Amend 16 to License DPR-22,changing Tech Specs to Reflect Changes in Util Organizational Structure
ML20204F288
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/18/1983
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Northern States Power Co
Shared Package
ML20204F291 List:
References
DPR-22-A-016 NUDOCS 8304290243
Download: ML20204F288 (9)


Text

%

  1. ps5 Rec y

'c UNITED STATES

- E'

  1. ,)

NUCLEAR REGULATORY COMMISSION

,,.(

WASHINGTON, D. C. 20555 O

.....f NORTHERN STATES POWER COMPANY DOCKET NO. 50-263 MONTICELLO NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.16

' License No. DPR-22

1. 'The Nuclear Regulatory Comission (the Commission) has found that:

A.

The application for amendment by Northern States Power Company (the licensee) dated September 24, 1982 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and-the Commission's rules and regulations set forth in 10 CFR Chapter I; j

l B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; i

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public and (ii) that such activities will be conducted in compl'iance with the Comission's regulations _;

D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

4 2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Facility Operating License No. DPR-22 is hereby' amended to read as follows:

2.

Technical Specifications l

The. Technical Specifications contained in Appendix A as revised through Amendment No.16 are hereby incorporated.in the license.

l The licensee shall operate the facility in accordance with the Technical Specifications.

l l

8304290243 830418 l

PDR ADDCK 05000263 l

P PDR u

2 1

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COM ISSION

,:/

Danonic B. Vassallo Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: April 18,1983

, e t'

1

l ATTACHMENT TO LICENSE AMENDMENT NO.16 FACILITY OPERATING LICENSE NO. DPR-22 DOCKET NO. 50-263 1

Remove the following pages and insert identically numbered pages:

i i

233 234 4

235 237 239 240 I

j i

n 1

I d

l I

f I

l i

i l

4

^'

s E.

A training pro 8 ram for individuals serving in the Ure brigade shall be maintained under the direction of a designated member of Northern States Power management. 'lhis program shall meet l

the requirements of Section 27 of the NFPA Code - 1976 with the exception of training scheduling.

Fire brigade training shall be scheduled as set forth in the plant training program.

i i

1 i

1 6.1 233 Amendment flo.16

PRE 5fNT l

SENIOR vlCE PPES10ENT POWER SUPPLV I

I I

I vlCE PhESIDENT DIRECTOR DIRECTOR DW4ACER OIRECTOR PLAT 4I ENGittEERING GUAll1Y SYSTEM PROD fu[L NUCLEAR H

AND (ONSIRUCil0N ASSURANCE OP & HAlHIENANCE SUPPLV MNERAll0N e n

I I

GEMRAL HANAGER E

IEU i

tsJCLEAR PLA#41$

lalCLEAR EADLP I

I I

PLANT MANAGER ENERAL SUPI EMRAL $UP1 tweAGER HAs4 AGERS PRODuCil0N MuCLEAR-1ECHNICAL NUCLEAR SUPPORT eRAiRic istAne iRAin NO Analysis services uRviCEs

& N0H1EEttos

}

I I

y on.s Ig 0+ SITE 1ECte41 CAL I

gnc g

SERvlCES GRotPS 1RAltdNG I

i l

l i

I l

1 i

1 l

a REvlEW OF SAFTV AUDIT

[

gAten, g m g _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _._

c

,,,,,,,c, 4

o HAs 1st MSPONSIBILIIT FOR letE i

EiM Pau ECn0N PRcuaH FIGURE 6.1.1 NSP CORPORATION ORGANIZATION 1

flELATIONSHIP TO ON-SITE OPERATIllG ORCid4IZA110N 6.1 234 Amendment No. ) 16 i

. _ _....~.. - __ _ _. _. _ _..... _. _ _ _ _- _.... _._ _. _ _

.... ~...._ m _ _ _.. _... _. _ _.... -...

t PLANT f

CPERAll0NS MANAGER 5 CoptilTIEE I

I I

l PLANT SUPERINTENDENT SUPT.

Stri.

PLANT PLANT SUPERINTD0EHi OPERAll0NS &

SEQ BfiY &

OLMLITY OFFICE ENGifEERING &

ItAINTEPANCE 9 SERvlCES 9 ENGilEERING W NANAGER4 P/4 Ball 0N PROICCil0N 9 ESCO I

lSLPPORT FOR 04 l 4

m u

l l

lMO IE FUNCillD4l SUPT.OF SUPT.OF

^

  • g g

I SRPT.

$177.

SLPT.

g RADIAil0N It.ClellCal.

IPEllAll0NS u

PROTECil0Di9 ENGMERING $

ENGlBEERING $

SIIE SLFT.

L500 m

MCHANICAL SHIFT $4PER-TEDeelCal.

ENGMERS TEDedCAS.

vlS04 ESos SUPPORT &

50R MJCLEAR StPPORT FOR ELECTRICAL RADIAll0N ENGINEERING.

IPERAilork g

MAINTENMCE Pfl0TECil0N INSTRL41 ENTAIL 0N, MAINTENANCE.

OROLP LEAD PLANT EQUIP-SPECIALISTS CONR40LS.

SSAVEILLANCE.

