Partially Withheld Assessment of Allegation AQ-20 to Allegation Category Qa/Qc 7, QA Implementation Re Release of Vendor Components W/Documented Defects to Site by QA Mgt
ML20198D653
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/07/1985
From: Wenczel V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To:
Shared Package
ML20198C597 List: ... further results
References
FOIA-85-59, FOIA-85-89 NUDOCS 8605230344
Download: ML20198D653 (2)


Text

- _ _.

1.

Allegation Category:

QA/QC 7, QA Implementation 2.

Allegation Number:

AQ-20 3.

Characterization:

It is alleged that vendor components with documented defects were released for shipment to the site by QA management.

4.

Assessment of Safety Significance:

The NRC Technical Review Team (TRT) identified the cited components as moment restraints.

By interviewing of Comanche Peak Steam Electric Station (CPSES) personnel and reviewing a Region IV inspection report and moment restraint inspection and nonconfor-mance reports (NCRs) with supporting documentation, the TRT found the fol-lowing.

In June 1980, fabrication of the moment restraints was reportedly completed by Chicago Bridge and Iron (CB&I) and they were ready for ship-ment to CPSES.

Brown and Root (B&R) required a source inspection of the moment restraints to be performed prior to shipment. The inspection, con-ducted on July 22-23, 1980, identified unacceptable conditions which re-quired corrective action before shipment would be approved by B&R. On August 18, 1980, a CB&I response stated that the unsuitable weld surface conditions would not interfere with proper interpretation of nondestruc-tive examinations of the restraints.

CB&I's response took exception to the inspection findings and was not approved by B&R. As cost and schedule constraints came to bear cnd no acceptable corrective action was taken by CB&I, B&R QA management issued a " shipment waiver" to CB&I on September 3, 1980. The waiver released the moment restraints for shipment with known outstanding deficiencies.

This waiver did not waive any rights B&R had under the purchase agreement, including the right to reject the restraints upon discovery of deficiencies during or after their arrival at CPSES.

After thei~r arrival, the moment restraints were inspected. Those moment restraints that were not acceptable were either reworked / repaired on site or returned to CB&I for repair.

These actions were documented on NCR M-2512, dated September 22, 1980, and Texas Utilities Generating Company letter TXX-3544, dated July 19, 1982.

(NCR dispositioning for the moment restraints is also addressed in QA/QC Category 6, allegation AQ-38.)

5.

Conclusion and Staff Positions:

Based on documents reviewed, and interviews performed, the TRT determined that vendor components with documented defects were released for shipment by QA management.

However, the known defects i

were adequately documented prior to shipment.

The moment restraints were inspected after arrival at CPSES.

Noted deficiencies were dispositioned i

as either rework / repair onsite or return to vendor for repair.

These actions tock place prior to the restraints being turned over to craft personnel for installation. Accordingly, there was a controlled method in place for the identification of deficient material at the vendor and fol-lowup at the site to assure that only acceptable hardware was installed.

l l

On October 29, 1984, the TRT was notified that the alleger had declined l

to have any further contact with the NRC.

Accordingly, no closecut interview was conducted.

l j

7.

Attachments:

None.

8605230344 860512 0-235 PDR FOIA LGARDE85--89-... PDR.

References Documents:

1.

Brown & Root Inc., Power Division, Quality Assurance Procedure, Vendor Surveillance Section, Quality Surveillance Procedure, " Control of Vendor Nonconformances Procedure QSP 7.0," Rev. 3.

2.

Brown & Root construction procedure CP-QAP-18.4, Rev. O, " Vendor Qualifications and Surveillance."

3.

CPSES documentation reviewed:

(a) Purchase orders 35-1195-30448 35-1195-30418 35-1195-30442 35 2195-30396 35-1196-30585 (b) Receiving inspection reports 15379, 15331, 14673, 14638, 14176, 14370, 14255, 14690, 14674, 14955, 15863, and 14349.

(c) Nonconformance report M-2512.

(d) Audit deficiency reports G303-3.1 and G310-10.1.

4.

Region IV Report, 50-445-446/80-22.

5.

A-7 testimony, March 7, 1984.

8.

This statement prepared by:

Sd V. Wenczel,IRT Date Technical Reviewer Reviewed by:

4 o&1.#t02#

5 ~7-I5 H. Livermore, Date Group Leader Approved by:

V. Noonan, Date Project Director 0-236 m