Summary of 881018 Meeting W/Util Re Status of Licensing Issues for Plant.List of Attendees Encl
ML20195C697
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/28/1988
From: Hayes J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8811030298
Download: ML20195C697 (11)


Text

~ . _ _ ,

L.. ,

n.- .

October 28, 1988 DISTRIBUTION See attached sheet Docket No. 50-395 LICENSEE: South Carolina Electric & Gas Company FACILITY: V. C. Summer Nuclear Station, Unit N6. 1 c

SUBJECT:

SUMMARf 0F MCETING WITH SOUTH CAROLIDA ELECTRIC & GAS COMPANY General On October 18 1988, the NRC staff, consisting of representatives of the Office of Nuclear Reactor Regulation, Region !! staff, and the Suireer Resident Inspector met with the South Carolina Electric & Gas Company (SCE&G) to discuss -

the status of the licensing issues for the V. C. Sumer Nuclear Station. The meeting was held at the Summer Station in Jenkinsville, South Carolina. A list of those persons who attended the meeting is includet; an Enclosure 1.

Discussion j A handout was.provided at the meeting which presented the NRC's current assess. i ment of the status of various licensing actions. This handout is included as Enclosure 2. Discussion focused on those licensing actions required for the refueling outage which began on September 16, 1988. During the discussion, it was noted that a closeout letter was actually issued on TAC No. 68956 and not TAC No. 68834 as indicated in Enclosure 2. Likewise, the licensee responded to Boiletin 88 01, "Defects in Westinghouse Circuit Breakers," in a July 12, 1983  ;

letter to the Region II Admin'estrator and provided the results of their long 4 term inspection. A copy of that letter was not trar.smitted to the NRR Project Manager by the licensee. The Senior Resident Inspector at the Sumer Station  ;

closed this iter out in Inspection Report 50-395/88-14 (August 10,1988).

The next meeting is currently scheduled for November 29, 1988 at the Region 11 offices in Atlanta, Georgia.

I

\6\  !

John J. Hayes, Jr., Project Menager Project Directorate 11-1  :

Division of Reactor Projects I/II i l

Enclosures:

l As stated  !

0811030298 881028 l cc w/ enclosures: p DR ADOCK 050 S See.next page i

^--

DR IPH 1 RPR:D:  : f'I-  :  :  :  :

.....:.. ...:. . .....:............:............:............:............:.........., e

' NAME : J :ch : E isam  :  :  :  :  :  ;

i CATE

10/ 88
10 88  :  :  :  :  : t

~* 0 TCTAE'1EC CU W

~Q7 l Y \

N\

Mr. O. S. Bradham South Carolina Electric & Gas Company Virgil C. Sumer Nuclear Station ec:

Mr. William A. Williams, Jr.

Technical Assistant - Nuclear Operations Santee Cooper P.O. Box 764 (Mail Code 153)

Columbia, South Carolina 29218 J. ~ B. Knot ts, Jr. , Esq.

Bishop Cook, Purcell '

and Reynolds 1400 L Street, N.W.

Washington, D. C. 20005-3502 Resident Inspector /Sumer NPS c/o U.S. Nucler Regulatory Comission Route 1, Box 64 -

Jenkinsville, South Carolina 29065

  • Regional Administrator, Region !!

V.S. Nuclear Regulatory Comission, 101 Marietta Street, N.W., Suite 2900 '

Atlanta, Georgia 30323

$ Chairman, Fairfield County Council P.O. Sex 293

. Winnsboro, South Carolina 29180 Attorney General Box 11549 Columbia, Snuth Carolina 29211 Mr. Heyward U, Shealy, Chief Bureau of Radiological Health South Carol'ne Department of Health and Environrantal Control 2600 Bull Street Columbia, South Carolina 29201 South Carolina Electric & Gas Company Mr. A. R. Koon, Jr., Manager Nuclear Licensing Virgli C. Sumer Nuclear Station D. O. Box 88 Jenkinsville, South Carolina 29065 4 - - ..

. \

ENCLOSURE 1 ATTENDANCE OCTOBER 18, 1988 SCE8G NRC M. Williams H. Dance A. Koon, Jr. J. Hayes , Jr.

W. Higgins P. Hopkins

'l

ENCLOSURE 2 STATUS OF NRC TACS FOR THE V. C. SUMMER PLANT OCTOBER 18, 1988 49976 ISI/IST PROGRAMS ISI (MARTIN HUME)

-REVIEWER PROMISED SE BY 6/88.

