Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203A797 + (ML20203A797)
- 05000263/LER-1986-008, :on 860307,isolations of Reactor Bldg Ventilation Sys & Initiations of Standby Gas Treatment Sys Occurred.Caused by Spurious hi-hi Trip from Channel B Gas Monitor.Test Switches Will Be Installed + (ML20203A798)
- ML20203A805 + (ML20203A805)
- ML20203A806 + (ML20203A806)
- ML20203A808 + (ML20203A808)
- ML20203A809 + (ML20203A809)
- ML20203A811 + (ML20203A811)
- ML20203A812 + (ML20203A812)
- ML20203A813 + (ML20203A813)
- ML20203A814 + (ML20203A814)
- ML20203A817 + (ML20203A817)
- ML20203A819 + (ML20203A819)
- 05000245/LER-1998-001-02, :on 980109,MRP Determined That There Have Been Periods During Power Operation When Backup Pressure Regulator Was Oos.Caused by Inadequate Understanding of Safety Analysis.Evaluation Will Be Performed + (ML20203A820)
- ML20203A822 + (ML20203A822)
- ML20203A824 + (ML20203A824)
- ML20203A826 + (ML20203A826)
- ML20203A829 + (ML20203A829)
- ML20203A831 + (ML20203A831)
- 05000483/LER-1998-002, :on 980115,determined That Missile Shield Had Not Been Closed During Past Eight Refueling Outages.Caused by TS Failing to Address Missile Shield During Refueling Outages.Developed Administrative Controls + (ML20203A832)
- ML20203A834 + (ML20203A834)
- ML20203A836 + (ML20203A836)
- ML20203A837 + (ML20203A837)
- ML20203A839 + (ML20203A839)
- ML20203A840 + (ML20203A840)
- ML20203A841 + (ML20203A841)
- ML20203A842 + (ML20203A842)
- ML20203A843 + (ML20203A843)
- ML20203A844 + (ML20203A844)
- PNO-II-97-062, on 971211,licensee Reported That Between Apr 1995 & Jul 1996 Nine Misadministrations Involving Sr-90 Eye Applicator Occurred,As Result of Apparent Incorrect Decay Calculation of Source.Commonwealth of Pr Will Be Notified + (ML20203A847)
- 05000265/LER-1986-004-06, :on 860314,HPCI Turbine Tripped Due to Turbine Exhaust Pressure Switch 2-2368A Failure.Caused by Corroded Seals in Pressure Switch Allowing Moisture in Casing.Switch Replaced + (ML20203A848)
- ML20203A850 + (ML20203A850)
- ML20203A851 + (ML20203A851)
- ML20203A853 + (ML20203A853)
- A98008, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-25 & 50-304/97-25.Corrective Actions:Revised Procedure SOI-61F to Reflect Need to Verify Position of 2MOV-SW0023 & Revised Procedure PT-10-3 to Provide Guidance + (ML20203A854)
- ML20203A855 + (ML20203A855)
- ML20203A856 + (ML20203A856)
- ML20203A857 + (ML20203A857)
- ML20203A859 + (ML20203A859)
- BVY-97-166, Requests Extension of Addl Fifteen Days to Respond to NRC 971120 RAI Re EDG Skid Mounted Piping + (ML20203A860)
- ML20203A861 + (ML20203A861)
- B16868, Informs That J Rogers,SOP-10703-0 & D Bronson,SOP-10702-0,no Longer Need to Maintain Senior Operating Licenses + (ML20203A863)
- ML20203A864 + (ML20203A864)
- ML20203A865 + (ML20203A865)
- 05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed + (ML20203A870)
- PY-CEI-NRR-2259, Plant,Jan-Dec 1997 Annual Rept to Nrc + (ML20203A871)
- ML20203A872 + (ML20203A872)
- PNO-IV-86-024, on 860710,overflow of Approx 2,000 Gallons Occurred While Filling Emergency Diesel Fuel Oil Storage Tank.Augmented Fire Protection Measures Established.Cleanup Underway + (ML20203A874)
- ML20203A875 + (ML20203A875)
- NG-98-0252, Monthly Operating Rept for Jan 1998 for Duane Arnold Energy Center + (ML20203A877)
- ML20203A880 + (ML20203A880)
- ML20203A881 + (ML20203A881)