Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A98056, Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology + (ML20198D575)
- ML20198D576 + (ML20198D576)
- A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With + (ML20198D577)
- ML20198D580 + (ML20198D580)
- ML20198D581 + (ML20198D581)
- ML20198D585 + (ML20198D585)
- ML20198D589 + (ML20198D589)
- ML20198D593 + (ML20198D593)
- ML20198D595 + (ML20198D595)
- IR 05000333/1992003 + (ML20198D597)
- ML20198D598 + (ML20198D598)
- 05000305/LER-1986-006, :on 860420,turbine Trip & Reactor Trip Occurred.Caused by Main Feedwater Control Valve Sticking. Valve Inspected,Adjusted & Cycled to Verify Operability Prior to Restart + (ML20198D600)
- ML20198D602 + (ML20198D602)
- IR 05000352/1992014 + (ML20198D604)
- BVY-97-179, Submits Summary of Current Plans & Schedules Re Min Flow of RHR & CS Pump Issues,Per NRC Bulletin 88-04, Potential Safety Related Pump Loss + (ML20198D606)
- RC-98-0222, Monthly Operating Rept for Nov 1998 for VC Summer Nuclear Station,Unit 1.With + (ML20198D607)
- 05000323/LER-1986-013, :on 860418,limiting Condition for Operation & Action Statement 2.C of Tech Spec 3.3.1,Table 3.3-1 Not Met When Quadrant Power Tilt Ratio Determination Could Not Be Performed in Time + (ML20198D609)
- ML20198D612 + (ML20198D612)
- HL-5717, Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC + (ML20198D614)
- ML20198D615 + (ML20198D615)
- NRC-98-0153, Monthly Operating Rept for Nov 1998 for Fermi 2.With + (ML20198D617)
- ML20198D619 + (ML20198D619)
- ML20198D621 + (ML20198D621)
- ML20198D624 + (ML20198D624)
- ML20198D627 + (ML20198D627)
- ML20198D630 + (ML20198D630)
- IR 05000382/1998011 + (ML20198D631)
- ML20198D632 + (ML20198D632)
- ML20198D636 + (ML20198D636)
- ML20198D637 + (ML20198D637)
- 05000414/LER-1986-003-04, :on 860416,steam Generator 2A hi-hi Level ESF Actuation Occurred,Causing Feedwater Isolation.Caused by Spurious Signals & Defective Procedure.Feedwater Isolation Reset + (ML20198D638)
- LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With + (ML20198D639)
- ML20198D640 + (ML20198D640)
- IR 05000219/1992002 + (ML20198D641)
- ML20198D643 + (ML20198D643)
- ML20198D647 + (ML20198D647)
- 05000483/LER-1986-014, :on 860419 & 22,while in Mode 1,containment Purge & Control Room Ventilation Isolations Occurred.Caused by Spikes Received on Containment Purge Sys Noble Gas Activity Monitors + (ML20198D649)
- ML20198D651 + (ML20198D651)
- ML20198D652 + (ML20198D652)
- ML20198D653 + (ML20198D653)
- 05000366/LER-1998-005-04, :on 981117,missed TS Surveillance Was Noted. Caused by Administrative Error.Changed Manner in Which Surveillance Database Updates Are Initiated,Tracked & Implemented.With + (ML20198D654)
- L-98-230, Forwards Typed,Final TS Pages for LARs 246 & 116,consisting of Changes Due to Pagination,Changes Incorporated by Previous Amends & Correction of Typos + (ML20198D657)
- ML20198D659 + (ML20198D659)
- ML20198D662 + (ML20198D662)
- ML20198D663 + (ML20198D663)
- ML20198D664 + (ML20198D664)
- ML20198D665 + (ML20198D665)
- IR 05000309/1992001 + (ML20198D669)
- ML20198D671 + (ML20198D671)
- IR 05000826/2009027 + (ML20198D676)
- IR 05000440/1992007 + (ML20198D677)