Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197D085 + (ML20197D085)
- SVP-97-277, Submits Six Commitments Made by Plant at pre-decisional Enforcement Conference Held on 971126 at Region III Headquarters + (ML20197D086)
- ML20197D089 + (ML20197D089)
- ML20197D090 + (ML20197D090)
- ML20197D096 + (ML20197D096)
- ML20197D097 + (ML20197D097)
- ML20197D099 + (ML20197D099)
- ML20197D102 + (ML20197D102)
- 05000213/LER-1978-002, Forwards LER 78-002/01T-0 + (ML20197D103)
- ML20197D104 + (ML20197D104)
- ML20197D105 + (ML20197D105)
- ML20197D107 + (ML20197D107)
- ML20197D109 + (ML20197D109)
- ML20197D111 + (ML20197D111)
- ML20197D114 + (ML20197D114)
- 05000213/LER-1978-002-01, /01T-0 on 780322:during Full Series Environ Qual Test of Terminal Block/Box Combinations,Elec Degradation Was Observed on GE Co Terminal Block Type EB-25 Mounted in Aluminum Terminal Box,Due to Contact W/Aluminum Box + (ML20197D115)
- ML20197D117 + (ML20197D117)
- ML20197D118 + (ML20197D118)
- 05000304/LER-1986-012-04, :on 860408,during Periodic Test of Auxiliary Feed Pump Oil Pumps,Auxiliary Feed Pump 2B,rather than Auxiliary Feed Pump Oil Pump 2B,started.Caused by Operator Error & Inconsistent Switch Locations + (ML20197D119)
- ML20197D120 + (ML20197D120)
- ML20197D121 + (ML20197D121)
- ML20197D124 + (ML20197D124)
- ML20197D125 + (ML20197D125)
- ML20197D126 + (ML20197D126)
- ML20197D127 + (ML20197D127)
- ML20197D128 + (ML20197D128)
- ML20197D129 + (ML20197D129)
- ML20197D130 + (ML20197D130)
- ML20197D133 + (ML20197D133)
- ML20197D134 + (ML20197D134)
- IR 05000255/1986034 + (ML20197D136)
- ML20197D137 + (ML20197D137)
- 05000366/LER-1978-061, Forwards LER 78-061/03L-0 + (ML20197D138)
- ML20197D145 + (ML20197D145)
- ML20197D146 + (ML20197D146)
- ML20197D147 + (ML20197D147)
- TXX-2905, States Utils Determination That the Design of Seismic Restraint for SVC Water Pump Is Not Reportable Under 10CFR50-55(e) as a Design Deficiency.Supporting Records Are Available at the CPSES Site + (ML20197D149)
- ML20197D150 + (ML20197D150)
- ML20197D152 + (ML20197D152)
- ML20197D153 + (ML20197D153)
- 05000250/LER-1985-020, :on 850723,possible Inability of MSIVs to Close During Uncontrolled Steam Release Discovered.Caused by Deficiency in MSIVs Built by Ametek,Inc & Designed by Bechtel.Design Will Be Modified Per FSAR + (ML20197D154)
- ML20197D158 + (ML20197D158)
- ML20197D159 + (ML20197D159)
- IA-78-296, Responds to 781025 Ltr Stating That Copy of Safety Eval Rept & Final Safety Analysis Rept Are Available at Univ of New Orleans Library + (ML20197D160)
- ML20197D160 + (ML20197D160)
- 05000366/LER-1978-061-03, /03L-0 on 781029:during Scram 2-78-14,2B21-NO24A Instru Switch 2 Failed to Actuate at Setpoint 111.6+/-3.6 Inches.Cause:Magnet on 2 Switch Had Metal Shavings on It. Instru Cover Was Loose & Shavings Entered Instru + (ML20197D165)
- ML20197D171 + (ML20197D171)
- ML20197D172 + (ML20197D172)
- ML20197D174 + (ML20197D174)
- ML20197D175 + (ML20197D175)
- ML20197D178 + (ML20197D178)