ML20203L702
| ML20203L702 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/22/1986 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20203L693 | List: |
| References | |
| 0681V, 681V, GN-1054, NUDOCS 8608290092 | |
| Download: ML20203L702 (1) | |
Text
r Georgia Power Company Post Offica Box 287 Waynesboro Georg'a 30830 Telephone 404 554-9961 404 724-8114 Southem Company Services,Inc PoM Office Box 2625 Birmingham, Mabama 35202 Tewone 205 8me "
Vogtle Project August 22, 1986 Director of Nuclear Reactor Regulation File: X4AK01 Attention:
Mr. B. J. Youngblood X4BA17 PWR Project Directorate #4 Log:
GN-1054 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 TDI DIESEL GENERATORS
Dear Mr. Denton:
Enclosed are three (3) copies of Revision 2 of the TDI Diesel Generator Design Review and Quality Revalidation (DR/QR) Report for the Vogtle Electric Generating Plant (VEGP). This, report has been prepared by the TDI Diesel Generator Owners' Group for the VEGP Diesel Generators.
The ' report has not been reviewed in detail by Georgia Power Company (GPC) to date; therefore, svibmittal of the report at this time constitutes neither agreement nor disagreement on' the part of GPC with the requirements made therein by the TDI Owners' Group. A full review of the DR/QR report and evaluation of the recommendations by GPC is now under way.
Sincerely, rd J. A. Bailey Project Licensing Manager JAB /caa xc:. R. S. Conway R. A. Thomas i
J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller (2)
B. Jones, Esquire G. Bockhold, Jr.
NRC Regional Administrator h\\
NRC Resident Inspector g
Vl1,$
D. C. Teper W. C. Ramsey L. T. Gucwa 1
C. H. Berlinger (1)
Vogtle Project File 8608290092 860822 PDR ADOCK 05000424 i
PDR f
S 0681V
,1
--