Recommends Safety Eval & Cost Benefit Analysis Branches Not Review Rev 1 to the Dar Submitted in Feb 1978 But Rather Adjust Their Review Schedule to Reflect Anticipated Submittal of Rev 2 of Dar in Mar 1979
ML20197D127
Person / Time
Site: Washington Public Power Supply System
Issue date: 10/27/1978
From: Lynch M
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
CON-WNP-1170 NUDOCS 7811210387
Download: ML20197D127 (3)


Text

G e

I e

D)[tribution:

trentral Files OCT 2 71978 s.

LWR #4 File MEMORANDUM FOR:

Steven A. Varga, Chief, Light Water Reactors Branch No. 4, DPM i

FROM:

M. D. Lynch, Project Manager, Light Water Reactors Branch No. 4, DPM l

SUBJECT:

~ ESTIMATED SUBMITTAL DATES FOR REVISION 2 OF THE DAR AND THE SRV FORCING FUNCTION In the memo to you dated Oc'tober'13, 1978, W. R.-Butler i

indicated that the CSB review did not include consideration of the information contained in Revision 1 of the DAR which was submitted in February 1978.

Subsequently, I was inforned by telephone on October 17th, by Keener Earle that UPPSS intended to submit Revision 2 to the DAR in March 1979.

This information was officially transmitted to the staff in the meeting with WPPSS on October 10th, as shown on.

However, I believe that the date of the submittal of the next revision to the DAR was not specifically recognized by the staff at the time of the meeting to be a slip in the previous schedule for submittal of the " ark II dynamic pool loads.

In discussing this slip with Mr. Earle, he indicated that WPPSS has chosen to delay the submittal of the rev.ised DAR i

as a result of the exceptions that WPPSS intends to take to the Lead Plant Program (LPP) acceptance criteria which the staff sent to Zimmer, LaSalle and Shoreham in late September 1978.

There fore, I have recommended to both CSB (Butler) and SEB (Hofmeyer) that these branches should not review Revision 1 to the DAR submitted in February 1978 but, rather, that they should adjust their review schedules to reflect the anticipated submittal'of Revision 2 of the l

DAR in March-1979.

j In the same telephone conversation with K. Earle of WPPSS, I was also. advised that WPPSS will not submit its forcing i

function for its four-arm GE quencher device until May 1979.

l This information was also presented at~the October 10th l

meeting.

(Refer to Attachment 1.)

~

Inasmuch as the' staff established the CSB review schedule for the " ark II dynamic pool loads at the May 18, 1978, meeting with WPPSS based on the assumption that all information

@ p v o s n.&

&f-j i

rac comu na <9 76> uncu o24.

l

s

' Steven A..Varga #

7 relating to the dynamic pool loads would be submitted by January 1979, the submittal dates for the revised DAR and the SRV forcing function-could have a significant and adverse impact on the completion date of our review.

I recommend that we vigorously explore the timely submittal of the proposed Mark II dynamic pool loads for WNP-2.at the forthcoming technical meeting with WPPSS,. tentatively j

scheduled for early November.

l Original signed by:

. :.-v 1.

M.. D. Lynch, Proj ect Manager Light Water Reactors Branch No. 4 Division of Pro. ject Management l

~cc:

R. Boyd R. Mattson D. Ross D. Vassallo a

J. Knight'

^ R. Tedesco l

W. Butler C. Hofmeyer i

M. Lynch l

l

~

i l

i t

i l

,0.h,

}..k.

..k}f.

.k.h..

oprica p

.....no n.n.

n

. n..

o

..." a

.DLynch..t1h..

..S...

sumaaess e 7

-. ~~

1.0/2U.7.8..

.10..L..,. 6...

om me aun.<,.m meuom

~,... -. ' " ~ - " -

DCT 2 71373 FUTURE ACTIONS & PRCGPAMS Consecutive SRV Actuation Hardware Mitigation Decision October 78 Reassessment Considering NRC Interim Acceptance Criteria to be Completed (in DAR Rev. 2)

March 79*

DAR Rev. 2 to be Submitted March 79 with Improved Chugging Load Definition Accounting for FSI without SRV Load Definition for Evaluating Equipment &

Piping Response Caorso Single Valve Test Results Reported 1st Qtr 79 (Mark II Owners Group Activity)

SRV Loads for Demonstration of Equipment and Piping Adequacy Available for NRC Review May 79 f

  • Full ramification of criteria may affect this date D

-v,-

r a.

