ML20204F304
| ML20204F304 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 10/12/1988 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20204F309 | List: |
| References | |
| NUDOCS 8810210552 | |
| Download: ML20204F304 (2) | |
See also: IR 05000213/1988015
Text
4
y'.
.
,.
o
.
.
,
,
.
'
'
OCT ! ! 10m
Docket / License:
50-213/0PR-61
Connecticut Yankee Atomic Power Company
ATTN: Mr. E. J. Hroczka
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 2.'0
Hartford, Connecticut 06141-0270
Gentlemen:
Subject: Resident Inspection 50-213/88-15 (August 1 - September 27,1988)
This transmits the findings of tre routine NRC inspection of the Haddam Neck Plant
by Mr. J. T. Shediosky and Ms. A. A. Asars.
These findings have been discussed
with Mr. D. B. Miller of your staf f.
No violations vere identified and no reply to this letter is required.
Operational conservatism was noted in the actions tsken by your staff in re ponse
to the failure of a charging pcmp and also in anticipation of elevated service
water temperatures.
In addittun, your engineering analysis concerning improvements
,
in the plant fire protection systems resulted in the discovery of a previously un-
Identified limiting location for a 10 CFR Part 50, Appendix R fire.
These three
issues are discussed within the enclosed inspection report.
In reference to the effects of the new fire scenario at the inside of containment
electrical penetration area, we uiderstand that the cable separation problem iden-
tified with the No. 2 Containment Air Recirculation Fan will be corrected during
the next refueling outage.
Pleata notify us if you do not consider this a commit-
ment on your part.
Thank you for your August 30, 1991 reply describing corrective actions for the
vital area barrier degrr.dations iitentified in NRC ' Spection Report 50-213/88-12.
These actions were reviewed during this inspection .snd found to be adequate.
You. cooperation with us is appreciated.
Sincerely.
ONCINAL $1GNED BY
EEE H. BETTENHAUSEN
Lee H. Bettenhausen, Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosure: NRC Region I Report 50-213/83-15
0FFICIAL RECORD COPY
OL50-213/88-15 - 0001.0.0 I(
- ' **
pgAmA282R Si&8)jp
g/
O
_
_
- -.
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _
_
b
'
-
.
' " .
-
.
OCT 1i W
Conn.ecticut Yankee Atomic Power Company 2
,
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
D. B. Miller, Station Superintendent
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
.
Public Document Room (PDR)
!
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
i
NRC Resident Inspector
l
State of Connecticut
l
!
bec w/ enc 1:
!
Region I Docket Room (with concurrences)
l
Management Assistant, ORMA (w/o encl)
Section Chief DRP
i
'
W. Raymond, SRI. Millstone
A. Wang, LPM, NRR
l
R. Bores, DRSS
j
J. Craig, NRR
i
C. Anderson, DRS
S. Strosnider, DRS
P. Eselgroth DRS
r
r
I
t
h
(
t
i
l
i
!
-
- l
[
!
4
l
t
!
I,
RI:DRP
R: Rp
i
RI:DRP@g W
@
>
l
,
i
Shediosky/meo
McCabe
Bettenhausen
t
10/s/88
als1
l#W$f
[
81
0FFICIAL RECORD COPY
DL50-213/88-15 - 0002.0.0
10/06/88
,
i
i
I
[
i
-
- -
-
- - -
-
-
-
- - - -
- -
.