ML20204F292

From kanterella
Jump to navigation Jump to search
Forwards Partially Withheld Insp Repts 50-348/87-04 & 50-364/87-04 on 870209-12 (Ref 10CFR2.790 & 73.21).No Violation or Deviation Noted
ML20204F292
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/19/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20204F296 List:
References
NUDOCS 8703260168
Download: ML20204F292 (2)


See also: IR 05000348/1987004

Text

_ _ _ _ - - _ _ - - - . _ - - . - - - - - - - - - - -

,,

,,

.

.

MAR 191987

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

i Birmingham, AL 35291-0400

Oantlemen:

SUBJECf: Nf.C INSPFCTION REf0RT NOS. 50-348/87-04 AND 50-364/87-04

This refers to the Nuclear negulatory Commission (NRC) inspection conducted

by G. F. Gibson on February 9-12, 1987. The inspection included a review of

activities authorized for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

With'in the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure

to this letter, with the exception to the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure: (See page 2)

,

8703260168 870319 8

PDR ADOCK 0000

G

SAFEGUARDS INFORMATION

[EOS,

v

.

'

SAFEGUARDS INFORMATION

Alabama Power Company 2 MAR j g jgg7

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/ encl:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ encl:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of Alabama

(

sjf /, gh

GFGikson:er bh cGuire Cline HCDance

j 03/lD/87 ktd3/j /87 03/;q/87

'

V

03//[/87 i JCLOS Or.I' CONTAINg

f

I

j SAFEGUARDS INFORMATION g'?IMI'K,D3

p gr.af;gon

9

4