-ITEM NOW GIVEN LOW PRIORITY.

-PM TO INVESTIGATE WRITING SE HIMSELF.

51287 SPDS (G. WEST)

-SER ISSUED

-THREE OPEN ITEMS

1. TOP LEVEL ICONICS ARE NOT CONTINUOUSLY DISPLAYED.

2.

a. SYSTEM RESPONSE TO OPERATOR COMMANDS IS VERY SLOW.
b. SYSTEM HAS NOT BEEN ABLE TO MEET ITS UNAVAILABILITY GOAL OF LESS THAN 1 %.
c. LACK OF PECUNDANCY IN THA DATA ACQUISITION CONTROLLER AND THE UHIBAR CONTROL SWITCH INCREASES THE VULNERASILITY OF THE SYSTEM TO FAILURES CAUSED BY THESE COMPONENTS.
3. HUMAN FACTOR PRINCIPALS NEED 10 BE RESOLVED.

r L 4. SOME NON-VALID VALUES OR CONDITIONAL FI,AGS EXISTED FOR RHR FLOW RATE, SU8C00 LING MARGIN, FEA0 TOR VESSEL LEVEL INDICATTION SYSTEM (RVLIS), S(ARTUP RATE, CONTAINMENT HYDROGEN. AND SAFETY IN.1?CTION (!!) FLOW.

-RESPONSE SEui FROM THF LICENS6E 6/10/88.

-LICENSEE COMMITTED TO A NEW SPDS TO DE IllSTALLED DURING 1990 REFUELING OUTAGE.

-WILL NECESSITATE NEW NRC REVIEW CYCLE.

-ANTICIPATED CLOSURE OF THIS ITEM IS 12/31/90.

-LETTER TO BE SENT TO SCE8G 11/88 INDICATING REVISED REVIEW SCHEDULE.

51606 RV AND SV TESTING (II.D.1) (GARY HAMMER)

-SCE&G SUBMITTED RESPONSE TO STAFF COMMENTS ON 5/9/88.

-ADDITIONAL QUESTIONS SUPPLIED TO SCE&G AS A RESULT

0F THEIR 5/9/88 RESPONSE.

-DRAFT OF SCE&G RESPONSES TO NRC QUESTIONS GIVEN TO HAMMER ON 7/25/88.

-CONFERENCE CALL ~ HELD ON THE RESPONSES 8/10/88.

-SCE&G TO TRANSMITT INFORMATION:

(1) DRAWING C-314-601; (2) ACCEPTANCE CRITERIA F00 NORMAL, ,

EMERGENCY, AND UPSET CONDITIONS; (3) EXPLANATION OF DISCREPANCIES BETWEEN RESPONSES TO QUESTIONS 6 AND 9 AND FSAR F TABLE 5.2.3.

53406 AUTO SHUNT TRIP TS, GL 83-28 ITEH4.3 (DON LASHER)

-RAI ISSUED.

-CLARIFICATION

-THAT TS TABLE 4.3-1 FUNCTIONAL UNIT NO. 1 "MANUAL REACTOR TRIP" APPLIES TO RT BYPASS i BREAKERS AS WELL AS RT BREAKERS.

-T3 TABLE 4.3-1 NOTATION 13 DOES NOT COMPLY WITH THE GL WHICH SPECIFIES AN AUTOMATIC UNDERV0LTAGE TRIP.

-RESPONSE DUE FROM THE LICENSEE 4/88.

53720 ITEM 2.2 0F GL 83 28, EQUIP. CLASSIFICATION AND VENDOR INTERFACE FOR S/,FETY RELATED COMPONENTS (DON LASHER)

-FARLEY TO BE HANDLED AS THE LEAD PLAkT

-TER ISSUED BY FG&fi

-OPEN ITEMS ARE:

-CONTACT VENDORS OF XEY COMPONENTS SUCH AS AFW PUMPS, ECCS PUMPS SAFETY RELATED BATTERIES, AND SAFETY RELATED VALVES TO FACILITATE THE EXCHANGE OF CURRENT TECilNICAL INFORMATION.