.i DEC22 Big Docket 'los. 50-460 and 50-513 l

f1E'109Atl0lP1 FOR: Olan D. Parr, Chief, Licht Water Peactors Branch flo.1, OP'1 i

FR0!!:

Anthony Bournia, Project "anager, Light Water Reactors l

Branch flo. 3, OPri SilBJECT:

FORTHC0f!I!!G !1EETING WITli WASill'IGT0?! PUBLIC PO'4ER SUPDLY SYSTEP1 C0!!CER!!!!!G QUALIFYI!!G EQUIP!'E*IT D%TE *i TI"E:

January 17, 1979 9:00 A51 LOCATID'l:

P-500 Dhillips Buildino Bethesda, "aryland PtJRPOSE:

To discuss guidelines with respect to cualifying ecutoment for !!?PSS plants.

0%RTICIPAtlTS:

'IRC R. Satterfield, R. Bosnak, F. Dosa, C. !! iller, L. Soffer, F. Cherney, R. Scholl, A. Szukiewicz, J.

.nlinski.

D. Turovlin, A. Bournia l

WPPSS I

G. Sorensen, 'J.

Rhoads, St. Suloff, et al.

I

'Originalsignedbyi Anthony Bournia Anthony Bournia, Project 'fanaqer Ligitt.fater Reactors Branch "o.

3 Division of Project 'lanagement i

cc: See next paqe k b ly f/T f

...."..g..L P!1, L.H..R #3 BC LM 43:

.0B.9Enia,/,((',L,,,,,9,N.... p....

,,,,, t,c,, _,,

.v a a = = *-

12/ W

.........../. 7 812/ v t/70

.m NRC 90AM 318 (9 76) NRCM 0140 8 e a **ve===en, bene.. oerees s ere ase.,se t

ft 6

I DEC 2 21978 hr'. H. O. Strand

  • Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washin9 tai 99352 cc:

Mr. B. D. Redd-Jerome E. Sharfman United Engineers & Constructors,1:e.

Atomic Safety and 30 South 17th Street Licensing Appeal Board Philadelphia, Pennslylvania 19101 U. S. Nuclear Regulatory Commission Joseph B. Knotts, Jr., Esq.

Washington, D. C.

20555 DeBevoise & Liberman Shoreham Building - Suite 700 800 15th Street, N.W.

Washington, D. C.

20005 Mr. E. G. Ward Senior Project Manager Babcock & Wilcox Company P. O. Box 1260 Lynchburg, Virginia 23505 Robert Lazo, Esq., Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission j

Washington, D. C.

20555 Ur. Donald P. deSylva Associate Professor of Marine Science Rosenthiel School of Marine and Atmospheric Science University of Miami Miami, Florida 33149 Dr. Marvin ti. Hann Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Richard S. Salzman, Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. John H. Buck Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555

r

~--

r Q-th/j)/$(3

  1. i l pnm e 1

4TC MEETINe MOTICE DISTRIB_TIO!!

U i

Gocket File J. Knight y

NRC PDR D. Ross R. Tedesco Local PDR DEC 321978 S. Pawlicki TIC LWR #3 File I. Sihweil NRR Reading K. Kniel H. Denton W. Haass E. Case T. Novak D. Crutchfield Z. Rosztoczy D. Bur.ch R. Bosnak R. Boyd Chief, ICSB D. Vassallo W. Butler D. Skovhnit F. Rosa W. Ganmill V. Moore F. Willlams P., Vollmer J. Stolz M. Ernst R. Baer R.' Denise O. Parr R. Ballard S. Varga B. Youngblood R. Clark W. Regan T. Speis G. Chipman P. Collins J. Collins C. IIeltenas W. Krcger R. Housten G.' Lear R. J. f Wttson fi. Spangler R. DeYoung V. Benarcya D. Muller J. Stcpp ACRS (16)

L. Ilulman L. Crocker H. Ornstein

11. Berkcw Project f 4 nager _ ABournia B. Faulktnberry, IE Attorney, El.D Program Support Branch IE (3)_

NRC

Participants:

SD (7)

R, Satterfield M. Rushbrook C, Miller P.eceptionist L. Soffer-L. Rubenstein F, Cherney L. Soffer R. Scholl A. Szukiewicz BCC: Applicant & Service List J. Zwolinski B, Turoylin 79010302Q

/F y

,,,,--n--....r

--nr m,

, ~ -, ~ -,,, -

m


vr--e

m i

l 1

l JAN 2 51979.

