Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-88-0151, Monthly Operating Rept for May 1988 for Fermi 2 + (ML20195C916)
- ML20195C918 + (ML20195C918)
- ML20195C919 + (ML20195C919)
- ML20195C923 + (ML20195C923)
- ML20195C926 + (ML20195C926)
- ML20195C927 + (ML20195C927)
- ML20195C929 + (ML20195C929)
- ML20195C930 + (ML20195C930)
- ML20195C931 + (ML20195C931)
- PNO-III-86-049A, on 860519,reactor Trip Occurred Resulting in Multiple Equipment Failures Which Hindered Operator Response Due to Previous Equipment Problems.Augmented Investigation Team Completed Review on 860525 + (ML20195C932)
- ML20195C934 + (ML20195C934)
- AECM-86-0158, Forwards marked-up Listing of Unit 1 Schedule for Implementation of Resolved Generic Issues,Per Request + (ML20195C937)
- ML20195C938 + (ML20195C938)
- ML20195C939 + (ML20195C939)
- ML20195C941 + (ML20195C941)
- ML20195C942 + (ML20195C942)
- ML20195C943 + (ML20195C943)
- ML20195C944 + (ML20195C944)
- ML20195C945 + (ML20195C945)
- ML20195C946 + (ML20195C946)
- U-600552, Requests Addl Exemptions to GDC of 10CFR50,App a Based on Results of Deferral Request Contained in Initial Test Program Activities Projected for Completion After Fuel Load. Justification Encl + (ML20195C947)
- ML20195C948 + (ML20195C948)
- ML20195C950 + (ML20195C950)
- ML20195C951 + (ML20195C951)
- 3F1088-13, Forwards Addl Info Completing Util Response to NRC Bulletin 87-002,Suppls 1 & 2,including Mfg Info for safety-related Inventoried & Noninventoried Items Not Provided in Util 8807220 Ltr + (ML20195C952)
- ML20195C953 + (ML20195C953)
- ML20195C955 + (ML20195C955)
- ML20195C956 + (ML20195C956)
- ML20195C957 + (ML20195C957)
- ML20195C958 + (ML20195C958)
- ML20195C960 + (ML20195C960)
- ML20195C963 + (ML20195C963)
- ML20195C967 + (ML20195C967)
- ML20195C968 + (ML20195C968)
- 05000298/LER-1988-025, :on 880928,Div II Primary & Secondary Containment Isolations Occurred.Caused by Coil Failure of Normally Energized Relay in Reactor & Containment Isolation Logic.Failed Relay Coil Replaced + (ML20195C971)
- ML20195C972 + (ML20195C972)
- ML20195C973 + (ML20195C973)
- ML20195C974 + (ML20195C974)
- ML20195C975 + (ML20195C975)
- 05000298/LER-1988-026, :on 880930,momentary Undervoltage Condition on Emergency Transformer Sensed,Resulting in Auto Startup of Diesel Generators 1 & 2.Cause Unknown.Engineering Evaluation to Be Completed & Necessary Mods Made Prior to Startup + (ML20195C976)
- ML20195C977 + (ML20195C977)
- ML20195C979 + (ML20195C979)
- L-98-195, Provides Response to RAI as Requested During 980924 Conference Call to Support Review of LAR 120.LAR Described Unreviewed Safety Question Resulting from Increase in Locked Rotor Accident Dose Consequences + (ML20195C981)
- ML20195C982 + (ML20195C982)
- L-99-090, Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request + (ML20195C983)
- ML20195C984 + (ML20195C984)
- IR 05000352/1988013 + (ML20195C988)
- ML20195C989 + (ML20195C989)
- ML20195C991 + (ML20195C991)
- ML20195C994 + (ML20195C994)
- ML20195C995 + (ML20195C995)