Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196B357 + (ML20196B357)
- ML20196B358 + (ML20196B358)
- ML20196B363 + (ML20196B363)
- ML20196B367 + (ML20196B367)
- PNO-I-97-079, on 971202,discovered That Paint Gun Nozzle Containing 1.2 Mci of Po-210 in Sealed Source Was Lost or Stolen.Conducted Interviews of Plant Personnel & Searched Area.Will Submit Written Rept to NRC within 30 Days + (ML20196B370)
- ML20196B371 + (ML20196B371)
- ML20196B372 + (ML20196B372)
- ML20196B374 + (ML20196B374)
- ML20196B376 + (ML20196B376)
- ML20196B379 + (ML20196B379)
- ML20196B380 + (ML20196B380)
- ML20196B381 + (ML20196B381)
- ML20196B382 + (ML20196B382)
- ML20196B383 + (ML20196B383)
- ML20196B384 + (ML20196B384)
- ML20196B385 + (ML20196B385)
- ML20196B386 + (ML20196B386)
- 05000454/LER-1988-010-08, :on 881105,safety Injection Accumulator Fill Line Break Due to Fatigue Requiring Plant Shutdown Per Tech Specs.Caused by Fatigue Induced Cracking.Accumulator Fill Lines Dye Penetrant Insp.Flawed Pipes Replaced + (ML20196B387)
- ML20196B388 + (ML20196B388)
- ML20196B389 + (ML20196B389)
- PY-CEI-NRR-0940, Forwards Eighth Quarterly Rept CEI Seismic Monitoring Network for Jul-Sept 1988, for CEI Operated Micro-net, Monitoring Area in Vicinity of Two Waste Injection Wells About 3 Miles South of Plant Site + (ML20196B390)
- ML20196B392 + (ML20196B392)
- ML20196B394 + (ML20196B394)
- ML20196B395 + (ML20196B395)
- ML20196B396 + (ML20196B396)
- ML20196B397 + (ML20196B397)
- ML20196B398 + (ML20196B398)
- ML20196B401 + (ML20196B401)
- ML20196B402 + (ML20196B402)
- ML20196B403 + (ML20196B403)
- 0CAN119801, Application for Amends to Licenses DPR-51 & NPF-6, Implementing Consolidated EOI QA Plan Manual Submitted on 980430 & Approved by NRC in 981106 Se.Changes Also Clarify Responsibilities on STA Position on Shift + (ML20196B404)
- W3P88-1229, Forwards Response Re Violations Noted in Insp Rept 50-382/88-11.Corrective Actions:Qa Revised QAP-012,effective 880615,to Clarify Requirement That All Quality Notices to Be Transmitted to Licensing + (ML20196B407)
- ML20196B409 + (ML20196B409)
- ML20196B410 + (ML20196B410)
- ML20196B411 + (ML20196B411)
- ML20196B413 + (ML20196B413)
- ML20196B415 + (ML20196B415)
- ML20196B416 + (ML20196B416)
- 05000282/LER-1998-016, :on 981029,negative Flux Rate RT Occurred Upon CR Insertion After Failure of CRD Cable.Caused by Internal Short Circuit Developing in CRDM Patch Cables at Reactor Head Connector.Replaced CRDM Patch Cables.With + (ML20196B417)
- ML20196B418 + (ML20196B418)
- ML20196B419 + (ML20196B419)
- ML20196B420 + (ML20196B420)
- ML20196B422 + (ML20196B422)
- ML20196B425 + (ML20196B425)
- ML20196B426 + (ML20196B426)
- ML20196B427 + (ML20196B427)
- ML20196B429 + (ML20196B429)
- ML20196B430 + (ML20196B430)
- IR 05000333/1988022 + (ML20196B432)
- ML20196B433 + (ML20196B433)
- ML20196B434 + (ML20196B434)