- NOC-AE-0054, Forwards Rev 4A of STP Security Personnel Training & Qualification Plan,Per 10CFR50.54(p)(2).Plan Withheld + (ML20198L791)
- IR 05000293/1998010 + (ML20198L796)
- ML20198L798 + (ML20198L798)
- IR 05000335/2020010 + (ML20198L803)
- ML20198L804 + (ML20198L804)
- ML20198L808 + (ML20198L808)
- ML20198L809 + (ML20198L809)
- 3F0198-26, Confirms 980108 Meeting Discussion Between FPC & NRC Re Complex Habitability Envelope Justification for Continued Operation Issues at Crystal River,Unit 3 + (ML20198L810)
- ML20198L811 + (ML20198L811)
- ML20198L813 + (ML20198L813)
- ML20198L816 + (ML20198L816)
- ML20198L817 + (ML20198L817)
- ML20198L818 + (ML20198L818)
- IR 05000458/1998099 + (ML20198L820)
- ML20198L821 + (ML20198L821)
- ML20198L823 + (ML20198L823)
- ML20198L828 + (ML20198L828)
- ML20198L829 + (ML20198L829)
- PNO-III-89-032, on 890425,while Plant Was in First Refueling Outage,Approx 30,000 Gallons of Condensate Storage Tank Water Inadvertently Was Drained Into Suppression Pool,W/Some Water Entering Drywell Over Weir Wall + (ML20198L831)
- ML20198L834 + (ML20198L834)
- ML20198L836 + (ML20198L836)
- ML20198L839 + (ML20198L839)
- ML20198L841 + (ML20198L841)
- 05000382/LER-1995-002-01, Forwards LER 95-002-01 Providing Details of Design Change 3448 Installed During Refueling Outage 8 as Result of 950610 Reactor Trip,Partial Loss of Offsite Power & Fire.Revised Info Identified by Vertical Line in right-hand + (ML20198L842)
- ML20198L843 + (ML20198L843)
- ML20198L845 + (ML20198L845)
- IR 015000020/1997001 + (ML20198L847)
- ML20198L848 + (ML20198L848)
- ML20198L849 + (ML20198L849)
- ML20198L852 + (ML20198L852)
- ML20198L854 + (ML20198L854)
- ML20198L855 + (ML20198L855)
- 05000382/LER-1995-002, :on 950610,reactor Trip,Partial Loss of Offsite Power & non-safety Related Switchgear Fire Occurred.Caused by Improper Automatic Bus Transfer.New Automatic Bus Transfer Scheme Installed + (ML20198L856)
- ML20198L857 + (ML20198L857)
- 05000373/LER-1986-017-02, :on 860503,reactor Scrammed on Low CRD Charging Water Header Pressure.Caused by Operator Reliance on Defective Low Level Alarm Annunciator.Annunciator Repaired & Operator Counseled + (ML20198L860)
- ML20198L862 + (ML20198L862)
- ML20198L863 + (ML20198L863)
- IR 015000019/1997006 + (ML20198L864)
- ML20198L867 + (ML20198L867)
- ML20198L869 + (ML20198L869)
- ML20198L870 + (ML20198L870)
- ML20198L872 + (ML20198L872)
- 05000259/LER-1986-008-01, :on 860212,two Events Experienced Re Failure of Air Solenoid Valves,Utilized in Diesel Air Start Sys,To Fully Close.Caused by Corrosion Products Entering Valves from Air Sys Piping.Air Sys Blown Down Daily + (ML20198L874)
- IR 015000038/1997003 + (ML20198L877)
- ML20198L879 + (ML20198L879)
- ML20198L881 + (ML20198L881)
- ML20198L887 + (ML20198L887)
- ML20198L888 + (ML20198L888)
- ML20198L890 + (ML20198L890)
- ML20198L891 + (ML20198L891)
- ML20198L892 + (ML20198L892)