50-508, 50-509. h Docket Nos.

and 50-513 i

APPLICANT: Washington Public Power Supply System FACILITIES: Washington Public Power Supply System Nuclear Project Nos. 1, 3, 4 and 5

.i SUDJECT:

HEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEN l

TO DISCUSS ENVIRONMENTAL QUALIFICATION OF EQUIPMENT

Background

At the. request of Mr. Harold Denton, Director, NRR, a meeting was held on i

August 9,1978, with representatives of various utilities. During the meeting the utilities were informed that one of the major recurring issues during an OL review has been the issue regarding environmental qualification of equipment. This is an issue that an applicant clearly I

should have control over and the utilities represented were encouraged j

to expedite the qualification ' f their equipnent.

o As a result of the August 9,1978 meeting Washington Public Power Supply (WPPSS) requested a meeting with the staff in order to discuss guidelines relative to qualifying equipment and to allow WPPSS an opportunity to present.its plans for submitting a qualification program.

Discussion A meeting was held on January 17, 1979 with WPPSS to discuss the applicant's i

environmental qualification program for plant equipment and their plans.

for submitting information for staff consideration. WPPSS indicated that a report is in preparation for submittal to the staff in the near future which will discuss testing of samples of different equipment in the applicant's scope of design. Staff's comment, regarding this submittal, would aid WPPSS in the preparation of their final report which will be submitted with their FSAR.

In addition, WPPSS discussed its acceptance criteria for the class IE equipment. A discussion of the applicant's sed report and the acceptance criteria followed.

% Pfl*

Following the ap icant's discussion, the staff made the following comments:

(1) We commended them on their preparation of the work done thus far and stated that we appreciated the time and effort expended this early in their program.

~

ev== = *

........e...............

NBC FORM 318 (9 76) NRCM 0240

  • u.s... e== e =, ea.avene e**is e e e e es se e s e e

0 g

. JAN 2 51979 i

(2) We indi.cated that it would be beneficial to review as early as possible l

the testing environment and the basis for the selection thereof.

i (3) We suggested that the WPPSS report (only* submitting samples of equipment) be submitted as an information report. We will review the report to ascertain that the information submitted would lead to an acceptable final report to be submitted with their FSAR.

(4)

If they propose to reference a topical report in the FSAR with respect to equipment qualification they should check the status of staff's review of the topical report.

If the review is not complete, the FSAR

' review would be expedited if they would only reference pages from the i

topical report which pertain to their application only.

I Original sipd byi l

Anthony Ecurnia 1

Anthony Bournia. Project Manager Light Water Reactors Branch No. 3 Division of Project Management i

Enclosure:

l As stated t

cc w/ enclosure:

j See next page LWR #3: LPM......Lj3:BC

....p....g.

~....

..1./...M.../.7 9......

...1. /..v.J /. 7 9......

m,,.u,.c

c Mr. N. O. Strand Managing Director JAN 2 5 879 Washington Public rower Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 cc:

Mr. 8. D. Redd Jerome E. Sharfman United Engineers & Constructors, Inc.

Atomic Safety and 30 South 17th Street Licensing Appeal Board Philadelphia. Pennslylvania 19101

'U. 5. Nuclear Regulatory Commission Nicholas S. Reynolds, Esq.

Washington, D. C.

20555 DeBevoise & Liberman

'1200 Seventeenth St., N. W.

Washington, D. C.

20036 Mr. E. G. Ward Senior Project Nonager Babcock & Wilcox Company P. O. Box 1260 Lynchburg, Virginia 23505 Robert Lazo, Esq., Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. Donald P. deSylva Associate Professor of Marine Science Rosenthiel School of Marine and Atmospheric Science University of Miami Miami, Florida 33149 Dr. Marvin M. Mann Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Richard S. Salzman, Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. John H. Buck Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555

E Mr. N. O. Strand Managing Director JAN 2 51979 Washington Public Power Supply System P. O. Box 968 3000 George Washington uay Richland, Washington 99352 cc:

Nicholas S. Reynolds, Esq.

DeBevoise & Liberman 1200 Seventeenth St., N. W.

Washington, D. C.

20036 Richard Q. Quigley, Esq.

Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352

- Nicholas D. Lewis, Chairman Energy Facility Site Evaluation Council 820 East Fifth Avenue Olympia, Washington 98504 8

N 4

I 9

e

r-

=

ENCLOSURE MEETING ATTENDEES NRC B&W A. Bournia N. Burstein

  • B. Turoviin C. McPhatter
  • R. Scholl
  • H. Conrad
  • R. Satterfield
  • R. Sosnak P. Chen
  • R.

Fitzpatrick A. Ungaro J. Zwolinski R. Stephens-

  • 0. Parr UESC

,B. Murroff R. Rock l

J. Firchman l

WPPSS J. Rhoads i

W. Holle M. Solonff R. Douglas l

l

  • Part time attendance l

I

,