Forwards Safety Insp Rept 50-461/85-48 on 850824-1010 & Notice of Violation.Detailed Explanation of Program Showing How 10CFR50.62 Requirements Accomplished Requested
ML20198D664
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/04/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20198D668 List:
References
NUDOCS 8511120406
Download: ML20198D664 (2)


See also: IR 05000461/1985048

Text

k,

,

-

.

Nov

4 385

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Geestner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the routine safety inspectior. conducted by Messrs. S. G. Dupont,

R. D. Lanksbury and Ms. N. Valliere of tnis office on August 24 through October 10,

1985, of activities at Clinton Power Station authorized by NRC Construction Permit

No. CPPR-137 and to the discussion of our findings with Mr. F. A. Spangenberg

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Appendix. A written response

is required.

In addition, we request that a detailed explanation of your

program showing how the 10 CFR 50.62 requirements are accomplished be

included in your response.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget ae required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Cl@SC*5.hd b:IOI0 C= * N

~

J. J. Harrison, Chief

Engineering Branch

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No.50-461/85048(DRS)

See Attached Distribution

.

!

8511120406 851104

ADOCK 0 % 4jl

PDR

i

-

-

.

as,

{>

-

p.

Illinois Power Company

2-

NOV

4 1985

'

Distribution

cc w/ enclosures:

DCS/RSB (RIDS)

Licensing Fee Managerent Branch-

Resident Inspector, kIII

Richard Hubcard

Gary N. Wright, Manager

Nuclear Facility Safety

Jean Foy, Prairie Alliance

Mark Jason, Assistant

.

Attorney General,

i

Environmental-Control Division

H. S. Taylor, Quality Assurance

Division

{

I

RIII($

RIII

R I

RI

RIII

RIIIcqffer

Valliere/# M

.$8ifu

~

Ring

J

lonski

i on

ag

/rr

pa {u

DuPon

ja

Lanksbury-

-10/31/85

g

i