> AN NFORMAL INTEPFACE AGREEMENT SHOULO BE ESTABLISHEO. r

-FOR DGs AND SAFETY RELATED SWITCHGEAR VENDORS A FORMAL INTERFACE SIMILAR TO THAT WITH THE NSSS SHOULD BE ESTAB' !SHED.

-PM TO INVESTIGATE WAITING SE HIMSELF.

53942 ITEMS 4.2.3 & 4.2.4 0F GL 83-28, PREVENTIVE MAINTENANCE FROGPAM FOA RX TRIP BREAKERS, LIFE TESTING & REPLACEMENT (A. TOLSTON) o -BULLETIN IS BEING PREPARED TO SEND TO CRGR EY 1/89.

54030 ITEMS 4.5.2 & 4.5.3 Oc GL 83-28, REACT 0P TRIP .

. SYSTEM FUNCTIONAL TESTING, ALTERNATIVES & TEST INTERVALS (D. LASHER)

~

-4.5.2. COMPLETED.

-TRYING TO CLOSE OUT ON A GENERIC BASIS,

. -RESOLUTION EXPECTED 1/89.

. \

55344 PROCEDURES GENERATION PACKAGES (SUPPLEMENT 1, .

NUREG- 0737) (GEORGE LAPINSKY)

-DRAFT SE ISSUED 6/29/87.

-PROBLEMS IDENTIFIED INCLUDED:

1. PLANT SPECIFIC TECHNICAL GUIDELINES.
2. WRITERS GUIDE.
3. PROGRAM USED FOR VALIDATION OF E0Ps.  ;
4. TRAINING PROGRAM FOR UPGRADED E0Ps. ,

-SCF&G WAS TO RESPOND TO THE STAFF COMMENTS 5/88.

-NRC TO PERFORM INSPECTION OF 16 FACILITIES TO DETERMINE IF A DIFFERENT APPROACH IS NECESSARY IN THIS AREA.

56935 RCP TRIP CRITERIA, GL 83-100 (S. L. WU)

-SE FROM REVIEWER TO PM SCHEDULED 2/89.

59402 40 YEAR OL LIFE AMENDMENT

-LICENSEE RESPONDED TO RAI 3/30/88.

-ITEM HAS THE LOWEST OF PRIORITIES (4).

-WILL EVALUATE P:t PERFORMING THE REVIEW.

59451 DIESEL GENERATCRS TS (J. LAZEVNICK)

-REQUEST FOR ADDITIONAL INFORMATION SUBHITTED TO SCE&G 11/9/87.

-CONMENTS ON 11/9/87 LETTER DEALT WITH TS 3/4.8.1.1 AND 4.8.1.2.

-RESPONSE TO RAI FROM LICENSEE 5/16/38.

-7/28/88 SUBMITTAL FROM SCE&G MODIFIED TS

4.8.1.1.2.a.3 OY SPLITTING INTO 2 SEPARATE SURVEILLANCE REQUIREMENTS. ,

i -RE-SHOLLIED 8/25/88.  !

i -CONFERENCE CALL HELD 9/14/88.

-SCE&G TO SUBMIT AE VISED TS. t

', 62803 CONTAINHENT STPUCTURE INTEGRITY (C. P. TAN) l

-LICENSEE REPONSE SENT 3/17/88.

> -NRC REVIEW TO BE COMPLETED 4/15/88.

-MEETING HELD 5/16/98 AND 9/14/88.

-SCE&G SUBMITTAL OF 9/29/88 ADDRESSED PREVIOUS CONCERNS..

64811 RSB 5-1, NATURAL CIRCULATION TEST OF THE REACTOR l .

COOLANT

-REACTOR ' SYSTEMS BRANCil TO REVIEW THIS ITEM.

65060 REMOVAL 0F FIRE PROTECTION REQUIREMENTS FROM THE TS GL 86-10 l -RE-SHOLLY ISSUED 2/24/88.

-AMENDMENT TO HAVE BEEN ISSUEU 5/88.

-CONCURRENCE STOPPED DUE TO FORTHCOMING GUIDANCE IN GENERIC LETTER TO BE ISSUED.

-GENERIC LETTER ISSUED 8/3/88.

-MEETING HELD 8/17/88 TO DISCUSS REVISED SUBMITTAL AND GENERIC LETTER.

-LICENSEE TO REVISE AMENDMENT REQUEST DURING 4TH QUARTER 1980.

