Forwards Insp Rept 50-213/88-15 on 880801-0927.No Violations Noted.Operational Conservatism Noted in Actions Taken in Response to Failure of Charging Pump & in Anticipation of Elevated Svc Water Temps
ML20204F304
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/12/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20204F309 List:
References
NUDOCS 8810210552
Download: ML20204F304 (2)


See also: IR 05000213/1988015

Text

4

y'.

.

,.

o

.

.

,

,

.

'

'

OCT ! ! 10m

Docket / License:

50-213/0PR-61

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Hroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 2.'0

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Resident Inspection 50-213/88-15 (August 1 - September 27,1988)

This transmits the findings of tre routine NRC inspection of the Haddam Neck Plant

by Mr. J. T. Shediosky and Ms. A. A. Asars.

These findings have been discussed

with Mr. D. B. Miller of your staf f.

No violations vere identified and no reply to this letter is required.

Operational conservatism was noted in the actions tsken by your staff in re ponse

to the failure of a charging pcmp and also in anticipation of elevated service

water temperatures.

In addittun, your engineering analysis concerning improvements

,

in the plant fire protection systems resulted in the discovery of a previously un-

Identified limiting location for a 10 CFR Part 50, Appendix R fire.

These three

issues are discussed within the enclosed inspection report.

In reference to the effects of the new fire scenario at the inside of containment

electrical penetration area, we uiderstand that the cable separation problem iden-

tified with the No. 2 Containment Air Recirculation Fan will be corrected during

the next refueling outage.

Pleata notify us if you do not consider this a commit-

ment on your part.

Thank you for your August 30, 1991 reply describing corrective actions for the

vital area barrier degrr.dations iitentified in NRC ' Spection Report 50-213/88-12.

These actions were reviewed during this inspection .snd found to be adequate.

You. cooperation with us is appreciated.

Sincerely.

ONCINAL $1GNED BY

EEE H. BETTENHAUSEN

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of Reactor Projects

Enclosure: NRC Region I Report 50-213/83-15

0FFICIAL RECORD COPY

OL50-213/88-15 - 0001.0.0 I(

  • ' **

pgAmA282R Si&8)jp

g/

O

_

_

- -.

_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _

_

b

'

-

.

' " .

-

.

OCT 1i W

Conn.ecticut Yankee Atomic Power Company 2

,

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

D. B. Miller, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

.

Public Document Room (PDR)

!

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

i

NRC Resident Inspector

l

State of Connecticut

l

!

bec w/ enc 1:

!

Region I Docket Room (with concurrences)

l

Management Assistant, ORMA (w/o encl)

Section Chief DRP

i

'

W. Raymond, SRI. Millstone

A. Wang, LPM, NRR

l

R. Bores, DRSS

j

J. Craig, NRR

i

C. Anderson, DRS

S. Strosnider, DRS

P. Eselgroth DRS

r

r

I

t

h

(

t

i

l

i

!

-

l

[

!

4

l

t

!

I,

RI:DRP

R: Rp

i

RI:DRP@g W

@

>

l

,

i

Shediosky/meo

McCabe

Bettenhausen

t

10/s/88

als1

l#W$f

[

81

0FFICIAL RECORD COPY

DL50-213/88-15 - 0002.0.0

10/06/88

,

i

i

I

[

i

-

- -

-

- - -

-

-

-

- - - -

- -

.