Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G057 + (ML20203G057)
- ML20203G058 + (ML20203G058)
- ML20203G060 + (ML20203G060)
- ML20203G063 + (ML20203G063)
- ML20203G064 + (ML20203G064)
- ML20203G067 + (ML20203G067)
- ML20203G070 + (ML20203G070)
- PY-CEI-NRR-0508, Forwards Perry Nuclear Power Plant-Unit 1,Offgas Sys Charcoal Adsorber Combustion Events Final Rept. Temp & Combustion Product Plots of 860706 & 0602 Events Also Encl + (ML20203G074)
- ML20203G075 + (ML20203G075)
- ML20203G076 + (ML20203G076)
- ML20203G079 + (ML20203G079)
- ML20203G080 + (ML20203G080)
- ML20203G081 + (ML20203G081)
- 05000482/LER-1997-015-01, Forwards LER 97-015-01 Which Documents That Violation of TSs Occurred Re Required ISI VT-3 Exams of Pressurizer Safety Valves,Per 10CFR50.73(a)(2)(i)(B) + (ML20203G087)
- ML20203G088 + (ML20203G088)
- ML20203G091 + (ML20203G091)
- ML20203G093 + (ML20203G093)
- ML20203G097 + (ML20203G097)
- ML20203G098 + (ML20203G098)
- ML20203G099 + (ML20203G099)
- ML20203G102 + (ML20203G102)
- ML20203G103 + (ML20203G103)
- ML20203G106 + (ML20203G106)
- ML20203G107 + (ML20203G107)
- ML20203G109 + (ML20203G109)
- ML20203G110 + (ML20203G110)
- IR 05000352/1997007 + (ML20203G111)
- ML20203G112 + (ML20203G112)
- 05000295/LER-1997-024, Forwards LER 97-024-00,per 10CFR50.73(a)(2)(i)(B). Commitments Made by Util,Encl + (ML20203G113)
- ML20203G115 + (ML20203G115)
- ML20203G116 + (ML20203G116)
- ML20203G117 + (ML20203G117)
- ML20203G121 + (ML20203G121)
- ML20203G122 + (ML20203G122)
- 05000295/LER-1997-024-01, :on 971113,TS Surveillance for Pressurizer Pressure Instrument Channel Was Missed.Caused by Procedural Inadequacy of Pressurizer Pressure Functional Test.Revised Appropriate Procedures & Tested Pressurizer Pressure + (ML20203G125)
- ML20203G127 + (ML20203G127)
- ML20203G129 + (ML20203G129)
- ML20203G131 + (ML20203G131)
- ML20203G132 + (ML20203G132)
- ML20203G133 + (ML20203G133)
- ML20203G134 + (ML20203G134)
- ML20203G137 + (ML20203G137)
- ML20203G139 + (ML20203G139)
- ML20203G143 + (ML20203G143)
- 05000454/LER-1997-022-03, :on 971114,determined That Ssps Logic Testing Had Not Been Performed.Caused by Inadequate Testing Design. Added New Testing Criteria to Ssps bi-monthly Surveillance Procedures & Successfully Performed Testing + (ML20203G144)
- ML20203G146 + (ML20203G146)
- 05000213/LER-1986-017, :on 860317,inoperable Fire Barrier Penetration Seals Found During 18-month Surveillance Insp.Caused by Degraded Grout Seals.Penetrations Temporarily Sealed.W/ + (ML20203G147)
- ML20203G148 + (ML20203G148)
- TXX-4770, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters Which May Be Above Root Valve W/O Steam Traps or Wet Legs.Initially Reported on 860321. Evaluation Continuing.Next Rept by 860523 + (ML20203G150)
- ML20203G151 + (ML20203G151)
- ML20203G153 + (ML20203G153)