Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197B771 + (ML20197B771)
- ML20197B777 + (ML20197B777)
- ML20197B780 + (ML20197B780)
- ML20197B781 + (ML20197B781)
- ML20197B782 + (ML20197B782)
- ML20197B783 + (ML20197B783)
- 05000413/LER-1985-042, :on 850616,during Mode 1,nuclear Instrumentation High Flux Rate Power Range Reactor Trip Occurred.Cause Undetermined.Power Range Channels Reset. Equipment Realigned + (ML20197B784)
- ML20197B788 + (ML20197B788)
- ML20197B789 + (ML20197B789)
- ML20197B792 + (ML20197B792)
- ML20197B795 + (ML20197B795)
- ML20197B796 + (ML20197B796)
- ML20197B797 + (ML20197B797)
- ML20197B799 + (ML20197B799)
- IR 05000344/1986003 + (ML20197B800)
- ML20197B801 + (ML20197B801)
- ML20197B802 + (ML20197B802)
- ML20197B803 + (ML20197B803)
- B11409, Responds to IE Bulletin 80-06, ESF Reset Control. Trip Signal to Containment Air Activity Pump & Containment Sump Pump Provided.Removal of Safety Injection Actuation Signals from RHR Valves Being Evaluated + (ML20197B804)
- ML20197B807 + (ML20197B807)
- ML20197B809 + (ML20197B809)
- ML20197B810 + (ML20197B810)
- 05000277/LER-1986-012-01, :on 860413,partial Group I & II Isolations Occurred Due to Loss of Power to E-22 & E-23 4 Kv Emergency Busses.Caused by Failed Speed Switch Device on E-2 Diesel. Switch Replaced + (ML20197B812)
- ML20197B813 + (ML20197B813)
- ML20197B815 + (ML20197B815)
- ML20197B818 + (ML20197B818)
- ML20197B819 + (ML20197B819)
- ML20197B820 + (ML20197B820)
- IR 015000019/1997005 + (ML20197B821)
- ML20197B822 + (ML20197B822)
- IR 05000298/1978015 + (ML20197B824)
- ML20197B825 + (ML20197B825)
- ML20197B827 + (ML20197B827)
- TXX-4786, Forwards Addl Info on Comanche Peak Response Team Results Repts for Isaps I.a.4,I.b.3,II.b,III.d & VII.b.2 Re Fire Protection,In Response to 860428 Request + (ML20197B830)
- ML20197B832 + (ML20197B832)
- ML20197B833 + (ML20197B833)
- ML20197B834 + (ML20197B834)
- ML20197B837 + (ML20197B837)
- ML20197B840 + (ML20197B840)
- ML20197B841 + (ML20197B841)
- IR 05000313/1997201 + (ML20197B842)
- 05000255/LER-1986-016-01, :on 860310,LPSI Pump Inadvertently Started. Caused by Closure at Corresponding Pair of Contacts on DBA Sequencer During Cleaning.Precautionary Note Added to Contact Closure Maint Procedure + (ML20197B844)
- ML20197B846 + (ML20197B846)
- ML20197B847 + (ML20197B847)
- ML20197B849 + (ML20197B849)
- BSEP-97-0506, Suppls to 961101 Application for Amend to TS to Allow Full Implementation of BWROG Enhanced Option I-A Reactor Stability long-term Solution.Suppl Expands Note in LCO 3.3.1.1,Table 3.3.1-1 + (ML20197B850)
- ML20197B851 + (ML20197B851)
- 05000323/LER-1986-012, :on 860409,automatic Reactor & Turbine Trip Occurred Due to Low Steam Generator Level Coincident W/Steam Flow/Feed Flow Mismatch.Caused by Failure of Thrust Bearing Detector Probe.Probe Replaced + (ML20197B852)
- ML20197B853 + (ML20197B853)
- ML20197B854 + (ML20197B854)
- ML20197B856 + (ML20197B856)