Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198T133 + (ML20198T133)
- ML20198T135 + (ML20198T135)
- ML20198T136 + (ML20198T136)
- ML20198T137 + (ML20198T137)
- ML20198T138 + (ML20198T138)
- BSEP-97-0391, Forwards Public Files Version of Revised Epips,Including Rev 60 to OPEP-App a, Emergency Response Resources, Rev 3 to OPER-02.6.28, Offsite Protective Action Recommendations & Rev 1 to Opep, Emergency Exposure Controls. W/971112 Memo + (ML20198T139)
- ML20198T140 + (ML20198T140)
- ML20198T141 + (ML20198T141)
- DD-86-06, Advises That Time Provided to Review Directors Decision DD-86-06 Expired.Decision Became Final Agency Action on 860609.Served on 860610 + (ML20198T142)
- VPN-005-99, Rev 3 to License Change Application 237 to License NPF-1, Inserting New License Condition to Authorize Loading of Spent Fuel & Other Matls Into Transtor Transfer & Storage Casks in Fuel Bldg + (ML20198T145)
- 05000361/LER-1997-013, :on 971010,charcoal Filter Surveillance Testing Was Not Current.Caused by Cognitive Personnel Error.No Irradiated Fuel Has Been Moved in Either Fuel Bldg Since 970522.Filters Will Be Replaced Before Fuel Is Next Moved + (ML20198T147)
- ML20198T149 + (ML20198T149)
- ML20198T151 + (ML20198T151)
- ML20198T152 + (ML20198T152)
- ML20198T153 + (ML20198T153)
- ML20198T154 + (ML20198T154)
- ML20198T157 + (ML20198T157)
- ML20198T158 + (ML20198T158)
- ML20198T159 + (ML20198T159)
- ML20198T161 + (ML20198T161)
- ML20198T162 + (ML20198T162)
- 05000254/LER-1997-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed + (ML20198T164)
- VPN-004-99, Forwards Rev 5 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Table 2.2-5 Is Revised to Depict Major Components Removed from Plant During 1998.Revs Are Denoted by Side Bars + (ML20198T165)
- ML20198T166 + (ML20198T166)
- 05000254/LER-1997-027-01, :on 971218,EDGs Were Simultaneously Inoperable While Unit 1 Was at Power Due to Time Delay Relay 2 Failing to Meet Acceptance Criteria.Unit 1/2 EDG TD2 Relay Was Replaced & Tested Satisfactorily + (ML20198T169)
- ML20198T170 + (ML20198T170)
- ML20198T172 + (ML20198T172)
- ML20198T173 + (ML20198T173)
- ML20198T174 + (ML20198T174)
- ML20198T175 + (ML20198T175)
- ML20198T177 + (ML20198T177)
- ML20198T179 + (ML20198T179)
- ML20198T181 + (ML20198T181)
- ML20198T182 + (ML20198T182)
- ML20198T185 + (ML20198T185)
- ML20198T188 + (ML20198T188)
- ML20198T189 + (ML20198T189)
- ML20198T190 + (ML20198T190)
- ML20198T192 + (ML20198T192)
- ML20198T193 + (ML20198T193)
- ML20198T196 + (ML20198T196)
- ML20198T199 + (ML20198T199)
- ML20198T200 + (ML20198T200)
- ML20198T201 + (ML20198T201)
- 3F1197-36, Provides Addl Info Re Four Items Identified During Recent SSFI 50-302/97-14 on 971006-1024 at Plant,Unit 3.Fourth Item Requiring Addl Info Involves Qualification of Large Bore safety-related Piping & Piping Support + (ML20198T202)
- ML20198T203 + (ML20198T203)
- ML20198T205 + (ML20198T205)
- CY-97-115, Responds to NRC Re Violations Noted in Insp Rept 50-213/97-03 on 970805.Corrective Actions:Star Process Will Be Emphasized in Special Seminar as Self Checking Tool to Reduce Personnel Errors + (ML20198T206)
- ML20198T207 + (ML20198T207)
- ML20198T208 + (ML20198T208)
- ML20198T212 + (ML20198T212)