Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198J649 + (ML20198J649)
- ML20198J650 + (ML20198J650)
- ML20198J652 + (ML20198J652)
- ML20198J653 + (ML20198J653)
- ML20198J654 + (ML20198J654)
- ML20198J655 + (ML20198J655)
- ML20198J657 + (ML20198J657)
- ML20198J658 + (ML20198J658)
- NSD-NRC-97-5504, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses Also Encl + (ML20198J659)
- ML20198J660 + (ML20198J660)
- ML20198J661 + (ML20198J661)
- B17593, Requests Relief from Requirements of 10CFR50.55a(g)(5) for Performing Required ISI of Certain Class 2 Components IAW ASME Section XI for Mnps,Unit 3.Rev 2 to Relief Request IR-9,encl + (ML20198J662)
- ML20198J663 + (ML20198J663)
- ML20198J664 + (ML20198J664)
- ML20198J665 + (ML20198J665)
- B16743, Forwards Revised Reactor Vessel Pressure Vessel Data Sheets, in Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Minor Changes to Weld Property Data from New Data Did Not Result in Any Weld Becoming Limiting + (ML20198J667)
- ML20198J668 + (ML20198J668)
- ML20198J669 + (ML20198J669)
- ML20198J670 + (ML20198J670)
- 3F0198-25, Provides Outage Assessment Rept,Which Describes Accomplishments During Current Outage,Which Began in Sept 1996.Rept Includes Broad Restart Readiness Overview & Individual Repts for Listed Functional Areas + (ML20198J671)
- ML20198J672 + (ML20198J672)
- B17589, Forwards Current Schedule for Submission of LARs Planned or Required in 1998 or 1999,as Committed to in Licensee .List Includes Amend Requests Required for RF06 + (ML20198J673)
- ML20198J674 + (ML20198J674)
- ML20198J676 + (ML20198J676)
- ML20198J677 + (ML20198J677)
- ML20198J679 + (ML20198J679)
- ML20198J680 + (ML20198J680)
- ML20198J683 + (ML20198J683)
- ML20198J684 + (ML20198J684)
- 05000327/LER-1998-004, Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval + (ML20198J685)
- ML20198J686 + (ML20198J686)
- ML20198J687 + (ML20198J687)
- ML20198J688 + (ML20198J688)
- ML20198J690 + (ML20198J690)
- ML20198J691 + (ML20198J691)
- ML20198J693 + (ML20198J693)
- ML20198J694 + (ML20198J694)
- ML20198J695 + (ML20198J695)
- ML20198J696 + (ML20198J696)
- ML20198J697 + (ML20198J697)
- 05000327/LER-1998-004-02, :on 981120,failure to Perform Surveillance within Required Time Interval,Was Determined.Caused by Leaking Vent Valve.Engineering Personnel Evaluated Alternative Methods for Performing Channel Check + (ML20198J699)
- RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 + (ML20198J702)
- ML20198J704 + (ML20198J704)
- ML20198J705 + (ML20198J705)
- ML20198J707 + (ML20198J707)
- ULNRC-03946, Forwards RAI Re Proposed Conversion to Improved Tech Specs Sections 1.0,3.1,3.2,3.3,3.4,3.7,3.9 & 5.0.Suppl to Ref Will Be Provided at Later Date + (ML20198J708)
- ML20198J709 + (ML20198J709)
- ML20198J710 + (ML20198J710)
- ML20198J712 + (ML20198J712)
- 2CAN129805, Submits Addl Info on TS Change Request Re Main Stream Safety Valves & Pressurizer Safety Valves,In Response to 981222 Conversation with NRC + (ML20198J713)
- ML20198J714 + (ML20198J714)