ML20196B398

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-298/88-14 on 880416-0531 & Notice of Violation.Actions Taken W/Regard to Previously Identified Insp Findings Also Examined & Addressed in Paragraph 3 of Rept
ML20196B398
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/24/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20196B405 List:
References
NUDOCS 8806300266
Download: ML20196B398 (2)


See also: IR 05000298/1988014

Text

, _m

._ .,m.

.p 4 . . . _ .

41.I -JUN 2 41988 1

l

l

In Reply Refer To: , .

Docket: 50-298/88-14 '

'

'

. Nebraska Public Power District

ATTN:' -George A. Trevors

-

. Division Manager - Nuclear Support

P.O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Messrs. W. R. Bennett, R. E.

Farrell, and E. A. Plettner of this office during the period April 16 .through

May 31, 1988, of activities authorized by NRC Operating License DPR-46 for the

Cooper Nuclear Station and to the discussion of our findings with Mr. G; R.

Horn and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included allegation followup, operational

safety verification, monthly surveillance and.mcintenance observations, ESF

walkdown, refueling, radiological protection, and security. Within these

areas, the inspection consisted of selective examination of procedures and -

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed insp'ection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

'

in accordance with the provisions of

theseviolations,inwriting,ulesofPractice,"Part2,

Section 2.201 of the NRC's 'R Title 10,Codeof

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed inspection report.

The response directed by.this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

,

  • RI:RIV * SRI:RIV * SRI:RIV *AC *C:DRP/C 0:0

Ah d

EAPlettner/sn WRBennett REFarrell MEmerson EJHoller LXallan

/ /88 / /88 / /88 / /88 / /88 (,/tM88

  • Previously concurred.

I\

8806300266 880624

{DR ADOCK 05000298

DCD

.,

i  ;

1

. l

- '

.s, ,

I

Nebra'ska Public Power District -2-

,

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

/s{

L. J. Callan, Director

DivisionofReactorProjects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-298/88-14

cc w/ enclosures:

Guy R. Horn, Division Manager

of Nuclear Operations

e Cooper Nuclear Station

P.O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • NRC Resident Inspector R. D. Martin, RA
  • Section Chief (DRP/C) *Lisa Shea, RM/ALF

RPSB-DRSS * MIS System

  • NRC RIV File *ProjectEngineer,DRP/C
  • RSTS Operator *W. Long, NRR Project Manager
  • R. Hall *DRS
  • DRP *J. B. Baird
  • R.E.Farrell, SRI
  • w/766

,