MMT & REAC10R CopMff%

& 1ESilNG OPERATOR E00 INSIRUDfNil &

l COHIROLS SPEC PLANT EQUIPMNT

& REACTOR CPERA10RtStE09' ASSISTANT PLANT CODES 5 KEY kPERVISOR EOLAPMNT LO LICENSED GPERAilft CPERAlf1RISI LSO LICENSE 0 SENIOR OPEM10R ne PLANT ATTEfGANi$

F8RE BRIGADE i

IAS RE0ulREOs FIGURE 8.l.2

'HONilCELLO NUCLEAR GENERAllNG PLANT FUNCTIONAL ORGAN 12All0N FOR ON-SITE OPERATING GROUP 235 i

6.1 l.

Amendment No.-) 16 i

i

-~

6 6.2 Review and Audit b

Organizational units for the review and audit of facility operations shall be constituted and have the responsibilities and authorities outlined below:

A.

Safety Audit Committee (SAC)

The Safety Audit Committee provides the independent review of plant operations from a nuclear safety standpoint. Audits of plant operation are enducted under the cogiaance of the SAC.

1.

Membership a.

The SAC shall consist of at least five (5) persons.

b.

The SAC Chairman shall he an NSP representative, not having line responsibility for operation of the the plant, appointed by the Director, Nuclear Generation. Other members shall be appointed by the Director, Nuclear Generation or by such other person as he may designate. The Chairman shall appoint a Vice Chairman from the SAC membership to act in his absence.

c.

No more than two members of the SAC shall be from groups holding line responsibility for operation of the plant.

d.

A SAC member may appoint an alternate t,o serve in his absence, with concurrence of the Omairman.

No more than one alternate shall serve on the SAC at any one time.

The alternate member shall have voting rights.

2.

Qualifications The SAC members should collectively have the capability required to review activities a.

in the folloviog areas: nuclear porer plant operations, nuclear engineering, chemistry ar.d radiochemistry, metallurgy, instrumentation and control, radiological safety, mechanical and electrical engineering, quality assurance practices, and other appropriate fields associated with the unique characteristics of the nuclear power plant.

6.2 237 Amendment No. j( 16 I

{-

e I.

Invent 1gation of mit events which are required by regulation or Lecluitcal apccifications to be reported to

.liu In writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

g.

Revistons to the Facility Entergency Plan, the Facility Security Plan, and the Fire Protection Program.

l h.

Operations Committee minutes to determine if matters considered by that Committee involve unreviewed or unresolved safety questions.

1.

Other nuclear safety matters referred to the SAC by the Operations Committee, plant management or company management.

j.

All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety-rela ted s truc tures, systems, or components.

k.

Reports of special inspections and audits conducted in accordance with specification 6.3.

1.

Changes 'to the Offsite Dose Calculation Manual (ODCH).

I Review of investigative reports of unplanned releases of radioactive material to the environs.

m.

- The operation of the nuclear power plant sh'all be audited formally under the cognizance of the SAC to 6.

Audit ausure safe facility operation.

Audits of selected aspects of plant operation, as delinea'ted in Paragraph 4.4 of ANS1 Hl8.7-1972, shall be perforened with a frequency commensurate with their nuclear safety significance and in a manner to nseure that an audit of all nuclear safety-related activities is completed within a period of two years. The audits shall be performed in accordance with appropriate written instructions and procedures.

h.

Audits of aspects of plant radioactive effluent treatnEnt, and radiological environmental monitoring shall be performed as follows:

1.

Implementation of the Of fsite Dose Calculation Hanual and quality controls for effluent monitoring at leant once every two years.

2.

Implementation of the Proces,s Control Program for solidification of radioactive waste at least unce every suo yours.

l.

Tho Radiological Environmental lionitoring Prpgram and the results thoroof including quality controls, at Inast once uvary year.

c.

Periodic review of the audit program should be perforined by the SAC at least twice a year to assure its ade.piacy.

d.

Written reports of the audits shall be reviewed by the Director Nuclear Generation, by the SAC at a scheduled meeting, and by menbara of Hansgement having responsibility in the areas audited.

, 6. 2 219 2

Auendment No. 3 Jp 16

i 6

1 7.

Authority ne SAC shall be advisory to ties Director Nuclear Generation.

l S.

Records Hinuties shall be prepared and retained for all scheduled meetings of the Safety Audit The minutes shall be distributed within one month of the meeting to the l

Cosmtittee.

Director Nuclear Generation, the General Manager Nuclear Plants, each member of the l

There shall be a formal SAC, and others designated by the Chairman or Vice Chairman.

approval of the minutes.

9.

ProceJures A written clierter for the SAC shall be prepared that containst s'.

Subject s within the purview of the group.

b.

Responelbility and authority of the group.

Hechanismo for convening meetings.

c.

d.

Frowletone af use of specialists or subgroups.

Authority to obtain access to the nuclear power plant operating record flies e.

and operating personnel ideen assigned audit faenctions.

Beg'uirements for distributlon of reporte and mient'es prepared by the group to f.

i ethers in the NSF Grganisation.

4 i

6.2 240 Amendment No. ; 16

~

.