Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198B596 + (ML20198B596)
- 0CAN108507, Forwards Revised NUREG-0737,Suppl 1 Integrated Implementation Plan.Status & Tasks Performed in Last 6 Months Described,Including Control Room Design Review, Reg Guide 1.97,SPDS & Emergency Operating Procedures + (ML20198B599)
- ML20198B601 + (ML20198B601)
- B11724, Application for Amend to License DPR-21,modifying Wording of Tech Specs 3.10 & 4.1.D,Table 3.1.1 & Basis 3.1 to Allow Flexibility in Disarming Control Rods by Allowing Variety of Disarming Methods + (ML20198B602)
- ML20198B604 + (ML20198B604)
- 05000298/LER-1997-017, :on 960724,plant Was Outside Design Basis. Caused by Inadequate Original Design.Outboard Valves Were de-energized in Closed Position + (ML20198B608)
- ML20198B609 + (ML20198B609)
- 05000293/LER-1997-011-02, Forwards LER 97-011-02 Re SSW Sys Single Failure Vulnerability IAW 10CFR50.73.Commitments Made within Ltr, Submitted + (ML20198B612)
- ML20198B613 + (ML20198B613)
- ML20198B615 + (ML20198B615)
- ML20198B617 + (ML20198B617)
- ML20198B618 + (ML20198B618)
- ML20198B619 + (ML20198B619)
- ML20198B620 + (ML20198B620)
- ML20198B624 + (ML20198B624)
- ML20198B626 + (ML20198B626)
- ML20198B627 + (ML20198B627)
- ML20198B630 + (ML20198B630)
- ML20198B631 + (ML20198B631)
- ML20198B632 + (ML20198B632)
- ML20198B633 + (ML20198B633)
- ML20198B637 + (ML20198B637)
- B11846, Forwards Revised Final Draft Tech Spec 3/4.6.1.5,providing Containment Air Temp Monitor Locations,Per 851018 Request. Selection of Locations Based on Orientation Re Design Air Flow Patterns.Sketch Supporting Locations Also Encl + (ML20198B639)
- ML20198B640 + (ML20198B640)
- ML20198B641 + (ML20198B641)
- ML20198B645 + (ML20198B645)
- 05000373/LER-1997-044, :on 971205,potentially Unanalyzed Condition for Automatic Depressurization Sys Accumulator Capacity,Was Identified.Caused by Lack of Design Basis Info.Determined Licensing Basis for ADS Accumulator Capacity + (ML20198B647)
- ML20198B651 + (ML20198B651)
- ML20198B652 + (ML20198B652)
- ML20198B656 + (ML20198B656)
- ML20198B658 + (ML20198B658)
- ML20198B660 + (ML20198B660)
- ML20198B664 + (ML20198B664)
- ML20198B665 + (ML20198B665)
- A05364, Forwards Addl Response to Generic Ltr 83-28,Item 1.2, Post- Trip Review:Data & Info Capabilities, Per 860415 Telcon. Status of Responses to Generic Ltr Also Encl.All Action Items Either Complete or Closed + (ML20198B666)
- PY-CEI-NRR-2344, Submits Updated Response to GL 94-02 Re long-term Solutions & Upgrade of Stability Interim Corrective Actions.New Regulatory Commitment Made by Util,Encl + (ML20198B667)
- ML20198B668 + (ML20198B668)
- ML20198B669 + (ML20198B669)
- ML20198B673 + (ML20198B673)
- ML20198B675 + (ML20198B675)
- ML20198B677 + (ML20198B677)
- ML20198B678 + (ML20198B678)
- PNO-I-86-038A, on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days + (ML20198B681)
- ML20198B682 + (ML20198B682)
- ML20198B686 + (ML20198B686)
- ML20198B687 + (ML20198B687)
- ML20198B689 + (ML20198B689)
- ML20198B693 + (ML20198B693)
- NOC-AE-000038, Submits 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (ML20198B694)
- ML20198B696 + (ML20198B696)
- ML20198B699 + (ML20198B699)