- ee** March 20,1997 Mr. Richard Yoshimura Manager, Transportation Systems Analysis Department 6641 MS 0718 Sindia National Laboratory P.O. Box 5800 Albuquerque !#I 87185
SUBJECT:
N00lFICATION TO PRR)ECT ENTITLED " REVALIDATION OF NUREG 0170, SPENT FUEL SHIPMElff RISK ESTIMATES
- Job Code 4160 bear Mr. Yoshimura:
This lettor 45 to request a preliminary proposai for perfernance of the modification to Job Code J5160 " Revalidation of NUREG-0170, Spent Fuel Shipment Risk Estimates" for the Nuclear Regulatory Commission. Office of Nuclear Material Safety and Safeguards. The enclosed modification details the required work and should be used as the basis for proposal preparation.
Cost Proposal
'ne task order proposal should contain the cost information as is required on the NRC Fonn 189, " DOE Laboratory Project and Cost Proposal for NRC Work."
A spending plan should also be submitted as part of your cost prcposal.
Guidance for completion of the plan is contained in the instructions portion of the NRC form 189.
Technical Proposal Content As a minimum the technical proposal must contain the following:
a) A discussion to substantiate the laboratory's understanding of the scope of work, b) A discussion of the laboratory's technical approach to meet the project's objective, c) A discussion of the experience and capabilities of key personnel and the laboratory in performing similar work, h
g 10 g 7 971217 RESNIKO97-417 PDR
~ -
?
R. Yoshimura 2 d) Identification of key personnel and the number of staff hours that will be comitted to completion of work. Resumes for key personnel must be included.
e) Identification of administrative support personnel and/or facilities needed to assist professional pe;sonnel in completing work, f) A discussion of any potential organizational conflict of interest issues, g) A discussion of anticipated problem areas or deviations from the l NRC's 50W. l l
This request is not an authorization to begin work. Authorization will be provided via a NRC Form 173 " Standard Order for DOE Work."
Work under this project is anticipn ed to be unclassified.
The proposal should be faned to the NRC W thin 30 days. Please advise the individual mentioned belw by telephone if thcre is any difficulty in meeting this due date.
The proposal should be sent in an original and two copies to the U.S. Nuclear Regulatory Comission. ATTN: Mr. David Tiktinsky Office of Nuclear Material Safety and Safeguards. Mail Stop T-8 A 23. Washington. DC 20555.
Questions cont.erning this request should be addressed to David Tiktin.,ky on (301) 415-7818. Thank you for assistance in this matter.
Sincerely, original signed by:
John J. Surmeier John J. Linehan, Director
/for/
Program Management. Policy Development l and Analysis Staff. NHSS
Enclosure:
As stated cc: J. Sprung. SNL B. Hawkins. SNL Distribution: AM8 NMSS r/f EHecman l
OFC RMB E RMB N SFP0 E PMDd, E NAME DTiktinsky* 0Mattia* JCook*/McDarby* JLi[e[
1 DATE 3/ /97 3/ /97 3/ /97 3/10/97 C = COVER E = COVER & ENCLOSURE N = NO COPY
- see previous concurrence
U R. Yoshimura will be comitted to coupletion of work. Resumes for ey personnel must be included.
e) Identification of administrative support pe onnel and/or facilities needed to assist professional personnel ta leting work, f) A discussion of any potential organ tional conflict of interest issues, g) A discussion of anticipated p areas or deviations from the NRC's S0W.
This request is not an authorizat n to begin work. Authorization will be provided via a NRC form 173. "5 ndard Order for DOE Work."
Work under this project is ticipated to be unclassified.
The proposal should axed to the NRC within 30 days. Please advise the individual menti low by telephone if there is any difficulty in meeting this due date.
The proposal s ld be sent in an original and two copies to the U.S. Nuclear Regulatory C ission. ATTN: Mr. David Tiktinsky Office of Nuclear Material Safety and afeguards Mail Stop T 8-A 23. Washington DC 20555.
Questic concerning this request should be addressed to David Tiktinsky on (301) 15 7818. Thank you for assistance in this matter.
, Sincerely.
