Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204F285 + (ML20204F285)
- 1CAN108806, Monthly Operating Rept for Sept 1988 for Arkansas Nuclear One Unit 1 + (ML20204F286)
- ML20204F288 + (ML20204F288)
- PY-CEI-NRR-0511, Suppls 860618 & 0718 Ltrs by Providing Addl Change to Tech Specs Re Reactor Protection Sys Electric Power Monitoring. Justification & Proposed Tech Specs Encl.Amend Not Requested Since Change Does Not Affect Operability + (ML20204F289)
- ML20204F292 + (ML20204F292)
- U-600544, Responds to Unresolved Item Noted in Insp Rept 50-461/85-65. Corrective Actions:Procedure 1003.01 Revised & Training Program for Independent Technical Reviewers Instituted. Procedure Revs Will Be Completed by 860515 + (ML20204F293)
- ML20204F295 + (ML20204F295)
- ML20204F297 + (ML20204F297)
- ML20204F298 + (ML20204F298)
- ML20204F300 + (ML20204F300)
- ML20204F302 + (ML20204F302)
- ML20204F303 + (ML20204F303)
- ML20204F304 + (ML20204F304)
- ML20204F305 + (ML20204F305)
- ML20204F306 + (ML20204F306)
- ML20204F307 + (ML20204F307)
- ML20204F310 + (ML20204F310)
- ML20204F312 + (ML20204F312)
- IR 05000247/1987004 + (ML20204F315)
- ML20204F317 + (ML20204F317)
- U-600625, Responds to NRC Re Violations Noted in Insp Rept 50-461/86-23.Corrective Actions:Computer Point 1AP-BC504 & Associated Annunciator Retested,Maint Work Orders Investigated & Procedure 1029.01 Revised + (ML20204F320)
- ML20204F322 + (ML20204F322)
- ML20204F324 + (ML20204F324)
- ML20204F325 + (ML20204F325)
- ML20204F328 + (ML20204F328)
- IR 05000721/2008028 + (ML20204F330)
- ML20204F331 + (ML20204F331)
- IR 05000213/1988015 + (ML20204F333)
- IR 05000348/1987004 + (ML20204F335)
- ML20204F336 + (ML20204F336)
- ML20204F337 + (ML20204F337)
- B10755, Forwards Public Version of Rev 13 to Emergency Plan Implementing Procedures EPIP 1.5-2, Notification & Communication & EPIP 1.5-41 Re Core Damage Estimate.W/O Procedure 1.5-41 + (ML20204F338)
- ML20204F341 + (ML20204F341)
- ML20204F346 + (ML20204F346)
- ML20204F347 + (ML20204F347)
- ML20204F350 + (ML20204F350)
- ML20204F351 + (ML20204F351)
- ML20204F355 + (ML20204F355)
- IR 05000443/1986038 + (ML20204F359)
- ML20204F360 + (ML20204F360)
- ML20204F361 + (ML20204F361)
- ML20204F362 + (ML20204F362)
- ML20204F366 + (ML20204F366)
- ML20204F367 + (ML20204F367)
- ML20204F369 + (ML20204F369)
- HBL-87-015, Forwards Proposed Rev 2 to Safstor Tech Specs.Rev Includes Changes to Chemistry Limits on Spent Fuel Storage Pool & Requirements for Surveillance Program for Boral Matl of Spent Fuel Assembly Containers + (ML20204F373)
- IR 05000346/1985040 + (ML20204F374)
- 05000316/LER-1983-036, Forwards LER 83-036/01T-0 + (ML20204F375)
- SVP-99-055, Responds to NRC Re Violations Noted in Insp Repts 50-254/98-23 & 50-265/98-23.Corrective Actions:Work Was Stopped & Operations Was Notified of Event.Oos Was Hung, Checked,Accepted & Work Was Successfully Completed + (ML20204F376)
- PNO-III-87-041, on 870319,turbine Tripped & Caused Reactor Scram.Caused by Fault in 6.9-kV & 4,160-volt Lines from Auxiliary Transformer to in-house Busses.Fault Also Caused Arcing & Burning of Busses.Fire Extinquished + (ML20204F377)
- ML20204F381 + (ML20204F381)