65778 REMOVAL OF ORGANIZATIONAL CHARTS FROM THE TS

-SCE&G PROVIDED RESPONSE BASED UPON GL 88-06 ON 5/16/88..

-T0 BE RE-SHOLLY 8/25/88.

, -AMENDMENT TO BE ISSUFD 11/88.

66258 LOSS OF RHR WHILE RCS PARTIALLY FILLED, '/2 LOOP OPERATION

-COP:ES OT SCE&G SUBMITTAL SENT TO LEAD PH AhD LEAD REVIEWER.

67327 FAPIDLY PROPAGATING FATIGUE CRACKS IN SG TUBES, EULLETIN 88-02

-LICENSEE RESPONSE SENT 3/24/88. ,

, -FM TO CLOSE OUT THE WEEK 0F 10/17/88. j 67340 ORGANIZATICNAL CHARTS TO REFLECT 1/25/S8 REORGANIZATION  :

-AMENDMENT TO BE ISSUED 11/88.

67727 HESPONSE TO BbtLCTIN 88-01, DEFECTS IN WESTINGHOUSE >

CIRCUIT BREAKERS.

-RESPONSE PROVIDED ON 3/30/88 ON SHORT TERM INSPECTION.

-RESPONSE REQUIRED WITHIN 30 DAYS AFTER LONG TERM j INSPECTION.  ;

t 67811 VAtiTAGE 5 FUEL., SPENT F'JEL STORAGE (S. L. WU)  !

-AMENDMENT TO SE ISSUFO 10/88.  :

e 67812 ISI RELIEF, HYDROSTATIC TESTING OF THE SGB SYSTEM (M. HUME)

-SE TO BE ISSUED TO PM 1/89.

68045 SINGLE CELL CHARGING OF SAFETY RELATED BATTERIES (A. TOLSTON)

-QUESTIONS ISSUED TO THE LICENSEE 6/27/88.

-RESPONSES RECEIVED 8/29/88.

-TECHNICAL GROUP TO PROVIDE SE 11/88.

68046 IST 12/23/87 PROGRAM REVISION (K. DEMPSEY) ,

-SER ISSUED 4/19/88

-SOME RELIEFS DENIED, SOME GRANTED

-LICENSEE MUST ADDRESS APPENDIX C OF THE TER WHICH  !

COVERS OMISSIONS AND INCONSISTESCIES IN THE PROGRAM.

-ilEETING HELD 6/1/88 TO DISCUSS RELIEFS WHICH WERE DENIED AND 12/23/87 REVISED PROGRAM.

-REVISED PROGRAM SUBMITTED BY SCE&G 8/31/88. ,

-TER TO BE ISSUED BY EG&G, IDAHO APPR0XIMATELY 3/89.

~

j 68274 SG TUBE SLEEVING f

-AMENDMENT REQUEST TO BE RETURNED TO SCE&G 10/88.

L 68613 IMPLEMENTATION OF STATION ELACK0UT RULE, 10 CFR 50.63, A-22 (A. GILL)

-RESPONSE DUE 4/17/89

. 66644 VANTAGE 5 FUEL, REMAINING TS SECTIONS (S. L. WU) ,

-SE TO BE ISSUED BY TECHNICAL STAFF 11/88.

68680 BULLETIN 88-08, "THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS

-RESPONSE SUBMITTED 9/29/88. ,

MEETING HELD 10/6/88.

-A60!TIONAL INFORMATION NEEDED FROM SCE&G PRIOR TO RESTART. i 68834 BULLETIN 88-05, NON-CONF 0RMING MATERIALS SUPPLIED BY PIPING SUPPLIES, INC. AT FOLSOM, N.J. AND WEST JERSEY MANUFACTURING CO. AT WILLIAMSTOWN, N. J.,

D-104.

-RESPONSE SUBMITTED 9/13/88. f

. -WRITTEN RESPONSE DUE 60 DAYS AFTER COMPLETION OF I

,. ,o C.L SCHEDULED ACTIONS.

-LETTER SENT CLOSING OUT THIS ACTION 10/6/88.

68956 BORIC ACID CORR 0'SION OF C-STEEL COMPONENTS IN PWR PLANTS GL 88-05

-LICENSEE RESPONDED 6/3/88.

-EVALUATION OF LOCATION OF C-STEEL REACTOR COOLANT PRESSURE BOUNDARY COMPONENTS AND THEIR VULNERABILITY TO BE COMPLETED BY 9/30/88.

