ML20198J686

From kanterella
Jump to navigation Jump to search
Confirms Dates of 980114-16,for Us NRC to Conduct Insp of Nuclear Logistics,Inc,Facility in Fort Worth,Texas.Insp Re Implementation of QAP Established to Control Svcs Related to Refurbishment of 480 Volt Circuit Breakers
ML20198J686
Person / Time
Issue date: 01/09/1998
From: Black S
NRC (Affiliation Not Assigned)
To: Bell A
NUCLEAR LOGISTICS, INC. (NLI)
References
REF-QA-99901298 99901298-98-01, 99901298-98-1, NUDOCS 9801140188
Download: ML20198J686 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ -

J i

January 9, 1998 Mr. Archie C. Bell, Manager.

Quality Assurance Nucleer Logistics, Inc.

7461 Airport Freeway Fo.1 Worth, Texas 76118

SUBJECT:

CONFIRMATION OF UPCOMING NRC INSPECTION AT YOUR F/SILITY

Dear Mr. Bell:

This letter confirms the dates of January 14-16.1998, for the U. S. Nuclear Regulatory Commission staff to conduct an inspection of the Nuclear Logistics, Inc. (NLI) facility in Fort Worth, Texas. These dates were established in a telephone conversation on Jcnuary 8, 1998, between you and Mr. Kemalakar Naidu of this office.

1 The inspection will rt. late to the implementation of your quality assurance program that you have

' established to control services related to the refurbishment of 480 Volt circuit breakers.

- Specifically, the inspectors will review the records documenting the refurbishment of 480-Volt circuit breakers for Indian Point, Units 2, arid 3. In addition, the inspectors will review some items related to the manufacture of GNB batteries.

We look forward to your cooperation concoming this matter. If you have any questions please contact Mr. Kamalakar Naidu et (301) 415-2980.

Sincerely, Original signed by:

Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation NRC Docket No.99901298/98-01 b7 i

DISTRIBUTION:

PDR f. gj CENTRAL FILES 980114018e 900109 71D' l

DOCKET FillW PDR GA999 ENVNUCLO pb g q}

99901298 pogg RlDS lE:09 J

HOMB R/F

  • S:e previous concurrence Ts recelve a ecpy of thle document, Indicate in the bom! *C" = Copy without enclosures *E* '= Copy with enclosures *N* < L copy 0FFICE HOMB C

HOMB C

110MB:DRCH:

-N NAME K.Naidu R P.Correia /F SCBlack -T>b DATE.

01/08/98

  • 01/ct /98 01/ q /98 0FFICIAi. RECORD COPY DGCUMENT NAME: G:\\ DRAFT \\NAIDU\\ CONFIRM,NLI NRCTU.E CENTEPa CDPV #!IUl@l!!Il@lI oges

January 9,1999

- Mr. Archie C. Bell, Manager Quality Assurance Nuclear Logistics, Inc.

7461 Airport Freeway Fort Worth, Texas 7611f..

SUBJECT:

CONFlRM,ATION OF UPCOMING NRC INSPECTION AT YOUR FACILITY

Dear Mr. Bell:

This letter confirms the dates of January 14-16,1908, for the U. S. Nuclear Regulatory _

Commission staff to condat an inspection of the Nuclear Logistics, Inc. (NLI) facility in Fort Worth, Texas. These dates were established in a tclephone conversation on January 8, 1998, between you and Mr. Kamalakar Naidu of this office.

The inspection will relate to the implementation of your quality assurance program that you have established to control services related to the refurbishment of 480 Volt circuit breakers.

Specifically, the inspcters will review the reco.-ds documenting the refurbishment of 480-Volt circuit breakers for Indian Point. Units 2, and 3. In addition, the inspectors will review some items related to the manufacture of GNB betteries.

We look forward to your cooperation conceming this matter. If you have any questions please contact Mr. Kamalakar Naidu at (301) 415 2980.

Sincerely, Original signed by:

Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor Inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation NRC Docket No.99901298/98-01 DI9TRIBUTION:

PDR OENTRAL FILES f."

