ML20197D089
| ML20197D089 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 09/09/1998 |
| From: | NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20197D092 | List: |
| References | |
| NUDOCS 9809150293 | |
| Download: ML20197D089 (1) | |
Text
.
T j
T ARI E 3.3.2-2 ISOLATION ACTUATION INSTRUMENTATION SETPOINTS ALLOWABLE TRIP FUNCTION TRIP SETPOINT VALUE _
i i
A. AUTOMATICINITIATION
[
1.
PRIMARY CONTAINMENT ISOLATION a.
ReactorVessel Water Level f'
1)
Low, Level 3 212.5 inches
- 111.0 inches
- 2)
Low Low, Level 2 1-50 incit_*
2-57 inches
- j 3)
Low Low Low, Level 1 1-129 inches
- 1-136 inches
- b.
Drywell Pressure - High 51.69 psig 51.89 psig c.
DELETED
[
2)
Pressure - Low 1854 psig 1834 psig 3)
Flow-High 5111 psid 5116 psid d.
DELETED i
e.
Main Steam Line Tunnel
[
A Temperature - High 565'F 570*F f.
Condenser Vacuum - Low
> 7 inches Hg vacuum
> 5.5 inches Hg vacuum 2.
SECONDARY CONTAINMENTISOLATION i
a.
Reactor Building Vent Exhaust l
Plenum Radiation - High 110 mr/hr 115 mr/hr b.
Drywell Pressure - High 11.69 psig 51.89 psig c.
Reactor Vessel Water o,S$
d.
Fuel Pool Vent Exhaust
-> -50 inches *
-> -57 inches
- i n
Level-Low Low, Level 2 084 Radiation - High 510 mr/hr 515 mr/hr
[
82 oo 3.
REACTOR WA% CLEANUP SYSTEM ISOLATION mg a.
A Flow-High 570 gpm 587.5 gpm gg oi5 b.
Heat Exchanger Area Temperature 5
- High 5149'F 5156.8"F g
c.
Heat Exchanger Area Ventilation ab AT - High
-< 33*F
-< 40.3*F l
d.
SLCS Initiation NA NA e.
Reactor Vessel Water Level-Low Low, level 2 2-50 inches
- 1-57 inches
- LA SALLE - UNIT 1 3/4 3-15 Amendment No.129
_.,