-0ESIGN ENGINEERING TO DEVELOPE 0 GUIDELINES FOR EXAMINATION AND EVALUATION OF BORIC ACID BUILDUP ON SAFETY RE).ATED CLASS 1 PRIMARY BOUNDARY COMPONENTS.

-HAINTENANCE VALVE PACKING PROGRAM 8EING IMPLEMENTED.

-MODIFICATIONS TO CONOSEALS PLANNED AND TO FITTINGS USED TO SEAL INCORE THERMOCOUPLES WIRING ON CONOSEAL ASSEMBLY.

69066 STEAM GENERATOR, L* (H. CONRAD)

-ENVIRONMENTAL ASSESSMENT PUBLISHED IN THE FEDERAL REGISTER 10/88.

????? BULLETIN 88-03, INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GE.

-RESPONSE DUE WITHIN 30 DAYS FOLLOWING RESTART ,

AFTER THIS REFUELING OUTAGE. l

????? BULLETIN 88-04, POTENTIAL SAFETY RELATED PUMP LOSS.

-WRITTEN RESPONSE DATED 7/8/88.

-VENDOR INFORMATION NEE 0'E0 UN EFW PUMPS HINIMUM FLOW REQUIREMENTS TO PREVENT DEGRADATION FROM HYDRAULIC INSTABILITY WAS DUE 8/88.

-WRITTEN RESPONSE OVE WITHIN 30 DAYS OF COMPLETION OF THE LONG TERM RESOLUTION ACTIONS. .

????? BULLETIN 87-02 SUPPLEMENT 1, "FASTENERS TESTING T9 DETERMINE CONFORMANCE APLLICABLE MATERIAL SPECIFICATIONS"

-RESPONSE SUBMITTED 7/20/88.

????? GENERIC LETTER 88-11. "NRC POSITION ON RADIATION EMBRITTLEMENT OF REACTOR VESSEL HATERIAL AND ITS ,

IMPACT ON PLANT OPERATIONS.

-RESPONSE OUE 1/12/89.

????? BULLETIN 88-09, "THIMBLE TUBE THINNING IN i

WESTINGHOUSE REACTORS"

-ESTABLISH INSPECTION PROGRAM AND IMPLEMENT PROGRAM.

-INSPECTION TO BE CONOUCTED DURING THIS OUTAGE.

-RESPONSE DUE WITHIN 30 DAYS FOLLOWING THE INSPECTION.

????? GENERIC LETTER 88-14 "INSTRUMENT AIR SUPPLY SYSTEM

, PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT"

-RESPONSE DUE APPR0XIMATELY 2/15/89.

-REQUIRES DESIGN AND OPERATIONS VERIFICATION.

TACS CLOSED TAC NO. DESCRIPTION OF THE TAC DATE CLOSED 51137 RG 1.97 INSTRUMENTATION (BARRY MARCUS) 7/27/88 56169 THI ACTION ITEM I.0.1.2, DETAILED 5/12/88 CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT (GEORGE LAPINSKY)

~

59146 10CFR50.62 OPERATING REACTORS REVIEW 7/28/88 ATWS (R. STEVENS) 64558 RB COOLING SYSTEM 4/13/88 65321 PHYSICAL SECURITY PLAN 5/26/86 65779 FISSION CHAMBER DETECTORS 6/27/88 6707/ SERVICE WATER PUMP ROOH TEMPERATURE 6/6/88 MONITORING TS 3.7.1.1.

67279 STEAM BINDING OF AFW PUMPS, GL 88-03, 5/25/88 ,

MPA B-98 ,

67339 TS AMEN 0 MENT TO SECTION 6 ON NSRC 6/13/88 ADDITION OF EXEC. VP 67920 INTEGRATED LEAKRATE TESTING 9/15/88

, i t

r

l l

DISTRIBUTION FOR NEETING

SUMMARY

DATED: October 28, 1988 Facility: V. C. Sumer Nuclear Station, Unit No.1

'DockcFFile- I NRC PDR l Local POR l PDil-1 Reading l E. Adensam P. Anderson J. Hayes OGC E. Jordan INNBB 3302)

B. Grimes 19A2)

H. Dance, RI!

P. Hopkins ACRS (10)

B. Troskoski (17D19) cc: Licensee / Applicant Service List b

Nfol I