Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000445/1987035 + (ML20195C676)
- ML20195C677 + (ML20195C677)
- ML20195C679 + (ML20195C679)
- ML20195C681 + (ML20195C681)
- ML20195C683 + (ML20195C683)
- ML20195C686 + (ML20195C686)
- ML20195C688 + (ML20195C688)
- ML20195C689 + (ML20195C689)
- ML20195C692 + (ML20195C692)
- ML20195C693 + (ML20195C693)
- ML20195C694 + (ML20195C694)
- ML20195C696 + (ML20195C696)
- ML20195C697 + (ML20195C697)
- ML20195C698 + (ML20195C698)
- ML20195C699 + (ML20195C699)
- ML20195C700 + (ML20195C700)
- ML20195C703 + (ML20195C703)
- ML20195C705 + (ML20195C705)
- ML20195C707 + (ML20195C707)
- 05000282/LER-1998-012-03, Forwards LER 98-012-03,re Fire Areas 58/73 App R Safe SD Analysis Issues.No New Commitments Made,One Commitment Revised Previously Made Indicated in Corrective Actions + (ML20195C708)
- ML20195C709 + (ML20195C709)
- IR 05000302/1988017 + (ML20195C710)
- ML20195C713 + (ML20195C713)
- ML20195C714 + (ML20195C714)
- ML20195C717 + (ML20195C717)
- ML20195C718 + (ML20195C718)
- ML20195C720 + (ML20195C720)
- ML20195C723 + (ML20195C723)
- ML20195C724 + (ML20195C724)
- ML20195C725 + (ML20195C725)
- ML20195C728 + (ML20195C728)
- ML20195C729 + (ML20195C729)
- 05000282/LER-1998-012, :on 980826,some Cables in Two Fire Areas in Auxiliary Building Were Not Protected by 1 H Fire Barrier. Caused by Error in Rev of Safe SD Analysis.Installed 1 H Fire Rated Barriers to Protect MV-32080 & MV-32163 + (ML20195C731)
- ML20195C732 + (ML20195C732)
- ML20195C735 + (ML20195C735)
- ML20195C736 + (ML20195C736)
- ML20195C739 + (ML20195C739)
- ML20195C742 + (ML20195C742)
- ML20195C747 + (ML20195C747)
- ML20195C750 + (ML20195C750)
- ML20195C751 + (ML20195C751)
- ML20195C752 + (ML20195C752)
- ML20195C754 + (ML20195C754)
- ML20195C756 + (ML20195C756)
- B17516, Requests NRC Review & Approval of LBB Methodology for Pressurizer Surge Piping.Rev 0 to SIR-98-096, Pressurizer Surge Line LBB Evaluation Mnps,Unit 2 & Supporting Documentation,Encl + (ML20195C757)
- ML20195C758 + (ML20195C758)
- 05000321/LER-1999-003-01, :on 990507,incorrect Performance of Equipment Clearance Led to Scram on High Reactor Pressure.Caused by Personnel Error.Personnel Disciplined & Improved Procedure.With + (ML20195C759)
- ML20195C760 + (ML20195C760)
- ML20195C761 + (ML20195C761)
- ML20195C762 + (ML20195C762)
- ML20195C763 + (ML20195C763)