Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G098 + (ML20203G098)
- ML20203G099 + (ML20203G099)
- ML20203G102 + (ML20203G102)
- ML20203G103 + (ML20203G103)
- ML20203G106 + (ML20203G106)
- ML20203G107 + (ML20203G107)
- ML20203G109 + (ML20203G109)
- ML20203G110 + (ML20203G110)
- IR 05000352/1997007 + (ML20203G111)
- ML20203G112 + (ML20203G112)
- 05000295/LER-1997-024, Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl + (ML20203G113)
- ML20203G115 + (ML20203G115)
- ML20203G116 + (ML20203G116)
- ML20203G117 + (ML20203G117)
- ML20203G121 + (ML20203G121)
- ML20203G122 + (ML20203G122)
- 05000295/LER-1997-024-01, :on 971113,TS Surveillance for Pressurizer Pressure Instrument Channel Was Missed.Caused by Procedural Inadequacy of Pressurizer Pressure Functional Test.Revised Appropriate Procedures & Tested Pressurizer Pressure + (ML20203G125)
- ML20203G127 + (ML20203G127)
- ML20203G129 + (ML20203G129)
- ML20203G131 + (ML20203G131)
- ML20203G132 + (ML20203G132)
- ML20203G133 + (ML20203G133)
- ML20203G134 + (ML20203G134)
- ML20203G137 + (ML20203G137)
- ML20203G139 + (ML20203G139)
- ML20203G143 + (ML20203G143)
- 05000454/LER-1997-022-03, :on 971114,determined That Ssps Logic Testing Had Not Been Performed.Caused by Inadequate Testing Design. Added New Testing Criteria to Ssps bi-monthly Surveillance Procedures & Successfully Performed Testing + (ML20203G144)
- ML20203G146 + (ML20203G146)
- 05000213/LER-1986-017, :on 860317,inoperable Fire Barrier Penetration Seals Found During 18-month Surveillance Insp.Caused by Degraded Grout Seals.Penetrations Temporarily Sealed.W/ + (ML20203G147)
- ML20203G148 + (ML20203G148)
- TXX-4770, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters Which May Be Above Root Valve W/O Steam Traps or Wet Legs.Initially Reported on 860321. Evaluation Continuing.Next Rept by 860523 + (ML20203G150)
- ML20203G151 + (ML20203G151)
- ML20203G153 + (ML20203G153)
- ML20203G154 + (ML20203G154)
- ML20203G156 + (ML20203G156)
- ML20203G158 + (ML20203G158)
- ML20203G159 + (ML20203G159)
- ML20203G160 + (ML20203G160)
- ST-HL-AE-1652, Third Interim Deficiency Rept Re Mixing of Grease in safety- Related Equipment.Initially Reported on 850916.Lubrication Problem Resolution Program Defined & Initiated.Next Rept Will Be Submitted by 860829 + (ML20203G163)
- ML20203G164 + (ML20203G164)
- 05000366/LER-1986-006-01, :on 860320,hydraulic Shock & Sway Arrestor Insp & Test Procedure Determined Inadequate,Per Tech Spec Section 4.7.4.b.Caused by Failure to Revise Procedure After License Amend + (ML20203G166)
- ML20203G167 + (ML20203G167)
- PNO-II-93-007, on 930204,plant Commenced Power Reduction Due to Identified Steam Leakage on 1B1 MSR High Pressure Operating Vent Line.Resident Inspectors Have Been Following Licensee Actions.State of Tn Not Required to Be Informed + (ML20203G168)
- ML20203G169 + (ML20203G169)
- ML20203G170 + (ML20203G170)
- 05000382/LER-1997-028, :on 970720,automatic Start of EDG a Occurred Due to Loss of Power to 3A Safety Bus.Caused by Spurious Trip of 86A2 Relay.Reset 86A2 Relay,Closed 2-3 Tie Breaker & Restored Offsite Power + (ML20203G171)
- ML20203G173 + (ML20203G173)
- PNO-IV-93-022, licensee Reported Administered Diagnostic Dose of NaI-131 to Female Patient Who Had Been Scheduled for Tc-99m Bone Scan.Patient Was Administered Ipecac to Induce Vomiting.Region IV Was Notified of Occurrence on 930727 + (ML20203G179)
- ML20203G180 + (ML20203G180)
- ML20203G181 + (ML20203G181)
- ML20203G182 + (ML20203G182)