results Discussed in NUREG/CR-4594,risk Lower than Previously Estimated + (ML20205D931)