Text
._
.,m.
.p
4
,
_m
. . .
_
.
41.I
-JUN 2 41988
1
l
In Reply Refer To:
Docket:
50-298/88-14
.
,
'
'
. Nebraska Public Power District
'
ATTN:' -George A. Trevors
-
.
Division Manager - Nuclear Support
P.O. Box 499
Columbus, NE
68601
Gentlemen:
This refers to the inspection conducted by Messrs. W. R. Bennett, R. E.
Farrell, and E. A. Plettner of this office during the period April 16 .through
May 31, 1988, of activities authorized by NRC Operating License DPR-46 for the
Cooper Nuclear Station and to the discussion of our findings with Mr. G; R.
Horn and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included allegation followup, operational
safety verification, monthly surveillance and.mcintenance observations, ESF
walkdown, refueling, radiological protection, and security. Within these
areas, the inspection consisted of selective examination of procedures and -
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed insp'ection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
theseviolations,inwriting,ulesofPractice,"Part2, Title 10,Codeof
in accordance with the provisions of
'
Section 2.201 of the NRC's 'R
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 3 of the enclosed inspection report.
The response directed by.this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
,Ah
d
- RI:RIV
- SRI:RIV
- SRI:RIV
- AC
- C:DRP/C
0:0
EAPlettner/sn WRBennett
REFarrell
MEmerson EJHoller
LXallan
/ /88
/ /88
/ /88
/ /88
/ /88
(,/tM88
- Previously concurred.
I\\
8806300266 880624
{DR
ADOCK 05000298
.,
. .
-.
i
1
.
-
'
.s,
,
Nebra'ska Public Power District
-2-
,
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
/s{
L. J. Callan, Director
DivisionofReactorProjects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/88-14
cc w/ enclosures:
Guy R. Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
e
P.O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- NRC Resident Inspector
R. D. Martin, RA
- Section Chief (DRP/C)
- Lisa Shea, RM/ALF
RPSB-DRSS
- MIS System
- NRC RIV File
- ProjectEngineer,DRP/C
- RSTS Operator
- W. Long, NRR Project Manager
- R. Hall
- DRS
- DRP
- J.
B. Baird
- R.E.Farrell, SRI
- w/766
,