Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-98-0045, Forwards Annual Rept Summarizing Effect of Changes & Errors on Limiting ECCS Analysis in Evaluation Models.No Addl Changes or Errors Have Occurred Since 970310 + (ML20203L651)
- ML20203L652 + (ML20203L652)
- ML20203L653 + (ML20203L653)
- U-600691, Informs That FSAR Figure 17.2-2 Re QA Organizational Chart Not Updated in FSAR Amend 38.Figure Will Be Updated in Next FSAR Amend to Correspond to Encl Figure 1-3 of Operational QA Manual + (ML20203L654)
- ML20203L655 + (ML20203L655)
- ML20203L657 + (ML20203L657)
- ML20203L661 + (ML20203L661)
- ML20203L663 + (ML20203L663)
- IR 05000458/1986019 + (ML20203L666)
- ML20203L670 + (ML20203L670)
- IR 05000220/1986015 + (ML20203L672)
- ML20203L675 + (ML20203L675)
- 05000302/LER-1998-002, :on 980202,concluded That 500kV Backfeed Was Unqualified Source of off-site Power.Caused by Inadequate Design Control.Will Review Applicable Procedures, Instructions & Surveillance Procedures + (ML20203L676)
- ML20203L677 + (ML20203L677)
- RBG-24029, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-19.Corrective actions:up-to-date Equipment Qualification Info,Including Scew Sheets,Master List & Qualification Repts Being Updated Individually + (ML20203L678)
- ML20203L681 + (ML20203L681)
- ML20203L682 + (ML20203L682)
- ML20203L686 + (ML20203L686)
- ML20203L687 + (ML20203L687)
- ML20203L689 + (ML20203L689)
- ML20203L694 + (ML20203L694)
- ML20203L695 + (ML20203L695)
- ML20203L696 + (ML20203L696)
- ML20203L697 + (ML20203L697)
- ML20203L699 + (ML20203L699)
- ML20203L702 + (ML20203L702)
- ML20203L706 + (ML20203L706)
- ML20203L708 + (ML20203L708)
- ML20203L713 + (ML20203L713)
- ML20203L715 + (ML20203L715)
- AECM-86-0228, Forwards Proposed Rev to Inservice Insp Program Relief Request I-00007 Re ASME Section XI Code Requirement for Insp of Piping Welds Located within Guard Pipes,Per 860609 Discussion.Markup of Original Request Also Encl.Fee Paid + (ML20203L716)
- ML20203L719 + (ML20203L719)
- ML20203L721 + (ML20203L721)
- ML20203L723 + (ML20203L723)
- ML20203L724 + (ML20203L724)
- ML20203L726 + (ML20203L726)
- ML20203L727 + (ML20203L727)
- ML20203L729 + (ML20203L729)
- ML20203L731 + (ML20203L731)
- ML20203L732 + (ML20203L732)
- ML20203L733 + (ML20203L733)
- ML20203L735 + (ML20203L735)
- ML20203L736 + (ML20203L736)
- ML20203L737 + (ML20203L737)
- ML20203L739 + (ML20203L739)
- ML20203L741 + (ML20203L741)
- IR 05000344/1986026 + (ML20203L746)
- ML20203L750 + (ML20203L750)
- NPL-98-0155, Responds to NRC Re Violations Noted in Insp Repts 50-266/97-01 & 50-301/97-01 on 960428-971129.Corrective Actions:Developed & Disseminated to Entire Engineering Staff & Specifically to Design Bases & Sys Engineers + (ML20203L751)
- ML20203L754 + (ML20203L754)
- 05000395/LER-1986-014, :on 860727,reactor Trip Occurred.Caused by Spurious Operation of One of Two Other Control Valve Pressure Switches Coincident W/Test of Control Valve 4 Which Completed Two Out of Three Logic + (ML20203L755)