Monthly Operating Rept for Feb 1987
ML20204F350
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/28/1987
From: Florian R
GEORGIA POWER CO.
To:
Shared Package
ML20204F283 List:
References
NUDOCS 8703260177
Download: ML20204F350 (4)


Text

,

W ENCLOSURE OPERATING DATA REPORT DOCKET NO. 50-424 UNIT Voatle 1 .

DATE 03/01/87 COMPLETED BY R. J. Florian -

(404) 554-9961 TELEPHONE ext. 4148 OPERATING STATUS

1. REPORTING PERIOD: Feb., 1987 GROSS HOURS IN REPORTIP8G PERIOD: 672
2. CURRENTLY AUTHORIZED POWER LEVEL (Wt): 170 m

MAX. DEPND. CAPACITY OGie-Net): n/a

.. DESIGN ELECTRICAL RATING (IGie-Net): ifoi

3. POWER LEVEL TO 1AIICH RESTRICTED (IF ANY) OGie-Met): 5:
4. N atMt FOR RESTRICTION (IF ANY): condition of initial low-power license NPF-61. .

THIS MONTH YR TO DATE CUMULATIVE

5. INatBER OF HOURS REACTOR WAS CRITICAL 0 0 0 -
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE O O O
8. UNIT RESERVE SHUTDOWN HOURS 0 o o
9. GROSS THERMAL ENERGY GENERATED (MWH) 0 o n
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) o n n
11. NET ELECTRICAL ENERGY CENERATED (MWH) o n n k

_ w_ " $$8 2gg!! $8 R

24

~

l OPERATING DATA REPORT (continued)

I l' THIS MONTH YR TO DATE CUMULATIVE

12. REACTOR SERVIG FACTOR o o o
13. REACTOR AVAIIABILITY FACTOR o o o

! 14. WIT SERVI m FACTtR o o o l 15. UNIT AVAIIABILITY FACTOR n n n j UNIT CAPACITY FACTOR (Using MDC) o o o 16.

UNIT CAPACITY FACTOR (Using Design We) o o o l 17.

o o o l

18. UNIT FORCED OUTAGE RATE

[ 19. SHUTDOINIS SCHEDULE OVER M XT 6 MONTH

! (TYPE, DATE, A M DtRATION OF EACH): N/A

}

l 1 20. IF SNUTDOINI AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i

l 21. IRIITS IN TEST STATUS (PRIDE TO C000ERCIAL OPERATION):

I FORECAST ACHIEVED I

INITIAL CRITICALITY 03/05/87 INITIAL ELECTR1 CITY n3/1s/87 f

CODGERCIAL OPERATION 06/01/87 i

en 1 Xy i M

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-424 REPORT MONTH Feb., 1987 UNIT NAME Vogtle 1 q

DATE 03/01/87 COMPLETED BY R.J.Florian TELEPHONE (404)554-9961, t ext.4148 Met M of Licensee Bysteg C-- ---

cause & Corr.

No. Date Type 1 Duraties a.maan 2 Shutting Event Code Code' t Action to l (Bours) Doun Report (If Prevent t ReactorQ Applicable) Recurrence i'

a w N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 3

I

I Z 3 4
' F
Forced Beseen: Method: IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance of Test 2-Manual Scram 5 C-Befueling 3-Automatic Scram IEEE 803A-1983 D-Begulatory Restriction 4-Continuations E-Operator Training & Lic. Exam. 5-Imad Reduction Attachment yes no 1 i F-Administrative 9-Other (Explain) Number of pages _None C-Operational Error (Explain)

N-Other (Explain) x3  :

, .t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-424 UNIT NO. Voatle i DATE 03/01/87 COMPLETED BY a__, p , ne i .,n (404) 554-9901 TELEPHONE ext. 4148 MONTH February 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 o 2 a 18 o n 19 n 3

4 n 20 n 5 o 21 o 6 o 22 o n 23 n 7

0 24 0 8

0 25 0 9

0 26 0 10 o 27 0 11 o 28 a 12 13 n 29 FUA N/A 14 0 30 0 31 N/A 15 16 0 3

gg7 I E-4