Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198A808 + (ML20198A808)
- ML20198A809 + (ML20198A809)
- ML20198A810 + (ML20198A810)
- ML20198A811 + (ML20198A811)
- ML20198A814 + (ML20198A814)
- IR 05000269/1985032 + (ML20198A816)
- 05000364/LER-1983-026-03, /03L-0:on 830602,during Auxiliary Bldg Battery Quarterly Verification,Battery Bank 2A Declared Inoperable. Caused by Decrease in Cell Voltage on Individual Cell.Top of Cell Cleaned & Cell Charged + (ML20198A820)
- ML20198A821 + (ML20198A821)
- IR 05000387/1985025 + (ML20198A822)
- ML20198A825 + (ML20198A825)
- 05000317/LER-1985-012, :on 851002,main Turbine Tripped on Erroneous Feedwater Heater 12C hi-hi Signal to Turbine Trip Circuit. Caused by Grounded Feedwater Heater Level Control Switch. Ground Control Switch Repaired + (ML20198A827)
- IR 05000327/1998010 + (ML20198A828)
- ML20198A833 + (ML20198A833)
- ML20198A834 + (ML20198A834)
- ML20198A835 + (ML20198A835)
- IR 05000456/1985041 + (ML20198A836)
- ML20198A837 + (ML20198A837)
- ML20198A839 + (ML20198A839)
- ML20198A842 + (ML20198A842)
- ML20198A843 + (ML20198A843)
- ML20198A847 + (ML20198A847)
- ML20198A848 + (ML20198A848)
- ML20198A851 + (ML20198A851)
- ML20198A853 + (ML20198A853)
- ML20198A855 + (ML20198A855)
- ML20198A856 + (ML20198A856)
- U-602890, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/97-15.Corrective Actions:Procedure CPS 1014.6, Operability Determinations Will Be Revised by 980131 + (ML20198A860)
- ML20198A862 + (ML20198A862)
- ML20198A863 + (ML20198A863)
- ML20198A864 + (ML20198A864)
- ML20198A865 + (ML20198A865)
- ML20198A869 + (ML20198A869)
- ML20198A870 + (ML20198A870)
- ML20198A871 + (ML20198A871)
- ML20198A875 + (ML20198A875)
- ML20198A877 + (ML20198A877)
- ML20198A878 + (ML20198A878)
- ML20198A879 + (ML20198A879)
- 05000528/LER-1985-046, :on 850930,continuous Fire Watch Mistakenly Discontinued for 18 Minutes While Main Steam Support Structure Fire Protection Sprinkler Sys Inoperable for Valve Repair.Cause Unknown + (ML20198A882)
- ML20198A883 + (ML20198A883)
- ML20198A884 + (ML20198A884)
- U-602891, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/97-19.Corrective Actions:Pm Tasks Will Be Revised by 980630,to Provide Direction on Proper Method of Lubricating Motor Bearings + (ML20198A885)
- ML20198A889 + (ML20198A889)
- 05000364/LER-1983-007-03, /03L-0:on 830216,containment Isolation Valve Q2E21HV8880 Declared Inoperable After Failing to Operate Properly.Cause Not Determined.Inservice Test Performed & Valve Declared Operable + (ML20198A890)
- ML20198A892 + (ML20198A892)
- ML20198A893 + (ML20198A893)
- NPL-98-1020, Forwards Rev 1 to Calculation PBNP-IC-33, 4.16KV RT UV Matrix Relays Uncertainty/Setpoint Calculation. Calculation Verifies That Setpoint Calculation Provided with 980528 Submittal Is Conservative,Per 980911 RAI + (ML20198A894)
- 05000412/LER-1997-006-01, :on 971201,TS Requirements for 4.16 Kv Bus Undervoltage Trip Feeder Breaker Function ESF Response Time Were Not Met.Caused by Inadequate Relay Calibr Procedures. Recalibrated Time Delays + (ML20198A897)
- ML20198A900 + (ML20198A900)
- ML20198A901 + (ML20198A901)
- ML20198A902 + (ML20198A902)