Forwards Revised Emergency Plan Implementing Procedures Per SER Open Item 13,including Rev 2 to 9100-C, Emergency Classification..., Corporate Implementing Procedures & Rev to Communications Plan Procedures
ML20198T205
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/09/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20198T209 List:
References
GN-938, NUDOCS 8606110368
Download: ML20198T205 (5)


Text

. Georgia Powir Company Route 2. Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724 8114 Southern Company Services Inc Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtle Proj.ect June 9, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:

Mr. B. J. Youngblood Log:

GN-938 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER OPEN ITEM 13: EMERGENCY PLANNING

Dear Mr. Denton:

In accordance with 10 CFR 50, Appendix E Part V, Georgia Power is hereby sub;nitting the detailed implementing procedures for the Vogtle Emergency Plan. Enclosed are two (2) copies of the following procedures:

o Emergency Plan Implementing Procedures, Vogtle Electric Cenerating Plant, Volumes 1 and 2 o Vogtle Corporate Implementing Procedures o Vogtle Communications Plan Implementing Procedures By copy of this letter Dr. J. Nelson Grace, NRC Regional Administrator, will receive one copy of the following:

o Vcgtle Corporate Implementing Procedures o Vogtle Communications Plan Implementing Procedures Dr. Grace has already received a copy of the Emergency Plan Implementing Procedures.

Should you have any questions, please inquire.

Sincerely, Wh/

/"\\

A A

/

O J. A. Bailey g

Project Licensing Manager JAB /caa 9

D y

Enclosures 8606110368 860609 f

PDR ADOCK 05000424 F

PDR O

V

~

i Mr. B. J. Youngblood File: X7BC35 Director of Nuclear Reactor Regulation Log: GN-938 Page 2 xc:

R. E. Conway (w/o Encl.)

G. Bockhold, Jr. (w/o Encl.)

R. A. Thomas (w/o Encl.)

D. C. Teper J. E. Joiner, Esquire W. C. Ramsey (w/o Encl.)

B. W. Churchill, Esquire NRC Resident Inspector (w/o Encl.)

M. A. Miller (2)

L. T. Gucwa (w/o Encl.)

B. Jones, Esquire Vogtle Project File 0492V t

I k

I l

1 I

l l

i

r

\\

ACKNOWLEDGEMENT RECORD I have received Vogtle Emergency Communications Plan Implementing Procedures, including procedures numbered VECP-01 through VECP-41, dated April 14, 1986.

\\

Signed (Please print name below and sign above)

Name Document Control Desk (NRC)

Book Numbers 338 and 339 I

RETURN TO:

Cherry Umberger Georgia Power Company 22'nd Floor

)

Atl}anta,GeorgiaPiedmont Building 33 30308

\\

\\

\\

s f

1

/

- - g

4

' e Georg a Fo6er Company 5

Page i of1 o 2 80 2 Wavestoro Georg a 3C83v fe'acnore 404 72 9ii4 4]4 5544Mt DOCUMENT TRANSMITTAL L"

OM Vogue Progect Transmittal No:

    • EP-8 TO:

DOCllMFNT CONTDal nFW (NDI-)

DATE:

6-2-86 REMARKS:

    • THIS IS THE ORIGINAL DISTRIBUTION ON EERGENCY PIAN IMPLEENTATION IMNUAL SET NO: 69 No. of Number and/or Title Rev.

Copies Remarks COMPLETE ISSUE OF E E RGFNCY 1

COPFLETE ISSUE PLAN IMPLEENTATION PROCFDilRFS CONSISTING 0F 2 V01.UES SEE ATTACHED AND SIGN BELOW

(

)

INSTRUCTIONS 1.

Verify that documents received agree with above description.

2.

Incorporate the transmitted documents into your files.

3.

Documents or portions thereof presently in your possession which are superseded by the documents hereby transmitted MUST be clearly stamped or marked " VOID" or "FOR INFORMATION ONLY", or destroyed.

4.

Sign in the space below indicating that you have completed these instructions and return this ENTIRE FORM to the below address.

5.

On-site recipients should sign and return this transmittal within 10 days.

6.

Off-site recipients should sign and return this transmittal within 30 days.

Date Signature of Recipicnt Return this sheet to:

Nuclear Operations Document Control Supervisor Georgia Power Company Route 2, Box 299A Waynesboro, Georgia 30830

r NUCt. EAR OPERATIONS-Instruction GeorgiaPower A NOI-08-128 TRANSMITTAL AND RECEIFT FORM Date:

June 6, 1986 TO:

Document Control Desk (NRC)

Enclosed is a copy / copies of revision (s) to the Vogtle Electric Generating Plant Corporate Plan Implementing Procedures.

For tracking purposes please sign,

date, and return this acknowledgment fom.

The specific revisions involve procedures:

R@!72KK Procedures:

Complete set of Vogtle Corporate Implementing Procedures, Copy #35.

Ci S.C. Ewald Manager, Radiological Safety

)

_________________g,,,,,p,,,g ________________

Revisions to the Vogtle Electric Generating Plant Corporate Plan Implementing Procedures were received on (date)

The Procedures received were:

(Signature)

Return receipt to:

Georgia Power Company Attn:

S.C. Ewald I.'anager, Radiological Safety P.O. Box 4545 Atlanta, GA 30302