DOCKET FILES RIDS lE:09 HQMB R/F

  • S:e previous concurrence T. r*cetwo a copy of this document. Indicate in the boa:

'C' = Copy without enclosures *E" = Copy with enclosures *N* = No copy 0FFICE HOMB C

HOMB C

HOMB:DRCH:

N NAME K.Naidu R P.Correia/ F SCBlack 1$b DATE 101/08/98

  • 01/9 /98 01/ 'l /98 0FFICIAL RECORD COPY DOCUMENT NAME: G:\\ DRAFT \\NAIDU\\ CONFIRM.NLI

January 9, 1998 Mr. Archie C. Bell, Manager Quality Assurance Nuclear Logistics, Inc.

7461 Airport Freeway Fort Worth, Texas 76118

SUBJECT:

' CONFIRMATION OF UPCOMING NRC INSPECTION AT YOUR FACILITY-Daar Mr. Bell:

This letter confirrns the dates of January 14-16,1998, for thu U. S. Nuclear Regulatory Commission staff to conduct an inspection of the Nuclear Logistics, Inc. (NLI) facility in Fort Worth, Texas. These dates were established in a telephone conversation on January 8, 1998, between you and Mr. Kamalakar Naidu of this office.

The inspection will relate to the implementation of your quality assurance program that you have established to control services related to the refurbishment of 480 Voit circuit breakers.

Specifically, the inspectors will review the records documenting the refurbishment of 480-Volt circuit breakers for Indian Point, Units 2, and 3. In addition, the inspectors will review some items re!ated to the manufacture of GNB batteries.

We look forward to your cooperation conceming this matter. If you have any questions please contact Mr. Kamalakar Naidu at (301) 415-2980.

Sincerely, Original signed by:

Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation NRO Docket No.99901298/98-01 DISTRIBUTION:

PDR CENTRAL FILES

,7 DOCKET FILES RIDS lE:09 -

HQMB R/F

  • See previous concurrence.

T2 receive e copy of thie document, indicate in the box: 'C' = Copy without enclosures *E* = Copy with ericlosures *N* = No copy 0FFICE HOMB

-C HOMR C

HOMB:DRCH:

A/

NAME K.Naidu R P.Correia/ F SCBlack '"6b DATE 01/08/98

  • 01/c1 /98 01/ ) /98 0FFICIAL RECORD COPY DOCUMENT NAME: G:\\ DRAFT \\NAIDU\\ CONFIRM.NLI

1 January 9.- 1998 Mr Archie C. Bell, Manager Quality Assurance Nuclear Logistics, Inc.

7461 Airport Freeway Fort Worth, Texas 78118

/

SUBJECT:

CONFIRMATION OF UPCOMING NRC INSPECTION AT YOUR FACILITY

Dear Mr. Bell:

This letter confirms the dates of January 14-16,1998, for the U. S. Nuclear Regulatory Commission staff to conduct an inspection of the NJclear Logistics, Inc. (NLI) facility in Fort Worth, Texas. These dates were established in a telephone conversation on January 8, 1998, between you end Mr. Kamalakar Naidu of this office.

The inspection will relate to the implementation of your quality assurance program that you have estcblished to control services related to th6 refurbishment of 483 Volt circuit breakers.

Specifically, the inspectors will review the records doct'menting the refurbishment of 480-Volt circuit breakers for indian Point, Units 2, and 3. In addition, the inspectors will review some items related to the manufacture of GNE batteries.

We look forwacd to your cooperation conceming this matter. If you have any questions please contact Mr. Kamalakar Naidu at (301) 415-2980.

Sincerely, Original signed by: Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor inspection, and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation NRC Docket No.99901298/98-01 DISTRIBilTION:

PDR

' CENTRAL FILES J'."

DOCKET FILES RIDS IE:09 HQMB R/F

  • S^e previous concurrence Te receive e copy of thle document, Indicate in the box:
  • C' = Copy without eno'oeures *E' = Copy with c..cloeures *N* = No copy

~

OFFICE H0 rib C

HOMB C

HOMB:DRCH:

N NAME K.Naidu R P.Correia/ W SCBlack 1b DATE 01/08/98

  • 01/ 4 /98 01/ () /98 0FFICIAL RECORD COPY DOCUMENT NAME: G:\\ DRAFT \\NAIDUTCONFIRM.NLI I

I

\\

l

___w

__