Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197C384 + (ML20197C384)
- ML20197C385 + (ML20197C385)
- ML20197C387 + (ML20197C387)
- 05000354/LER-1986-072, :on 861003,discovered That Reactor Bldg Exhaust Duct Radiation Monitor SP-RE-4857C Not Mounted in Operational Position.Cause Undetermined.Monitor Installed in Operational Position + (ML20197C389)
- ML20197C390 + (ML20197C390)
- ML20197C391 + (ML20197C391)
- ML20197C393 + (ML20197C393)
- ML20197C394 + (ML20197C394)
- ML20197C397 + (ML20197C397)
- ML20197C398 + (ML20197C398)
- PY-CEI-NRR-2241, Responds to NRC 971118 NOV & Proposed Imposition of Civil Penalty - $100,000.Corrective Actions:Isolate/Operate Solenoid Valves Replaced & Turbine Control Sys Evaluated & Found Unaffected + (ML20197C399)
- 05000354/LER-1986-076, :on 861005,inadvertent Automatic Start of Emergency Diesel Generator B Occurred.Cause Undetermined. Start Signals Will Be Monitored Continuously for 90 Day Period Utilizing Strip Chart Recorders + (ML20197C405)
- RBG-24582, Special Rept:On 860923,Div I Diesel Generator Failed.Caused by Fatigue Cracking & Tension Failure of Cylinder Fuel Injection Pump 2.All Capscrews Retorqued,Checked & Found within Acceptable Range + (ML20197C408)
- ML20197C409 + (ML20197C409)
- ML20197C412 + (ML20197C412)
- ML20197C413 + (ML20197C413)
- DCL-86-312, Rev 1 to Special Rept SR 85-09:on 851223,w/unit in Mode 1, Diesel Generator Failed to Start During Performance of Surveillance Test.Caused by Dc Converter Failing to Operate Manually.Converter Replaced + (ML20197C414)
- ML20197C417 + (ML20197C417)
- NPL-97-0794, Provides Revised Response to GL 96-06, Assurance of Equipment Operability & Containmnt Integrity During Design Basis Accident Conditions, as Suggested in 971104 & 13 Ltrs + (ML20197C418)
- ML20197C419 + (ML20197C419)
- ML20197C420 + (ML20197C420)
- PNO-V-93-007, on 930211,patient Forcibly Removed Cervical Applicator Containing Four Cs-137 Sources Totalling 130 Mci. RSO Does Not Believe Any Member of Medical Staff Received Exposure in Excess of Regulatory Limits + (ML20197C421)
- ML20197C423 + (ML20197C423)
- ML20197C424 + (ML20197C424)
- ML20197C425 + (ML20197C425)
- ML20197C427 + (ML20197C427)
- ML20197C428 + (ML20197C428)
- ML20197C430 + (ML20197C430)
- ML20197C431 + (ML20197C431)
- ML20197C433 + (ML20197C433)
- ML20197C436 + (ML20197C436)
- ML20197C437 + (ML20197C437)
- ML20197C438 + (ML20197C438)
- ML20197C440 + (ML20197C440)
- ML20197C447 + (ML20197C447)
- NPL-97-0803, Provides Status Update on Program Activities & Revises Action Plan Commitments & Completion Dates Previously Submitted in Re Verification of Seismic Class Piping Sys Interfaces + (ML20197C451)
- ML20197C452 + (ML20197C452)
- ML20197C453 + (ML20197C453)
- ML20197C454 + (ML20197C454)
- ML20197C455 + (ML20197C455)
- ML20197C459 + (ML20197C459)
- ML20197C462 + (ML20197C462)
- ML20197C465 + (ML20197C465)
- ML20197C466 + (ML20197C466)
- NPL-97-0787, Provides Outline to Ongoing Project to Review & Update Plant IST Program.Attachment Defines Scope of Program Improvement Project,Process for Handling & Resolving Discrepancies & Planned Project Schedule,Per NUREG-1482 + (ML20197C468)
- ML20197C472 + (ML20197C472)
- ML20197C474 + (ML20197C474)
- ML20197C477 + (ML20197C477)
- ML20197C479 + (ML20197C479)
- ML20197C480 + (ML20197C480)
- ML20197C481 + (ML20197C481)