ML20195C967
| ML20195C967 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 06/03/1988 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kingsley O SYSTEM ENERGY RESOURCES, INC. |
| References | |
| NUDOCS 8806230001 | |
| Download: ML20195C967 (2) | |
Text
'
p&
Q.,,
aun o a m System Energy Resources, Inc.
ATTN: Mr. O. D. Kingsley, Jr.
Vice President, Nuclear Operations P. O. Box 23054 Jackson, MS 39205 Gentlemen:
SUBJECT:
GRANDGULFEMERGENCYPLANREVIEW,REVISIONjd,DOCKETN0.50-416 We have completed our review of Revision 16 to your Grand Gulf Emergency Plan dated February 1, 1988.
Our review indicates that the changes appear to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
Please be retninded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall net be implemented without application to and approval by the Commission. However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).
Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E.Section V.
Should you have any questions regardino this letter, please contact Mr. Thomas R. Decker of our staff at (404) 331-2559.
Sincerely, Douglas M. Collins, Chief tmergency Preparadness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc:
(See page 2) 8806230001 880603
'I PDR ADOCK 05000416 i
F DCD j
_rz. E
s.
y e
System Energy Resources, Inc.
2 cc:
T. H. Cloninger, Vice President, Nuclear Engineering and Support J. E. Cross, GGNS Site Director C. R. Hutchinson, GGNS General Manager J. G. Cesare, Director, Nuclear Licensing R. T. Lally, Manager of Quality Assurance, Middle South Services, Inc.
R. B. McGehee, Esquire Wise, Carter, Child, Steen and Caraway N. S. Reynolds, Esquire Bishop, Cook, Purcell & Reynolds R. W. Jackson, Project Engineer bcc: NRC Resident inspector DRS, Technical Assistant L. Kintner, NRR Document Co m rol Desk State of Mississippi
)
hbh RIl RII RIl f
M 1o AgABoland:lb
(
IPe)eM,e_s 1, c c s.TDecker 05/J//88 05D//88 05/)(/88
-