Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204D047 + (ML20204D047)
- ML20204D053 + (ML20204D053)
- ML20204D057 + (ML20204D057)
- ML20204D061 + (ML20204D061)
- ML20204D067 + (ML20204D067)
- 05000327/LER-1987-014, :on 870217,boron Injection Tank Heaters Found Not Verified Operable Every 31 Days.Caused by Procedural inadequacy.SI-16 Revised + (ML20204D069)
- ML20204D070 + (ML20204D070)
- ML20204D074 + (ML20204D074)
- ML20204D076 + (ML20204D076)
- ML20204D081 + (ML20204D081)
- 05000352/LER-1999-001-02, :on 990217,old Rev of LGS PSP Was Discovered on Hard Drive of self-contained Computer in Security Ofc Area. Caused by Less than Adequate Ac.Security Force Was Placed on Heightened Awareness to Compensate for Compromise of SG + (ML20204D082)
- ML20204D084 + (ML20204D084)
- ML20204D087 + (ML20204D087)
- ML20204D090 + (ML20204D090)
- ML20204D095 + (ML20204D095)
- L-87-132, Recorded Annual Whole Body Exposure for CY86 + (ML20204D117)
- ML20204D120 + (ML20204D120)
- 05000271/LER-1998-026, :on 981124,inadequate Equipment Control Resulted in Reduced HPCI Sys Reliability.Caused by Valve Being Out of Position.Completed Pressure Switch Calibration. with + (ML20204D128)
- ML20204D129 + (ML20204D129)
- ML20204D134 + (ML20204D134)
- NOC-AE-000396, Supplemental Application for Amends to Licenses NPF-76 & NPF-80,relocating TS 3/4.7.9 for Snubbers to TRM + (ML20204D135)
- ML20204D136 + (ML20204D136)
- ML20204D147 + (ML20204D147)
- ML20204D158 + (ML20204D158)
- ML20204D160 + (ML20204D160)
- ML20204D162 + (ML20204D162)
- HL-5757, Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 990127 + (ML20204D170)
- ML20204D171 + (ML20204D171)
- 05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With + (ML20204D180)
- ML20204D183 + (ML20204D183)
- 05000483/LER-1998-001-01, Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability + (ML20204D188)
- ML20204D189 + (ML20204D189)
- ML20204D190 + (ML20204D190)
- ML20204D191 + (ML20204D191)
- ML20204D197 + (ML20204D197)
- ML20204D198 + (ML20204D198)
- IR 05000352/1978007 + (ML20204D204)
- ML20204D209 + (ML20204D209)
- ML20204D213 + (ML20204D213)
- ML20204D219 + (ML20204D219)
- ML20204D220 + (ML20204D220)
- ML20204D224 + (ML20204D224)
- ML20204D226 + (ML20204D226)
- ML20204D227 + (ML20204D227)
- ML20204D231 + (ML20204D231)
- IR 05000364/1978016 + (ML20204D234)
- ML20204D238 + (ML20204D238)
- ML20204D244 + (ML20204D244)
- ML20204D247 + (ML20204D247)
- ML20204D249 + (ML20204D249)
- ML20204D251 + (ML20204D251)