Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198E811 + (ML20198E811)
- BSEP-97-0538, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108.Corrective Actions:Review Performed to Determine If Other Potential Areas Existed Where Water Could Be Introduced + (ML20198E813)
- ML20198E814 + (ML20198E814)
- ML20198E815 + (ML20198E815)
- ML20198E816 + (ML20198E816)
- ML20198E817 + (ML20198E817)
- ML20198E822 + (ML20198E822)
- ML20198E829 + (ML20198E829)
- ML20198E830 + (ML20198E830)
- ML20198E833 + (ML20198E833)
- ST-HL-AE-5676, Submits Amended Response to Request for Addl Info Re 10CFR50,App R,Deviation Request for Fire Area 07.Entire Package Resubmitted W/Previously Missing Matl in Italics. Procedures Encl + (ML20198E835)
- 05000302/LER-1997-043, :on 971208,deficiency in Electrical Design Criteria Resulted in Control Complex Chiller Motor Trip Set Point Set Below Full Load Ampere Setting,Was Discovered. Caused by Lack of Effective Cap.Established Improved CAP + (ML20198E836)
- ML20198E837 + (ML20198E837)
- ML20198E838 + (ML20198E838)
- ML20198E841 + (ML20198E841)
- ML20198E843 + (ML20198E843)
- ML20198E845 + (ML20198E845)
- ML20198E847 + (ML20198E847)
- ML20198E848 + (ML20198E848)
- ML20198E850 + (ML20198E850)
- ML20198E851 + (ML20198E851)
- ML20198E852 + (ML20198E852)
- ML20198E853 + (ML20198E853)
- ML20198E854 + (ML20198E854)
- NOC-AE-0382, Commitment Change Summary Rept for Period 970107-981208, Per 10CFR50.5(b)(2).Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change.With + (ML20198E855)
- ML20198E856 + (ML20198E856)
- ML20198E857 + (ML20198E857)
- ML20198E859 + (ML20198E859)
- ML20198E860 + (ML20198E860)
- ML20198E862 + (ML20198E862)
- ML20198E863 + (ML20198E863)
- ML20198E865 + (ML20198E865)
- ML20198E866 + (ML20198E866)
- ML20198E867 + (ML20198E867)
- ML20198E868 + (ML20198E868)
- ML20198E870 + (ML20198E870)
- ML20198E871 + (ML20198E871)
- ML20198E876 + (ML20198E876)
- L-97-001, Forwards Response to NRC Re Violations Noted in Insp Repts 50-334/97-01,50-412/97-01,50-334/97-02 & 50-412/97-02 & Enforcement Conference.Corrective Actions: Quality Svcs Performed Assessment of TS SRs for Units 1 & 2 + (ML20198E879)
- 05000321/LER-1986-020, :on 860425,RWCU Sys Inboard & Outboard Primary Containment Isolation Valves 2G31-F001 & 2G31-F004 Isolated on High Leakage Flow Signal.Caused by Disconnected Jumper During Functional Test.Isolation Reset + (ML20198E880)
- NRC-97-0090, Informs of Removal of Instrument Lines in SG Building to Improve Industrial Safety + (ML20198E884)
- TXX-4812, Interim Deficiency Rept CP-86-34 Re Anomalies Observed in Class 1E Inverters Supplied by Elgar Corp & Installed in Ac Distribution Sys.Evaluation Continuing.Submittal of Next Rept Anticipated by 860627 + (ML20198E885)
- CY-97-078, Submits Response to CAL 1-97-07 Re Radiation Protection Improvement Plan Implementation + (ML20198E888)
- ML20198E889 + (ML20198E889)
- 05000324/LER-1986-014, :on 860429,automatic Trip of Reactor Protection Sys Logic Channels a & B Occurred.Caused by Upscale Trip of Reactor Power intermediate-range Monitor D. Channels Reset + (ML20198E890)
- ML20198E892 + (ML20198E892)
- 05000271/LER-1986-005, :on 860426,detected Ultrasonic Indications Indicative of IGSCC in Iconel 182 Weld Butter of Both Core Spray Nozzles During Exams Performed Per IE Info Notice 84-41.Weld Overlays Will Be Applied to Nozzles + (ML20198E893)
- ML20198E896 + (ML20198E896)
- ML20198E898 + (ML20198E898)
- ML20198E899 + (ML20198E899)
- 05000366/LER-1986-011-01, :on 860425,component Failures Prevented 4 H Grab Sampling.Iodine/Noble Gas Sample Sys Inoperable Due to Blown Power Fuse.Particulate Sample Sys Inoperable Due to Sys Vacuum Pump Failure + (ML20198E901)