John J. Linehan. Direc.or Program Management. Policy Development and Analysis Staff. NHSS
Enclosure:
As stated cc: J. Sprung. SNL B. Hawkins. SNL Distribution: JS160 NHSS r/f EHeuman OFC RMB,,y E RM L N SFP0. E RMS. E NAME DTNnsky K) Mat (1a YooT k mma umse mum a man OFC PCA N NAE JLirletian DATE 3/ /97 C = COVER E = COVER & ENCLOSURE N = NO COPY
.-- - _- _ = _ _- ._
.Q:
Project
Title:
Modificatir to Revalidation of NUREG-0170 Spent. Fuel Shipment f,.a Estimates Job Code: J5160 Contractor: SNL B&R No.: 65015221000 Project Manager: David Tiktinsky Technical Monitor: John Cook Background! ,
The program plan for the " Revalidation of NUREG 0170 Spent fuel Shipment Risk-Estimates * [under contract to Sandia National Laboratory (SNL)] for anticipated trt.nsportation to storage and disposal facilities requires that characteristic data for the routes over which these shipments might take place be developed. This data is usually developed by performing HIGHWAY code calculations for truck routes, and INTERLINE code calculations for rail route:
the results cre then used as input for the RADTRAN transportation risk assessment code, Because there are a great many possible routes from operating reactor sites to the set of possible interim and permanent, repository locations the revalidation program specified that the characteristics of these routes would be developed from histograms of route data drawn from previous studies, principally from (Argonne National Laboratory's) ANL's Multi-Purpose Canister Environmental Impact Statement ANL has now stated that the HIGHWAY and INTERLINE data used in that study can not be provided to SNL, Therefore, SNL must develop the needed data by combining route data developed for prior SNL transportation risk studies with new route data developed by performing HIGHWAY and INTERLINE calculations.
Commercial power reactors are presently operating at 73 different sites in the continental United States,uThe location of storage or disysal facilities.
l however, is not yet established.
Work to be nerformed:
To characterize full range of possible spent fuel shipment road and rail routes, the contractor shall select multiple geographical locations for i storage and disposal facilities so as to represent the majority of the domestic the road ed rail system, it is estimated that several hundred route l
calculations must be performed, The output of these calculations shall be combined with the route data available from prior SNL tr4nsportation risk studies. The combined data shall also be used to develop histograms of route characteristics (route lengths: urban, suburban, and rural route fractions, population dens' ties, and accident rates). The data and the data development l
Y ~
e-_._ _ _ _ _ _ *---__
. . _ _ ~ _ .. . _- - __ _ _ _ . . _ _ _ _
N i
piecess must be subjected to Quality Assurance procedures as contained in the original Statement of Work.
Deliverables:
The input data derived from this task shall be used-in RADTRAN calculations performed for this contract. A detailed description of results of this data analysis-shall be included as an attachrr mt to the Monthly Letter Status i Report for the revalidation program.
Schedule:
Six weeks from date of task intiation.
Estimated Laval of Effort!
Six staff weeks.
-s-- -m. 4- - p 4-., L.
== i a
s
.9
! ,,t,-
$ t;W* f s E5 sr h, %
g a
e- r rj:t s ;
, as -
_i e I a a s is s :
e s* c *
- 5
- gj 8 8
[ s is Ei 3
i Wag '
s,=
i
- a 8m a n-
=
f Egg e
lei gl '
"E8s a .v er -
! i w" 2s,?gn x .
t : -a 5 -r s y I : "s w .5S$ ~
g
.~ !! : e s 2 3
>m * *
- !ild t g %
Era r; gW % EB E
~: 0 3CC Sg $l ! *3 g ~f ~E<
9 i 8' "*,
!g,. g f. ~ g< -
s !.
g ..
E-i e
!.g! s - -
8
.s, "s-
- s .
L :
gs E 5 4 I : go. g g 3'ss5 L. <: r 5
fh 8 EE v
'55 ! - I' :i !< !
=ry
=
an ce i El ; .
u Wh. :
a sa l k o Tf -
ga n 4 o
~
E : :
d g a g gt a
- = W
--I
- ^ g J 25 M bE : W "
sg r y!w 2 EM3 Es i i, %
gN : ! o a g
g; -
g;gS
- ' . a :
Bf g (_
$ E$w $
$ tA
!!j ^r !!s! .
2 a a, E!9 "5
$$ 0 I: ag El j; list :; ..
E 3
=l0
- a E
v5 ac.:
s g
a O n.t y m
g !
.:e
!v .
sa .ss gs: = *:a ar 8 4
, 5," Io gr< . .$ 3:_ ,as -
e.s.
t'
- - -