ML20197C540

From kanterella
Jump to navigation Jump to search
Forwards Rev 12C to Pilgrim Nuclear Power Station Colr. Rev Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 12
ML20197C540
Person / Time
Site: Pilgrim
Issue date: 09/04/1998
From: Alexander J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197C544 List:
References
LTR.2.98.127, NUDOCS 9809140077
Download: ML20197C540 (1)


Text

i 0

10CFR50.36 Boeton E*h n*r Piigrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 September 4, 1998 BECo Ltr. 2.98.127 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293

)

License No. DPR-35 Core Operatino Limits Reports The attached revision of Pilgrim's Core Operating Limits Report (COLR) is submitted in accordance with the requirements of Pilgrim's Technical Specification 5.6.5.

Revision 12C provides cycle-specific limits for operating Pilgrim during the remainder of cycle 12. The core operating limits in COLR, Revision 12C have been established using the NRC-approved methodology provided in the references listed in COLR, Section 5.0 and in Technical Specification 5.6.5.

Should you require further information concerning COLR, Revision 12C, please contact P.

M. Kahler at (508) 830-7939..

q

!/

J. Alexander

'/

Regulatory Relations

/i Group Manager PMK/deg 298127

Attachment:

Pilgrim Nuclear Power Station Core Operating Limits Report, Revision 12C cc: Mr. Alan B. Wang, Project Manager U.S. Nuclear Regulatory Commissio Project Directorate I-3 Region i Office of Nuclear Reactor Regulation 475 Allendale Road Mail Stop: OWFN 14B20 King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission 1 White Flint North Senior Resident inspector 11555 Rockville Pike Pilgrim Nuclear Power Station Rockville, MD 20852 q

A00th

~

98o9140077 900904 PDR ADOCK 05000293 p

PDR