Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203J270 + (ML20203J270)
- ML20203J273 + (ML20203J273)
- 05000354/LER-1986-032, :on 860630,manual Scram Initiated to Shut Down for Troubleshooting,As Controlled Rod Insertion Precluded by Malfunction of Reactor Manual Control Sys.Caused by Faulty Transmitter Card.Card Replaced + (ML20203J274)
- ML20203J275 + (ML20203J275)
- ML20203J276 + (ML20203J276)
- ML20203J277 + (ML20203J277)
- ML20203J278 + (ML20203J278)
- ML20203J280 + (ML20203J280)
- 3F0786-22, Ro:On 860629,reactor Bldg Vented to Relieve Long Term Pressure Buildup.Initially Reported on 860630.Draft LER Under Mgt Review to Determine Reporting Requirements.Next Rept Will Be Submitted by 860808 + (ML20203J281)
- 3F1297-24, Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings + (ML20203J282)
- ML20203J283 + (ML20203J283)
- ML20203J287 + (ML20203J287)
- ML20203J293 + (ML20203J293)
- ML20203J294 + (ML20203J294)
- 05000247/LER-1986-022, :on 860630,low Level Alarm Setpoints for Refueling Water Storage Tank Level Transmitters Discovered Outside Low Level Setpoint Margin Spec.Barton Model 288 Will Be Replaced W/Foxboro Model N-823DP + (ML20203J295)
- ML20203J296 + (ML20203J296)
- ML20203J297 + (ML20203J297)
- 05000341/LER-1986-018, :on 860705,power to Reactor Bldg Ventilation Exhaust Gaseous Effluent Radiation Monitor Lost,Actuating Several ESF Sys.Disconnect Switch MCC 72B-4C Not Fully in on Position.Exact Cause Unknown + (ML20203J298)
- ML20203J300 + (ML20203J300)
- ML20203J301 + (ML20203J301)
- ML20203J302 + (ML20203J302)
- ML20203J303 + (ML20203J303)
- ML20203J306 + (ML20203J306)
- ML20203J308 + (ML20203J308)
- 05000482/LER-1986-040, :on 860702,control Room Ventilation Isolation Signal Occurred During Operational Testing on Control Room Air Intake Radiation Monitor Gk RE-05.Caused by Personnel Error.Test Procedures Being Revised + (ML20203J309)
- ML20203J314 + (ML20203J314)
- ML20203J315 + (ML20203J315)
- ML20203J316 + (ML20203J316)
- ML20203J318 + (ML20203J318)
- ML20203J319 + (ML20203J319)
- ML20203J320 + (ML20203J320)
- ML20203J321 + (ML20203J321)
- JAFP-98-0074, Responds to NRC Re Violations Noted in Insp Rept 50-333/97-08 on 971027-1221.Corrective Actions:Operations Manager Has Reviewed Results of Root Cause Evaluation W/ Operations Shift Personnel + (ML20203J322)
- ML20203J323 + (ML20203J323)
- ML20203J325 + (ML20203J325)
- ML20203J326 + (ML20203J326)
- IA-97-401, Investigation Rept on 940916.Noncompliacce Noted.Major Areas Investigated:Casual Factors Contributing to Emergency Feedwater Valve Leakage Event Described in Event Rept 94-016 + (ML20203J331)
- ML20203J331 + (ML20203J331)
- ML20203J332 + (ML20203J332)
- ML20203J333 + (ML20203J333)
- ML20203J335 + (ML20203J335)
- 0CAN029802, Informs of Revised Commitment Re GL 87-02,Suppl 1.Util Will Complete Relay Resolution by 1R15 Which Is Currently Scheduled to Begin on 990925 + (ML20203J337)
- ML20203J338 + (ML20203J338)
- ML20203J340 + (ML20203J340)
- ML20203J346 + (ML20203J346)
- ML20203J347 + (ML20203J347)
- ML20203J348 + (ML20203J348)
- ML20203J350 + (ML20203J350)
- ML20203J351 + (ML20203J351)
- ML20203J355 + (ML20203J355)
- IR 05000298/1997019 + (ML20203J363)