Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0198-42, Forwards Rev 8 to Abnormal Procedure (AP) 961, Earthquake, as Supplemental Response for Resolution of USI A-46 + (ML20199H324)
- ML20199H325 + (ML20199H325)
- ML20199H327 + (ML20199H327)
- ML20199H330 + (ML20199H330)
- 05000352/LER-1997-010, Forwards LER 97-010-00 Re Condition Outside Design Basis Involving Suppression Chamber Steam Bypass Leakage Path, Which Occurred on 841026 & 890812 + (ML20199H331)
- ML20199H333 + (ML20199H333)
- JPN-99-002, Forwards Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 + (ML20199H336)
- 05000482/LER-1997-016-02, Forwards LER 97-016-02,correcting Discrepancy Between Abstract & Additional CA Sections of LER 97-016-01,dtd 971219 Re Completion Date for Planned Fire Protection Organization Structure & Program Ownership self-assessment + (ML20199H337)
- ML20199H343 + (ML20199H343)
- ML20199H347 + (ML20199H347)
- RC-97-0236, Requests That NRC Exercise Discretion Not to Enforce Compliance to AOT for Addl 12 H Beyond Expiration of Listed Date & Times,Per TS 3.8.1.1.b + (ML20199H349)
- ML20199H350 + (ML20199H350)
- ML20199H351 + (ML20199H351)
- U-602869, Monthly Operating Rept for Oct 1997 for Clinton Power Station,Unit 1 + (ML20199H354)
- ML20199H355 + (ML20199H355)
- ML20199H356 + (ML20199H356)
- ML20199H358 + (ML20199H358)
- ML20199H359 + (ML20199H359)
- ML20199H361 + (ML20199H361)
- ML20199H362 + (ML20199H362)
- ML20199H363 + (ML20199H363)
- ML20199H365 + (ML20199H365)
- ML20199H366 + (ML20199H366)
- ML20199H367 + (ML20199H367)
- ML20199H368 + (ML20199H368)
- ML20199H369 + (ML20199H369)
- ML20199H371 + (ML20199H371)
- ML20199H373 + (ML20199H373)
- ML20199H374 + (ML20199H374)
- ML20199H375 + (ML20199H375)
- 05000213/LER-1986-011, :on 860228,discovered That Fire Protection Water Sys Line & Sprinkler Line Inadvertently Isolated on 860226.Caused by Misinterpretation of Tech Specs.Hourly Fire Watch Established + (ML20199H377)
- ML20199H378 + (ML20199H378)
- ML20199H379 + (ML20199H379)
- ML20199H381 + (ML20199H381)
- NRC-98-0016, Forwards Certified Copies of Listed Nuclear Liability Insurance Documents + (ML20199H384)
- ML20199H386 + (ML20199H386)
- 05000373/LER-1997-038, :on 971020,inadequate Calibr of HR Instrumentation Was Noted.Caused by Misinterpretation of Ts. Channel Functional Testing Requirements for HR Sys Will Be Corrected Through Procedure Changes + (ML20199H388)
- ML20199H390 + (ML20199H390)
- ML20199H392 + (ML20199H392)
- ML20199H399 + (ML20199H399)
- ML20199H400 + (ML20199H400)
- ML20199H406 + (ML20199H406)
- ML20199H407 + (ML20199H407)
- ML20199H409 + (ML20199H409)
- ML20199H413 + (ML20199H413)
- ML20199H416 + (ML20199H416)
- ML20199H417 + (ML20199H417)
- IR 07100125/2012008 + (ML20199H419)
- ML20199H420 + (ML20199H420)
- 05000424/LER-1997-010-01, :on 971019,manual RT During CR Drop Time Testing Was Noted.Caused by Failed Detector/Encoder Card in Dpri B Data Cabinet.Crs Were Withdrawn,Selecting Data a Only W/No Valid Rod Deviations Indicated + (ML20199H423)
- ML20199H424 + (ML20199H424)