Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197C481 + (ML20197C481)
- ML20197C484 + (ML20197C484)
- ML20197C486 + (ML20197C486)
- ML20197C487 + (ML20197C487)
- ML20197C488 + (ML20197C488)
- ML20197C490 + (ML20197C490)
- ML20197C492 + (ML20197C492)
- ML20197C495 + (ML20197C495)
- ML20197C496 + (ML20197C496)
- ML20197C498 + (ML20197C498)
- IR 05000440/1978012 + (ML20197C499)
- ML20197C500 + (ML20197C500)
- ML20197C501 + (ML20197C501)
- ML20197C503 + (ML20197C503)
- ML20197C504 + (ML20197C504)
- ML20197C505 + (ML20197C505)
- L-98-176, Responds to NRC Re Violations Noted in Insp Repts 50-334/98-03 & 50-412/98-03.Corrective Actions:Cr 981236 Re SW Full Flow Surveillance Test,Was Written to Document Problem for Evaluation & Resolution Under CAP + (ML20197C506)
- ML20197C508 + (ML20197C508)
- ML20197C510 + (ML20197C510)
- ML20197C513 + (ML20197C513)
- ML20197C514 + (ML20197C514)
- ML20197C515 + (ML20197C515)
- ML20197C516 + (ML20197C516)
- B16905, Informs That Purpose of Safety Conscious Work Environ Comprehensive Plan (SCWE CP) Is to Identify Initiatives & Activities to Establish SCWE & Restructured Ecp.Plan Encl + (ML20197C517)
- ML20197C519 + (ML20197C519)
- ML20197C520 + (ML20197C520)
- ML20197C521 + (ML20197C521)
- NSD-NRC-97-5496, Forwards Response to RAI 640.150 Related to Comments on Seismic Monitoring Sys in Rev 3 of AP600 Certified Design Matl,As Requested in .Submittal Closes Open Item 6016 + (ML20197C523)
- ML20197C525 + (ML20197C525)
- ML20197C527 + (ML20197C527)
- ML20197C528 + (ML20197C528)
- ML20197C529 + (ML20197C529)
- ML20197C530 + (ML20197C530)
- ML20197C533 + (ML20197C533)
- ML20197C534 + (ML20197C534)
- ML20197C535 + (ML20197C535)
- ML20197C538 + (ML20197C538)
- ML20197C539 + (ML20197C539)
- ML20197C540 + (ML20197C540)
- 05000482/LER-1986-018, :on 860408,reactor & Turbine Trip,Main Feedwater Isolation,Auxiliary Feedwater Actuation & Steam Generator Blowdown & Sample Isolation Occurred.Caused by Personnel Error During Switchyard Calibr + (ML20197C541)
- ML20197C542 + (ML20197C542)
- ML20197C547 + (ML20197C547)
- ML20197C548 + (ML20197C548)
- NSD-NRC-97-5498, Forwards Revised Responses to RAIs 640.127,640.129,640.131 & 640.134 Related to Comments on AP600 Normal RHR Sys from Reactor Sys Branch Re Rev 3 of AP600 Certified Design Matl Including Itaac.Open Items 5881,5883,5885 & 5888,closed + (ML20197C549)
- ML20197C550 + (ML20197C550)
- ML20197C553 + (ML20197C553)
- CY-97-071, Forwards Physical Security Plan & Security Suitability, Training & Qualification Plan for Haddam Neck Plant. Exemption from Requirements of 10CFR73 Re Physical & Safeguards Contingency Requirements,Requested + (ML20197C556)
- ML20197C557 + (ML20197C557)
- ML20197C558 + (ML20197C558)
- IA-78-287, Response to FOIA Request for non-proprietary Portions of Winning Proposal Submitted in Response to NRC RFP RS-RES-78- 192 Post Licensing Studies of Socioeconomic Impacts of Nuc Pwr Station Siting.Tech Copy Encl.Payment Req for Draft + (ML20197C559)
- ML20197C559 + (ML20197C559)